Cielo Clarksville Data Center
Clarksville city · TN
Documented capacity: 350 MW
5 linked evidence rows · locality centroid; exact site unresolved
Open project evidence record →This state has reviewed research coverage from the national 50-state Atlas. Exact project locations are published only after source evidence establishes coordinates; state-level, regulatory, utility and prospective evidence remains visible without inventing map precision.
The current reviewed research set contains 7 accepted evidence records for Tennessee, including 2 confirmed and 5 accepted prospective rows, with a research cutoff of 2026-08-20. These are evidence records, not a count of unique facilities.
Prospective records remain labeled as proposals, applications, forecasts, targets, queue entries or other non-operational states. The Atlas does not convert state-level or locality evidence into a precise project point unless a controlling source supports that location.
Source-exact records use supported coordinates. Dashed rings mark Census address-range geocodes, not rooftop or surveyed coordinates. Qualified research candidates are shown separately at Census locality or county centroids when that is the strongest source-backed geography; those markers do not claim a precise site coordinate.
This project layer combines available project-profile, permit/intent and civic-impact evidence. Records retain unresolved location precision and limitations rather than inventing coordinates.
Clarksville city · TN
Documented capacity: 350 MW
5 linked evidence rows · locality centroid; exact site unresolved
Open project evidence record →Memphis · TN
20 linked evidence rows · locality centroid; exact site unresolved
TN
Documented capacity: 50 MW
5 linked evidence rows · coordinate not inferred
Open project evidence record →TN
Documented capacity: 60 MW
5 linked evidence rows · coordinate not inferred
Open project evidence record →Memphis · TN
Documented capacity: 350 MW
60 linked evidence rows · locality centroid; exact site unresolved
Gallatin city · TN
Documented capacity: 300 MW
5 linked evidence rows · locality centroid; exact site unresolved
Open project evidence record →Oak Ridge · TN
80 linked evidence rows · locality centroid; exact site unresolved
TN
Documented capacity: 1600 MW
5 linked evidence rows · coordinate not inferred
Open project evidence record →These dated decisions, filings, research collections and supporting-infrastructure records provide context. They are not additional data-center facilities.
City of Hendersonville, Sumner County, Tennessee · Planning team
Contact about: Could you share the location of the current city plan, planning staff reports and public amendment archive, with dates identifying the operative versions?
Source status: historical org page evidence. Verify the linked public source before relying on an assignment because staff and routing can change.
This record is a regional research collection or market overview. It is not an individual data-center facility.
Read reference context →Contact about: County planning documents, staff reports and local service-boundary questions.
This route was retained from current or recently revalidated public-source evidence.
1 source-backed contact records are available for planning, zoning, permitting, public comments, economic development, project questions and related infrastructure issues. Verify the linked source before relying on a contact because assignments can change.
Director, Center for Service Learning and Civic Engagement · Tennessee State University
Relevant to: HBCU and place-based anchor institution · Nashville / Tennessee State University campus and surrounding Nashville/community partners
Explore whether the Center would be open to an educational exchange on translating source-backed public records and data-center/digital-infrastructure decisions into accessible civic-learning materials, with attention to community partners, student…
Contact details: Dr. Erik Schmeller; Director, Center for Service Learning and Civic Engagement; Tennessee State University; eschmeller@tnstate.edu
Limitation: Do not claim TSU or the Center has studied data centers, broadband, digital infrastructure, or local impacts; do not imply endorsement, partnership, funding, student…