Agreements in place
Spotsylvania holds three water-reuse service agreements for data-center cooling: Cosner Tech Campus up to **1,260 gpm ≈ 1.8 MGD**; the Mattameade Amazon complex max **1,980 gpm ≈ 2.8 MGD** once the reuse system is built; Powerhouse 95 max **700,000 gal/d**. An Amazon annotation says maximum draw would be needed only ~4.1% of the year, but the agreements contain no clause limiting use to that share or requiring air-cooling priority; ~60% of cooling water is lost to evaporation.
Key data: Cosner (IAD450): 1,260 gpm ≈ 1.8 MGD; Mattameade: 1,980 gpm ≈ 2.8 MGD; Powerhouse 95: 700,000 gal/d
Claim classification: Not yet assigned · Retrieved: 2026-08-29
Status date: 2026
Limitation: Attribution of the Cosner agreement to permit-named "IAD450" rests on the shared "Cosner Tech Campus" name; DEQ's issued-permit list shows IAD450 Cosner Tech Campus permit 74288-2 issued 06/01/2026.