Compute Equity Atlas
← National map
Missouri / MO

Missouri data center and compute infrastructure research

This state has reviewed research coverage from the national 50-state Atlas. Exact project locations are published only after source evidence establishes coordinates; state-level, regulatory, utility and prospective evidence remains visible without inventing map precision.

5reviewed research rows
0confirmed rows
3accepted prospective rows
Animated state view

Missouri

True aspect · centered · uncropped
State research coverage

Missouri is part of the 50-state research coverage.

The current reviewed research set contains 5 accepted evidence records for Missouri, including 0 confirmed and 3 accepted prospective rows, with a research cutoff of 2026-08-20. These are evidence records, not a count of unique facilities.

Prospective records remain labeled as proposals, applications, forecasts, targets, queue entries or other non-operational states. The Atlas does not convert state-level or locality evidence into a precise project point unless a controlling source supports that location.

See the evidence and publication methodology →

Evidence-backed project locations

Missouri project points

Source-exact records use supported coordinates. Dashed rings mark Census address-range geocodes, not rooftop or surveyed coordinates. Qualified research candidates are shown separately at Census locality or county centroids when that is the strongest source-backed geography; those markers do not claim a precise site coordinate.

1 mapped location
Google New Florence Data CenterNew FlorenceResearch candidate · locality centroid · exact site coordinate not claimed · announcedGoogle announced a new data center in New Florence / Montgomery County as part of a major Missouri infrastructure investment.verified state plus first partyOpen source →
Documented project / site inventory

65 project, facility, campus or documented site records are tracked for MO.

This project layer combines available project-profile, permit/intent and civic-impact evidence. Records retain unresolved location precision and limitations rather than inventing coordinates.

operational street address

AAIM Missouri 1

Mexico · MO

Operator / developer: AAIM Data Centers

Address: Within a former clay brick plant (no street address published)

5 linked evidence rows · coordinate not inferred

Open project evidence record →
approved or permitted parcel or bounded site

Armory Innovation District Data Center

St. Louis · MO

Operator / developer: Joint venture of Contour, TeraWatt Infrastructure and THO Investments (THO / Third Home Office)

Documented capacity: 120 MW

Address: Former Famous-Barr / Macy's warehouse on Market Street, adjacent to The Armory (Midtown)

22 linked evidence rows · coordinate not inferred

Open project evidence record →
approved or permitted parcel or bounded site

CRG Festus Data Center

Festus · MO

Operator / developer: CRG (a Clayco company)

Address: North of Highway 67 and west of Highway CC (Old England Rd and US-67)

15 linked evidence rows · coordinate not inferred

Open project evidence record →
approved or permitted street address

Crusoe Warrenton Campus

Warrenton · MO

Operator / developer: Crusoe Energy Systems / Crusoe Inc.

Address: 22151 NW Service Road (north of the Warrenton West interchange)

13 linked evidence rows · coordinate not inferred

Open project evidence record →
operational street address

Edged Kansas City

Kansas City · MO

Operator / developer: Edged (an Endeavour company)

Documented capacity: 26 MW

Address: 3420 N Arlington Ave

8 linked evidence rows · coordinate not inferred

Open project evidence record →
proposed or review parcel or bounded site

Gateway Digital Campus

Villa Ridge · MO

Operator / developer: Provident Data Centers

Address: Robertsville Road, along Interstate 44 (8,000 ft of I-44 frontage; 1,200 ft of Old Highway 66 frontage)

11 linked evidence rows · coordinate not inferred

Open project evidence record →
proposed or review parcel or bounded site

Google Project Kestrel Campus

Kansas City · MO

Operator / developer: Google (reported; not confirmed by Google)

Address: Southwest corner of Missouri Highway 92 and N. Winan Ave (north of Kansas City International Airport)

11 linked evidence rows · coordinate not inferred

Open project evidence record →
unknown parcel or bounded site

Harper Road Technology Park

Peculiar · MO

Operator / developer: Diode Ventures (a Black & Veatch company)

Address: West side of Harper Road, between 203rd Street and future 211th Street

13 linked evidence rows · coordinate not inferred

Open project evidence record →
proposed or review parcel or bounded site

Jasper County Powered Data Park

La Russell (unincorporated eastern Jasper County, near Sarcoxie) · MO

Operator / developer: Geronimo Power (Bloomington, Minnesota)

Address: Land west of Missouri Highway 96, south of the La Russell Energy Center, near Fir Road

17 linked evidence rows · coordinate not inferred

Open project evidence record →
under construction parcel or bounded site

Nebius Independence AI Factory

Independence · MO

Operator / developer: Nebius

Documented capacity: 1200 MW

Address: Near Missouri Route 78 and Little Blue Parkway (Eastgate Commerce Center / Little Blue Valley)

22 linked evidence rows · coordinate not inferred

Open project evidence record →
unknown parcel or bounded site

Project Cumulus

St. Charles · MO

Operator / developer: CRG (applicant CRG Cumulus LLC, sharing an address with Clayco)

Address: North and south sides of Highway 370 between Huster Road and Harry S Truman Boulevard

18 linked evidence rows · coordinate not inferred

Open project evidence record →
proposed or review locality centroid

White Cloud Acres

Maryville (southern Nodaway County) · MO

Operator / developer: ReLoad (Chicago), acquired by Scale Microgrids (New Jersey) in February 2026

19 linked evidence rows · locality centroid; exact site unresolved

Open project evidence record →
Public records and supporting context

Development context

These dated decisions, filings, research collections and supporting-infrastructure records provide context. They are not additional data-center facilities.

Public agency starting point

City of Columbia Community Development

Columbia, Boone County, Missouri

Contact about: Could you identify the public planning case archive, adopted plan documents and infrastructure-related staff materials?

planning@como.gov

Source status: historical org page evidence. Verify the linked public source before relying on an assignment because staff and routing can change.

Verify public contact source ↗

MO data-center research sources

This record is a regional research collection or market overview. It is not an individual data-center facility.

Read reference context →
State completion checkpoint · 2026-10-06

Missouri research pass: complete verified

This state completion snapshot summarizes source-backed research. It does not add map points, alter canonical facility counts, turn provider presence into another physical building, import licensed operator labels into verified records without current source support, or convert future/project power into operating IT load.

9strict operating physical facilities / campuses
9active buildout / proposed projects
18licensed discovery rows preserved separately
0completion-queue items unresolved
Current active pipeline
Conditional-use permit approved

Armory Innovation District Data Center

St. Louis

Operator / developer: Contour / project partners

Scope: Licensed 120 MW remains discovery-layer context unless current city source scope is established.

Open source 1 →

Announced active development

Google New Florence Data Center

New Florence / Montgomery County

Operator / developer: Google

Scope: Google describes more than 500 MW additional capacity supported through its Missouri framework; not data-center IT load.

Open source 1 →

Open source 2 →

Planned

Amazon Montgomery County Data Center Campus

Montgomery City / Montgomery County

Operator / developer: Amazon

Scope: $10 billion planned investment; no unsupported MW scalar promoted.

Open source 1 →

Approved active development

Metrobloks Liberty Campus

Liberty, Clay County

Operator / developer: Metrobloks

Published / planned capacity: 150 MW

Scope: Projected completed-campus electricity use from City FAQ; not current operating IT load.

Open source 1 →

Under construction

Nebius Independence AI Factory

Independence, Jackson County

Operator / developer: Nebius

Published / planned capacity: 1,200 MW

Scope: Potential ultimate capacity; company describes 800 MW expandable to 1.2 GW.

Open source 1 →

Authorized active development

Project Mica

Kansas City Northland

Operator / developer: Undisclosed in current Port KC source

Published / planned capacity: 700 MW

Scope: Nearly 700 MW full-development draw published by Port KC; not current operating IT load.

Open source 1 →

Active development

Crusoe Warrenton Data Center

Warrenton, Warren County

Operator / developer: Crusoe

Scope: No unsupported MW scalar promoted.

Open source 1 →

Under construction

Rifle Range Road Data Center Project

Rural Webster County near Marshfield

Operator / developer: Developer not publicly named by county source

Scope: No independently supported power scalar published by county.

Open source 1 →

City Council review held

934 Central Data Center Development

Kansas City, Jackson County

Operator / developer: Developer per Kansas City case file

Scope: No MW scalar promoted.

Open source 1 →

Operating-source reconciliation and publication controls

Strict operating source coverage

  • Meta: 1 strict physical record
  • Netrality Data Centers: 3 strict physical records
  • Iron Mountain Data Centers: 1 strict physical record
  • TierPoint: 3 strict physical records
  • Patmos: 1 strict physical record

Controls retained

  • Netrality 900 Walnut is counted once as a physical building; 365 Data Centers remains provider-presence context.
  • LightEdge's current 3 MW Kansas City, Missouri facility remains qualified until exact public building identity is reconciled.
  • The current Amazon Montgomery City/Montgomery County campus is not automatically collapsed into the licensed New Florence Project Green row.
  • Project Mica keeps the operator undisclosed because the current Port KC page does not name it; the licensed Google label is not imported.
  • All 18 licensed discovery rows remain separate from strict canonical counts.
  • Future/project power values remain source-scoped and are never described as current operating IT load.
Current policy and regulatory context (9)
State contact routing

Where to start in Missouri

Current source-backed route

Center for Applied Research and Engagement Systems

Contact about: Applied data, local context and evidence-limited civic research.

This route was retained from current or recently revalidated public-source evidence.

Open public contact source →

Who to contact

Public contacts for data center and compute issues in Missouri

1 source-backed contact records are available for planning, zoning, permitting, public comments, economic development, project questions and related infrastructure issues. Verify the linked source before relying on a contact because assignments can change.

PUBLIC CONTACT

Elizabeth Dorssom

MACED Program Coordinator · Lincoln University of Missouri

Relevant to: HBCU and place-based anchor institution · Jefferson City / Local, regional, national, and international community-development contexts; the institution is based…

Ask how MACED faculty and students teach residents and civic practitioners to interpret quantitative and qualitative evidence, evaluate public policies, and participate ethically in community-development decisions; offer a brief exchange on source-backed…

Contact details: Elizabeth Dorssom; MACED Program Coordinator; Lincoln University of Missouri; DorssomE@LincolnU.edu

DorssomE@LincolnU.edu

Limitation: Do not claim Lincoln has a data-center, broadband, or digital-infrastructure project; do not imply an existing partnership, faculty interest, student participation, institutional…

Verify contact source →

Return to the national activity map →

Missouri Data Centers, Projects & Compute Infrastructure Research | Compute Equity Atlas