Amazon Project Green New Florence Data Center Campus

This record consolidates 20 research observations while retaining source distinctions, location precision and unresolved fields.

approved_or_permittedproject status
CORROBORATEDbest evidence tier
20linked evidence rows
Project facts

Location and operating record

Operator / developerAmazon Web Services
JurisdictionNew Florence, MO
AddressNorth of Interstate 70 just east of New Florence (Hudson Rd and Ellis Rd)
Location precisionparcel or bounded site
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesAmazon Project Green New Florence Data Center Campus · Project Green · AWS New Florence campus
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure7 rows
SOURCE RECORD

Amazon Project Green New Florence Data Center Campus: source record

approved

Investment conflict: $10 billion (June 2026 announcement) vs an earlier '$8.5 billion minimum' figure (missouridatacenters.org). Building conflict: up to 17 buildings (missouridatacenters.org) vs an initial 8 buildings plus expansion (datacentermap). Jobs conflict: 400 permanent/direct jobs plus thousands of trade jobs (June 2026 reporting) vs approximately 150 jobs at $85,000 average in the December 2025 abatement framework. servercountry.org lists 1,300 MW; no MW figure appears in the primary announcements, so none is asserted.

Key data: Ameren Missouri | MISO (Ameren Missouri / AMMO)

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

OWNERSHIP AND PROFILE

Amazon Project Green New Florence Data Center Campus: ownership and profile

approved

Developer: Amazon Web Services | Owner: Amazon Web Services | County: Montgomery | Research region: East-central Missouri / I-70 corridor

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

POWER AND GRID

Amazon Project Green New Florence Data Center Campus: power and grid

approved

Key data: Utility: Ameren Missouri | Grid area: MISO (Ameren Missouri / AMMO)

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

WATER AND COOLING

Amazon Project Green New Florence Data Center Campus: water and cooling

approved

Key data: Cooling: Water used for cooling roughly 7% of the time; AWS expects to conserve 100 million gallons

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

SOURCE_BACKED

AWS reports the Montgomery County campus would use water for cooling roughly 7% of the time and expects to conserve 100 million gallons, alongside a farm irrigation partnership with Arable Labs and community commitments including $3M for emergency dispatch, $1M for a fairgrounds pavilion, $3M in community initiatives, a $150,000 county community fund and $50,000 for educators.

Key data: Water cooling ~7% of the time; 100M gallons conserved

Claim classification: official_estimate_or_forecast · Verification: source_backed_unverified · Retrieved: 2026-09-13

Limitation: Company projections, not measured consumption.

Open source 1

PERMITS AND JURISDICTION

Amazon Project Green New Florence Data Center Campus: permits and jurisdiction

approved

Key data: Jurisdictions: Montgomery County | Missouri | Tax incentives: Montgomery County Commission unanimously approved an AWS tax abatement framework on 2025-12-18

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

CIVIC AND COMMUNITY

Amazon Project Green New Florence Data Center Campus: civic and community

approved

$3 million for emergency dispatch

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

approved

$1 million fairgrounds pavilion

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

approved

$3 million in community initiatives

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

approved

$150,000 county community fund

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

approved

$50,000 for educators

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

approved

Residents and property owners filed a lawsuit in February 2026 seeking to halt the project

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

approved

Open house held 2026-06-23

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

ENVIRONMENT AND SITE

Amazon Project Green New Florence Data Center Campus: environment and site

approved

Partnership with Arable Labs on farm irrigation

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

approved

AWS states it pays 100% of its electricity costs with no rate incentives or discounts

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

TIMELINE

Amazon Project Green New Florence Data Center Campus: timeline

approved

Montgomery County Commission unanimously approved the AWS tax abatement framework

Claim classification: Not yet assigned

Status date: 2025-12-18

Open source 1

approved

Residents and property owners filed a lawsuit to halt the project

Claim classification: Not yet assigned

Status date: 2026-02

Open source 1

approved

Amazon announced a $10 billion data center in eastern Missouri

Claim classification: Not yet assigned

Status date: 2026-06-15

Open source 1

approved

Tentative completion

Claim classification: Not yet assigned

Status date: 2032

Open source 1

ECONOMIC AND TAX

Amazon Project Green New Florence Data Center Campus: economic and tax

approved

Amazon announced a $10 billion data center in Montgomery County on 2026-06-15 with 400 permanent jobs plus thousands of trade jobs and tentative completion in 2032; AWS states it pays 100% of its electricity costs with no rate incentives or discounts.

Key data: $10B; 400 permanent jobs; completion 2032

Claim classification: proposal_or_announced_commitment · Verification: conflicting_sources_preserved · Retrieved: 2026-09-13

Status date: 2026-06-15

Limitation: Conflicts with an earlier '$8.5 billion minimum' figure and with a December 2025 abatement framework citing ~150 jobs at $85,000 average.

Open source 1

Sources

Evidence and provenance

Open MO state research →

Amazon Project Green New Florence Data Center Campus Data Center Project | New Florence | Compute Equity Atlas