Greensparc Wrangell Edge Data Center
Wrangell, AK · Greensparc; City and Borough of Wrangell
Reported status: proposed
Reported capacity: 3.5 MW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Wrangell. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-07-17
Read 3 source findings (2026-10-28)
Wrangell Sentinel reporting distributed by KSTK says borough assembly voted unanimously June 9, 2026 to reject Greensparc's lease application for an approximately 10,000-square-foot center at the borough-owned 6-Mile Mill deepwater port. The rejection applies to that site lease, not all future Greensparc Alaska projects or an independently verified final company cancellation. Evidence
Municipal meeting index lists the June 9, 2026 borough assembly meeting, agenda and packet, but no signed minutes at the checked listing. It supports the meeting date, not independent certification of the reported outcome or later reconsideration. Evidence
The earlier proposed Wrangell 3.5-MW power ambition is a planning figure, not current metered usage. No separate second Wrangell building or independent 3.5-MW operating facility is evidenced. Evidence