Greensparc Cordova Data Center (Humpback Creek Hydro)
Cordova, AK · Greensparc
Reported status: operational
Reported capacity: 0.17 MW operational (scope and operation unverified)
Exact location not published.
Original source · 2026-10-18
Read 2 source findings (2026-10-28)
Greensparc says one 150-kW modular Cordova Electric center was deployed at Humpback Creek Hydro in spring 2024; exact site coordinate and present metered load are not certified. Evidence
NREL corroborates the hydro-plant edge data center concept; a second separate Cordova building is not established. Evidence