Project facts

Location and operating record

Operator / developerAlteri Energy
JurisdictionMonahans, TX
AddressNot published
Location precisionlocality centroid
Coordinates31.655721, -103.083694
Capacity22 MW
AliasesAlteri Energy Monahans Facilities (Mono 1 and Goldsmith) · Mono 1 / Goldsmith · Alteri Mono 1 · Alteri Goldsmith
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

Alteri Energy Monahans Facilities (Mono 1 and Goldsmith): source record

operational

Company-source only (Tier-3 self-reported). Alteri's operations page confusingly lists a facility called 'Goldsmith' as located in Monahans while a separate 21.2 MW facility named 'Xion' is listed at Goldsmith (Ector County). Gross MW here sums Mono 1 (12 MW) + Goldsmith (10 MW). Crypto mining, not yet AI/HPC.

Key data: ERCOT grid | ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Alteri Energy Monahans Facilities (Mono 1 and Goldsmith): ownership and profile

operational

Developer: Alteri Energy | Owner: Alteri Energy | County: Ward (Monahans); Goldsmith facility is in Ector County | Research region: Abilene-West Central Texas / Midland-Odessa-Permian Basin | Tenants/customers: Retail and institutional digital-asset mining clients (Mining-as-a-Service)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Alteri Energy Monahans Facilities (Mono 1 and Goldsmith): power and grid

operational

Key data: Utility: ERCOT grid | Utility region: ERCOT West | Grid area: ERCOT | Gross MW: 22

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Alteri Energy Monahans Facilities (Mono 1 and Goldsmith): water and cooling

operational

Key data: Cooling: Air-cooled (modular containers rated for extreme West Texas heat)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Alteri Energy Monahans Facilities (Mono 1 and Goldsmith): permits and jurisdiction

operational

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

Alteri Energy Monahans Facilities (Mono 1 and Goldsmith): environment and site

operational

Mono 1 reported at 55% renewable energy mix

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Alteri Energy Monahans Facilities (Mono 1 and Goldsmith): timeline

operational

Company operations page lists Mono 1 (12 MW, air-cooled, 55% renewables) and Goldsmith (10 MW, air-cooled, ERCOT grid) at Monahans

Claim classification: Not yet assigned

Open source 1 →

CAPACITY GROSS POWER

Alteri Energy Monahans Facilities (Mono 1 and Goldsmith): capacity gross power

operational

Alteri lists two Monahans facilities: Mono 1 at 12 MW air-cooled on a 55% renewable mix, and Goldsmith at 10 MW fully air-cooled on the ERCOT grid, both described as being just west of Odessa in the Permian Basin.

Key data: Mono 1 12 MW; Goldsmith 10 MW; both air-cooled, ERCOT

Claim classification: COMPANY_CLAIM · Verification: VERIFIED · Retrieved: 2026-09-05

Limitation: Company page confusingly assigns a facility named 'Goldsmith' to Monahans while listing a separate facility at Goldsmith.

Open source 1 →

Sources

Evidence and provenance

Open TX state research →