VoltCore Somerville Bitcoin Mining Data Center
Somerville, AL · VoltCore
Reported status: cancelled
Reported capacity: 50 MW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Somerville. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-07-17
Read 3 source findings (2026-10-28)
WAFF traces Union Road land ownership to Sovereign Gazelle and reports earlier outreach by VoltCore representatives; this supports an apparent single proposed project with different legal/contracting roles, not proof VoltCore is the owner. Evidence
After the June county moratorium, route-marking utility work and right-of-way alternatives were reported. Chairman Ray Long said the moratorium was not enforceable for this parcel; thus supplier 'cancelled' is not a substantiated final legal or operating disposition. Evidence
Moratorium vote addresses the proposed Union Road cryptomine but is a regulatory pause/statement, not a signed permanent project cancellation decision or verified commissioning. Evidence