operational
Company-source only. Crypto mining site in Ector County; inaugural Auradine ASIC fleet.
Key data: ERCOT grid | ERCOT
Claim classification: Not yet assigned
Status date: 2026-09-05
This record consolidates 7 research observations while retaining source distinctions, location precision and unresolved fields.
| Operator / developer | Alteri Energy |
|---|---|
| Jurisdiction | Goldsmith, TX |
| Address | Not published |
| Location precision | locality centroid |
| Coordinates | 31.983325, -102.616381 |
| Capacity | 21.2 MW |
| Aliases | Alteri Energy Xion (Goldsmith) · Xion |
| Project profile | 0 rows |
|---|---|
| Intent / permits | 0 rows |
| Civic / infrastructure | 0 rows |
Company-source only. Crypto mining site in Ector County; inaugural Auradine ASIC fleet.
Key data: ERCOT grid | ERCOT
Claim classification: Not yet assigned
Status date: 2026-09-05
Developer: Alteri Energy | Owner: Alteri Energy | County: Ector | Research region: Abilene-West Central Texas / Midland-Odessa-Permian Basin
Claim classification: Not yet assigned
Status date: 2026-09-05
Key data: Utility: ERCOT grid | Utility region: ERCOT West | Grid area: ERCOT | Gross MW: 21.2
Claim classification: Not yet assigned
Status date: 2026-09-05
Key data: Cooling: Air-cooled
Claim classification: Not yet assigned
Status date: 2026-09-05
Claim classification: Not yet assigned
Status date: 2026-09-05
Company operations page lists Xion at 21.2 MW, air-cooled, 48% renewables, hosting Bitcoin and Litecoin/Dogecoin ASICs
Claim classification: Not yet assigned
Alteri's operations page lists Xion at 21.2 MW, air-cooled, on a 48% renewable mix at Goldsmith, running Bitcoin and Litecoin/Dogecoin ASICs.
Key data: 21.2 MW; air-cooled; 48% renewables
Claim classification: COMPANY_CLAIM · Verification: VERIFIED · Retrieved: 2026-09-05
Limitation: Company self-reported; no permit or appraisal record reviewed.