under construction
Reported at 700 MW by Port KC-derived reporting (missouridatacenters.org, servercountry.org); Google has not published a load figure, so no MW field is asserted. Five buildings / 1.56M sq ft per Port KC filings. Rocky Branch Creek Technology Park phase one described as 208,000 sq ft plus an Evergy substation, with long-term build-out of 1.8M sq ft over six phases - conflicting with the 1.56M sq ft five-building figure. QTS was an earlier prospective customer that withdrew over power timelines.
Key data: Evergy | SPP (Evergy Metro)
Claim classification: Not yet assigned
Status date: 2026-09-13