This canonical record consolidates 13 source-backed observations without discarding aliases, limitations or unresolved dimensions.

approved_or_permittedproject status
VERIFIED_PRIMARYbest evidence tier
13linked evidence rows
Project facts

Location and operating record

Operator / developerAligned lists DFW-04 at 601 North Star Rd, Plano
JurisdictionCollin County / City of Plano, TX
Address2800 Summit Ave, Plano, Collin County, TX 75074
Location precisionexact coordinate
Coordinates33.009722, -96.675
CapacityNot established
AliasesADC Plano · ADC Plano (Aligned Data Centers, TCEQ 131651)
Evidence coverage

What has been researched

Project profile10 rows
Intent / permits1 rows
Civic / infrastructure2 rows
EXACT LOCATION

ADC Plano: exact location

VERIFIED_PRIMARY

TCEQ air-permit notice for registration 131651 places the site at a Summit Avenue address in Plano with published coordinates

Key data: 2800 Summit Ave, Plano, Collin County, TX 75074; latitude 33.009722, longitude -96.675

Limitation: Parcel/APN not published in the notice; only the street address and lat-long were available

Open source →

OWNERSHIP CHAIN

ADC Plano: ownership chain

CORROBORATED

Permit-tracking record lists the permittee as a Plano-specific propco under the Aligned REIT

Key data: Permittee "ALIGNED DATA CENTERS PLANO PROPCO LLC"; ultimate entity "Aligned Data Centers REIT, LLC"

Limitation: Deed-level Collin CAD ownership was not retrieved; propco-to-REIT link comes from the aggregator, not a recorded deed

Open source →

OPERATOR

ADC Plano: operator

VERIFIED_PRIMARY

Aligned operates its Dallas-market campuses under the DFW naming series

Key data: Aligned lists DFW-04 at 601 North Star Rd, Plano

Limitation: The Summit Ave permit site and the 601 North Star Rd campus are separate addresses; operator identity is Aligned in both cases but building-level mapping is unconfirmed

Open source →

POWER SUPPLIER

ADC Plano: power supplier

CORROBORATED

Local reporting ties the new Plano data center to an adjacent electric substation at North Star Rd and E Plano Pkwy approved by City Council

Key data: Data center sited next to an existing substation at North Star Road / East Plano Parkway

Limitation: The retail utility name (Oncor as wires provider / ERCOT as grid operator) was not stated on any page fetched, so it is left unnamed here

Open source →

WATER SUPPLIER

ADC Plano: water supplier

DISCOVERY_LEAD

NOT_FOUND — searched TCEQ notice, Aligned's Dallas page and Plano council coverage; no water utility, source or service agreement named

Limitation: Air permits do not cover water service; a City of Plano utility agreement or NTMWD supply reference would be the next place to look

Open source →

JURISDICTION STACK

ADC Plano: jurisdiction stack

CORROBORATED

Air permitting is state-level via TCEQ; land use ran through Plano City Council; county is Collin

Key data: TCEQ registration 131651; City of Plano council SUP action; Collin County

Limitation: No MUD, PID or special district was identified for this in-city site

Open source →

PLANNING ZONING CONTACT

ADC Plano: planning zoning contact

VERIFIED_PRIMARY

Land-use approval was a specific-use permit heard by Plano City Council; the TCEQ notice provides the state comment channel

Key data: TCEQ public comment 1-800-687-4040 and www14.tceq.texas.gov/epic/eComment/

Limitation: No named Plano planner or case manager was published on the pages fetched

Open source →

ECON DEV CONTACT

ADC Plano: econ dev contact

DISCOVERY_LEAD

NOT_FOUND — no Plano EDC contact or incentive agreement surfaced for this project

Limitation: Plano Economic Development staff directory was not fetched this session

Open source →

GENERAL CONTACT

ADC Plano: general contact

VERIFIED_PRIMARY

The TCEQ application lists a named Aligned operations contact with direct phone

Key data: Fabio Moura, Director of Operations, (214) 949-2569

Limitation: Contact is the permit applicant contact, not a public-affairs line

Open source →

SURROUNDING INFRASTRUCTURE

ADC Plano: surrounding infrastructure

CORROBORATED

An electric substation sits immediately adjacent to the approved data center site

Key data: Substation at North Star Road / East Plano Parkway adjoining the site

Limitation: Transmission voltages, water/sewer trunk mains, rail and fiber routes not identified

Open source →

AIR PERMIT APPLICATION

ADC Plano: air permit application

"Pending" (application appears on TCEQ pending-applications report)

Status date: Received 03/30/2026

Limitation: County/city not stated on the report; page timed out on first fetch and required a retry. No MW or generator count on the report.

Open source →

DECOMMISSIONING PROVISION

ADC Plano: decommissioning provision

NOT_FOUND

NOT_FOUND. The two rezoning/PUD records fetched in full — Round Rock PUD25-00009 and Fort Worth ZC-25-205 — contain **no** decommissioning, hardware-removal, or site-restoration condition (Round Rock's staff report and Fort Worth's case file are explicit on the conditions imposed, and none address end-of-life). No Texas county or city ordinance requiring data-center decommissioning plans was located for the named jurisdictions.

Key data: Zero decommissioning conditions in PUD25-00009 and ZC-25-205

Status date: 2026-02-10

Limitation: Absence confirmed only for these two cases; Bexar, Hill, Collin, Armstrong case files were not obtained. (confidence detail: VERIFIED_PRIMARY (absence in fetched records))

Open source →

ALL DIMENSIONS (civic layer)

ADC Plano: all dimensions (civic layer)

NOT_FOUND (civic dimensions)

NOT_FOUND for civic dimensions. The only records surfaced for permit 131651 are TCEQ's pending-permit listing (technically complete, received 03/30/2026) and bilingual notice of receipt/intent; Plano's SUP approvals for the data center and its substation were reported without opposition, litigation, water volume, MW, incentive value, noise variance, or EJ analysis.

Key data: TCEQ permit 131651 received 2026-03-30 (renewal, technically complete)

Status date: 2026-03-30

Limitation: Sources seen via search result content; Plano council minutes not fetched. Collin County abatement records not searched successfully.

Open source →

Sources

Evidence and provenance

  • Texas Commission on Environmental Quality · VERIFIED PRIMARY
    Limitation: Parcel/APN not published in the notice; only the street address and lat-long were available
  • Canonical Groundwork (permit aggregation) · CORROBORATED
    Limitation: Deed-level Collin CAD ownership was not retrieved; propco-to-REIT link comes from the aggregator, not a recorded deed
  • Aligned Data Centers · VERIFIED PRIMARY
    Limitation: The Summit Ave permit site and the 601 North Star Rd campus are separate addresses; operator identity is Aligned in both cases but building-level mapping is unconfirmed
  • Community Impact · CORROBORATED
    Limitation: The retail utility name (Oncor as wires provider / ERCOT as grid operator) was not stated on any page fetched, so it is left unnamed here
  • TCEQ (Texas Commission on Environmental Quality) · VERIFIED PRIMARY
    Limitation: County/city not stated on the report; page timed out on first fetch and required a retry. No MW or generator count on the report.
  • City of Round Rock; City of Fort Worth · VERIFIED PRIMARY
    Limitation: Absence confirmed only for these two cases; Bexar, Hill, Collin, Armstrong case files were not obtained. (confidence detail: VERIFIED_PRIMARY (absence in fetched records))
  • TCEQ; Community Impact · DISCOVERY LEAD
    Limitation: Sources seen via search result content; Plano council minutes not fetched. Collin County abatement records not searched successfully.

Open TX state research →