operational
Company-source only. Crypto mining site in Ector County; inaugural Auradine ASIC fleet.
Key data: ERCOT grid | ERCOT
Claim classification: Not yet assigned
Status date: 2026-09-05
This record consolidates 3 research observations while retaining source distinctions, location precision and unresolved fields.
| Operator / developer | Alteri Energy |
|---|---|
| Jurisdiction | Goldsmith, TX |
| Address | Not published |
| Location precision | locality centroid |
| Coordinates | 31.983325, -102.616381 |
| Capacity | 21.2 MW |
| Aliases | Alteri Energy Xion (Goldsmith) · Xion |
| Project profile | 0 rows |
|---|---|
| Intent / permits | 0 rows |
| Civic / infrastructure | 0 rows |
Company-source only. Crypto mining site in Ector County; inaugural Auradine ASIC fleet.
Key data: ERCOT grid | ERCOT
Claim classification: Not yet assigned
Status date: 2026-09-05