operational
Company-source only (Tier-3 self-reported). Alteri's operations page confusingly lists a facility called 'Goldsmith' as located in Monahans while a separate 21.2 MW facility named 'Xion' is listed at Goldsmith (Ector County). Gross MW here sums Mono 1 (12 MW) + Goldsmith (10 MW). Crypto mining, not yet AI/HPC.
Key data: ERCOT grid | ERCOT
Claim classification: Not yet assigned
Status date: 2026-09-05