Aligned Data Centers Project Caprock (LBB-01 and follow-on facilities)

This record consolidates 11 research observations while retaining source distinctions, location precision and unresolved fields.

under_constructionproject status
VERIFIED_PRIMARYbest evidence tier
11linked evidence rows
Project facts

Location and operating record

Operator / developerAligned Data Centers
JurisdictionJust outside Abernathy, TX
AddressCounty Rd 315 & Hi-Line Rd (per directory)
Location precisionparcel or bounded site
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesAligned Data Centers Project Caprock (LBB-01 and follow-on facilities) · Project Caprock · LBB-01 · Aligned Caprock campus · Aligned Lubbock-region campus
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure1 rows
SOURCE RECORD

Aligned Data Centers Project Caprock (LBB-01 and follow-on facilities): source record

under_construction

General contractor is Ryan Companies. Utility is Xcel/SPS, placing the campus in SPP rather than ERCOT despite the Lubbock-region naming (LBB-01).

Key data: Xcel Energy (Southwestern Public Service Company, Texas-New Mexico) | SPP (SPS/Xcel territory) - NOT ERCOT | None for cooling | NOT_FOUND (unincorporated Hale County)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Aligned Data Centers Project Caprock (LBB-01 and follow-on facilities): ownership and profile

under_construction

Developer: Aligned Data Centers | Owner: Aligned Data Centers | County: Hale | Research region: Amarillo-Panhandle / Lubbock-South Plains / El Paso-Far West | Tenants/customers: NOT_FOUND (campus described as anchoring $5 billion in investments)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Aligned Data Centers Project Caprock (LBB-01 and follow-on facilities): power and grid

under_construction

Key data: Utility: Xcel Energy (Southwestern Public Service Company, Texas-New Mexico) | Utility region: Xcel Energy Texas-New Mexico / SPS | Grid area: SPP (SPS/Xcel territory) - NOT ERCOT | Substations: Aligned states it is building and funding dedicated electrical infrastructure to protect existing ratepayers | Transmission: Nearest high-voltage line approximately 0.9 miles at 230 kV (per Compute Atlas site profile)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Aligned Data Centers Project Caprock (LBB-01 and follow-on facilities): water and cooling

under_construction

Key data: Water utility: None for cooling | Water source: No Ogallala Aquifer water used for cooling; regional baseline water stress rated Extremely High | Water demand: Closed-loop cooling with air-cooled heat rejection; no water used for cooling | Cooling: Aligned DeltaFlow liquid cooling, closed loop with air-cooled heat rejection

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Aligned Data Centers Project Caprock (LBB-01 and follow-on facilities): permits and jurisdiction

under_construction

Key data: Zoning case: NOT_FOUND (unincorporated Hale County) | Permit IDs: NOT_FOUND | Jurisdictions: Hale County | Abernathy ISD (unverified) | Xcel Energy / SPS

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

CIVIC AND COMMUNITY

Aligned Data Centers Project Caprock (LBB-01 and follow-on facilities): civic and community

under_construction

Aligned states it builds and funds dedicated electrical infrastructure so existing ratepayers are not burdened

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

Aligned Data Centers Project Caprock (LBB-01 and follow-on facilities): environment and site

under_construction

Closed-loop liquid cooling avoids Ogallala Aquifer withdrawals in an area of Extremely High baseline water stress

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

under_construction

Key data: Surrounding infrastructure: Nearest 230 kV line ~0.9 miles

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

under_construction

Key data: Surrounding infrastructure: General contractor Ryan Companies

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Aligned Data Centers Project Caprock (LBB-01 and follow-on facilities): timeline

under_construction

Aligned breaks ground on Project Caprock

Claim classification: Not yet assigned

Status date: 2026-04-09

Open source 1 →

under_construction

LBB-01 targeted service date

Claim classification: Not yet assigned

Status date: 2027-Q1

Open source 1 →