Fairfield Colocation Data Center
Fairfield, AL
Reported status: proposed
Reported capacity: 45 MW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Fairfield. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-07-17
Read 3 source findings (2026-10-28)
WBHM attributes the former-Walmart proposal to Patmos, with an initial proposed 20 MW and eventual 45 MW target. These are project plans, not operating or energized capacity. Supplier's generic Fairfield project likely describes the same proposal as row 51, but a merge needs parcel/permit identity. Evidence
Fairfield council temporarily blocked future data-center proposals while existing Patmos proposal remained under consideration. Moratorium is not evidence of denial or approval of this particular project. Evidence
Patmos advertised an August 12 Fairfield technology campus town hall, corroborating an intended project rather than a completed data center. Evidence