Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.
Review notes availableColumbia Data Center
Columbia, MO
Reported status: proposed
Exact location not published.
Original source · 2026-06-18
Review note: Independent address, operator, physical building and rights provenance needed before canonical identity or geometry promotion.
research-final:MO:254ba2b91de64812ba44Review notes availableMonsanto New Data Center
Creve Coeur, MO
Reported status: existing (EPA facility record; status unverified)
Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: EPA facility/permit evidence cannot prove an operating data-center identity or IT power; retain source as research only.
research-final:MO:d90800f1284ad92b0425Review notes availableFormer Emerson Campus Data Center (Next Revolution Technologies)
Ferguson, MO · Next Revolution Technologies LLC
Reported status: proposed
Reported capacity: 300 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-13
Review note: Independent address, operator, physical building and rights provenance needed before canonical identity or geometry promotion.
research-final:MO:6970085282c3634f7dbaReview notes availableUnnamed research feature in Ferrelview
Ferrelview, MO
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-10 (QLever osm-planet)
Review note: verify whether Northland/Ferrelview labels share Meta Golden Plains campus; unnamed map entries not independent
research-final:MO:4f99671cc23516f4b3b7Review notes availableMeta Data Center
Ferrelview, MO · Prime Data Centers
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-18
Review note: verify whether Northland/Ferrelview labels share Meta Golden Plains campus; unnamed map entries not independent
research-final:MO:0463afc58a23c6f381bbReview notes availableUnnamed source-mapped location
Ferrelview, MO
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-02-09
Review note: verify whether Northland/Ferrelview labels share Meta Golden Plains campus; unnamed map entries not independent
research-final:MO:73634e5ee4099bbbbf15Review notes availableCRG Festus Data Center
Festus, MO · CRG
Reported status: proposed
Reported capacity: 1.0 GW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-15
Review note: CRG/Festus proposal naming cluster, one physical campus candidate
research-final:MO:b546252543e112da0d19Review notes availableFestus Data Center
Festus, MO · CRG
Reported status: proposed
Exact location not published.
Original source · 2026-06-18
Review note: CRG/Festus proposal naming cluster, one physical campus candidate
research-final:MO:9f9a90af31dfe93d0b14Review notes availableFestus Data Center Campus
Festus, MO · CRG (Clayco)
Reported status: proposed
Reported capacity: 600 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-08-24
Review note: CRG/Festus proposal naming cluster, one physical campus candidate
research-final:MO:76412f8a587b0e73e76eReview notes availableForistell I-70 Data Center Site (216-acre annexation)
Foristell, MO · Undisclosed developer
Reported status: proposed
Exact location not published.
Original source · 2026-10-13
Review note: Independent address, operator, physical building and rights provenance needed before canonical identity or geometry promotion.
research-final:MO:0a5144074a3e00981e1dReview notes availableCenturyLink
Hamilton, MO
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-10 (QLever osm-planet)
Review note: Independent address, operator, physical building and rights provenance needed before canonical identity or geometry promotion.
research-final:MO:654f40e841833509c797Review notes availableS C Data Center
Hannibal, MO
Reported status: existing (EPA facility record; status unverified)
Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: EPA facility/permit evidence cannot prove an operating data-center identity or IT power; retain source as research only.
research-final:MO:1bc02e286656212e66cbReview notes availableSC Data Center
Hannibal, MO
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-10-28
Review note: Independent address, operator, physical building and rights provenance needed before canonical identity or geometry promotion.
research-final:MO:594e5069b862bc8fdfd3Review notes availableBridge Data Center
Hazelwood, MO
Reported status: existing (EPA facility record; status unverified)
Exact location not published.
Original source · 2026-10-28
Review note: EPA facility/permit evidence cannot prove an operating data-center identity or IT power; retain source as research only.
research-final:MO:6f8ffc3860cad1d9e015Review notes availableHematite Bitcoin Mining Facility
Hematite, MO · NYDIG / Global Connect Communications
Reported status: approved/permitted
Exact location not published.
Original source · 2026-08-24
Review note: Inactive/proposal lifecycle record not evidence of a live operating facility or measured power.
research-final:MO:f8335a37fb01a942082eReview notes availableNebius AI Factory (Independence)
Independence, MO · Nebius Group
Reported status: under construction
Reported capacity: 1200 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-22
Review note: Nebius Independence campus aliases, phases not counted independently
research-final:MO:93a4256470c0d415091aReview notes availableNebius Data Center
Independence, MO · Patmos
Reported status: under construction
Reported capacity: 880.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
Review note: Nebius Independence campus aliases, phases not counted independently
research-final:MO:0af4ef5794c46dae8b3aReview notes availableNebius Independence Data Center Campus
Independence, MO · Nebius
Reported status: under construction
Reported capacity: 800 MW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Independence. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-06-15
Review note: Nebius Independence campus aliases, phases not counted independently
research-final:MO:8ce11c64988bfc4e2ce2Review notes availableWildwood Ranch / Joplin Data Center
Joplin, MO · Wildwood Ranch LLC; unnamed heavy-industrial/data-center developer
Reported status: proposed
Reported capacity: 200 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-17
Review note: Independent address, operator, physical building and rights provenance needed before canonical identity or geometry promotion.
research-final:MO:08179d2f049c4f5236a8Review notes availableUnnamed research feature in Kansas City
Kansas City, MO
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-10 (QLever osm-planet)
Review note: Independent address, operator, physical building and rights provenance needed before canonical identity or geometry promotion.
research-final:MO:441d5eecd0d1e7c79e0aReview notes available934 Central Data Center — proposed 384-foot structure with ground-floor retail and a data center (development plan CD-CPC-2026-00074, Ordinance No. 260870)
Kansas City, MO
Reported status: proposed
Exact location not published.
Original source · 2026-09-24
Review note: Independent address, operator, physical building and rights provenance needed before canonical identity or geometry promotion.
research-final:MO:553c4c61f136693178c6Review notes availableAmeritrade-Kansas City Data Center
Kansas City, MO
Reported status: existing (EPA facility record; status unverified)
Regulatory reference: FRS facility point (stated accuracy 300 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: EPA facility/permit evidence cannot prove an operating data-center identity or IT power; retain source as research only.
research-final:MO:a993bb7c879f7638f3e0Review notes availableBlack Rock Financial Management
Kansas City, MO
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-14
Review note: Independent address, operator, physical building and rights provenance needed before canonical identity or geometry promotion.
research-final:MO:9241e7a184fdf27aa528Review notes availableBryant Building
Kansas City, MO
Reported status: existing (mapped; status unverified)
Source reference: Wikidata P625 coordinate. Wikidata; not a verified facility pin.
Original source · 2026-10-28
Review note: Independent address, operator, physical building and rights provenance needed before canonical identity or geometry promotion.
research-final:MO:fd3225b9a517b854dd07Review notes availableCerner Whq Data Center
Kansas City, MO
Reported status: existing (EPA facility record; status unverified)
Exact location not published.
Original source · 2026-10-28
Review note: EPA facility/permit evidence cannot prove an operating data-center identity or IT power; retain source as research only.
research-final:MO:edad39ae2ec0b12c384fReview notes availableCube Na Data Center Company Llc
Kansas City, MO
Reported status: approved/permitted (EPA air-permit record)
Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: EPA facility/permit evidence cannot prove an operating data-center identity or IT power; retain source as research only.
research-final:MO:055d7a82f5de0eb8d01bReview notes availableEdged Data Centers Kansas City
Kansas City, MO · Edged Energy; Evergy
Reported status: operational
Reported capacity: 26 MW (scope and operation unverified)
Source reference: address match (exact): 3420 N ARLINGTON AVE, KANSAS CITY, MO, 64161. Census Geocoder; not a verified facility pin.
Original source · 2026-06-15
Review note: same Edged facility address candidate; certificate and operator evidence must resolve exact site
research-final:MO:8f1c357ddcc27426cc54Review notes availableGoogle Kansas City Data Center
Kansas City, MO · Google
Reported status: under construction
Reported capacity: 400 MW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Kansas City. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-06-15
Review note: Google Kansas City generic vs Hunt Midwest; may differ from Mica, no conflation
research-final:MO:ab3f7dea206e737c50b8Review notes availableGoogle Kansas City Data Center (Hunt Midwest Business Center)
Kansas City, MO · Google
Reported status: under construction
Exact location not published.
Original source · 2026-09-23
Review note: Google Kansas City generic vs Hunt Midwest; may differ from Mica, no conflation
research-final:MO:d50b87986ee81a4af48dReview notes availableIP Pathways KC1
Kansas City, MO · IP Pathways, LLC
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Review note: Independent address, operator, physical building and rights provenance needed before canonical identity or geometry promotion.
research-final:MO:4e91830c01c58834c156