Compute Equity Atlas
State research database

AK research records

6,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.

22 source records · 22 with recorded source findings · 4 public-domain reference locations. Source checks do not mean every claim is confirmed.

National map · Open state database

1 matching source records

Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.

Source findings available

Greensparc Cordova Edge Data Center

Cordova, AK · Greensparc; Cordova Electric Cooperative; Hewlett Packard Enterprise

Reported status: operational (expansion)

Reported capacity: 0.15 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Cordova. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

Read 2 source findings (2026-10-28)

Operator describes one 150-kW Cordova Electric project from spring 2024, consistent with research row 8. Evidence

Greensparc's April 2024 announcement identifies Humpback Creek deployment, not a distinct second Cordova facility. Evidence

Related source record; possible shared facility

research-final:AK:d6f4d84f892bc4eda698
Research database | Compute Equity Atlas