Crusoe Warrenton Campus

This record consolidates 13 research observations while retaining source distinctions, location precision and unresolved fields.

approved_or_permittedproject status
CORROBORATEDbest evidence tier
13linked evidence rows
Project facts

Location and operating record

Operator / developerCrusoe Energy Systems / Crusoe Inc.
JurisdictionWarrenton, MO
Address22151 NW Service Road (north of the Warrenton West interchange)
Location precisionstreet address
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesCrusoe Warrenton Campus · Warrenton data center campus
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

Crusoe Warrenton Campus: source record

approved

Two data center buildings of 805,000 sq ft (also stated as 800,000) plus a 40,000 sq ft administration building, roughly 1.65M sq ft total, on about 337-340 acres. MW capacity has NOT been disclosed; third-party estimates range from roughly 330 to 675 MW and servercountry.org lists a $25.5 billion figure that appears to reflect bond/equipment values rather than announced investment. Initial equipment cost reported at about $8.366 billion with roughly $8.25 billion replacement every six years. Chapter 100 documents prepared by Gilmore & Bell (Mark Grimm); Crusoe representative Conor Bates. Still requires land disturbance review and further permits. Crusoe's partners include Stargate LLC, OpenAI and Oracle, but no source confirms which customers this campus will serve. The Missouri PSC approval of Ameren's large-load rate plan was reported locally as applying to the proposed Warren County data centers.

Key data: Ameren Missouri | MISO (Ameren Missouri / AMMO)

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

OWNERSHIP AND PROFILE

Crusoe Warrenton Campus: ownership and profile

approved

Developer: Crusoe | Property entity: Warrenton DC Owner 1 LLC (listed sponsor entity) | County: Warren | Research region: East-central Missouri / I-70 corridor

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

CORROBORATED

Crusoe was named as the developer of the Warrenton data center project west of St. Louis.

Key data: Crusoe named as developer

Claim classification: documented_fact · Verification: source_backed_unverified · Retrieved: 2026-09-13

Limitation: Tenant/customer identity not disclosed.

Open source 1

POWER AND GRID

Crusoe Warrenton Campus: power and grid

approved

Key data: Utility: Ameren Missouri | Grid area: MISO (Ameren Missouri / AMMO)

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

WATER AND COOLING

Crusoe Warrenton Campus: water and cooling

approved

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

PERMITS AND JURISDICTION

Crusoe Warrenton Campus: permits and jurisdiction

approved

Key data: Jurisdictions: Warrenton | Warren County | Missouri | Tax incentives: Chapter 100 plan with a 75% personal property tax abatement, approved 4-2 in April 2026 | Chapter 100 bonds of $85 billion

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

approved

The Warrenton Board of Aldermen approved the conditional use permit and site plan for the data center 6-0 on 2026-01-20; the campus comprises two data center buildings of about 805,000 sq ft each plus a 40,000 sq ft administration building at 22151 NW Service Road.

Key data: CUP and site plan approved 6-0 on 2026-01-20

Claim classification: documented_fact · Verification: source_backed_unverified · Retrieved: 2026-09-13

Status date: 2026-01-20

Limitation: Land disturbance review and further permits still required.

Open source 1

ENVIRONMENT AND SITE

Crusoe Warrenton Campus: environment and site

approved

Environmental studies performed by Kimley-Horn were kept confidential

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

TIMELINE

Crusoe Warrenton Campus: timeline

approved

Warrenton Board of Aldermen approved the conditional use permit and site plan 6-0

Claim classification: Not yet assigned

Status date: 2026-01-20

Open source 1

approved

Chapter 100 plan with 75% personal property tax abatement approved 4-2

Claim classification: Not yet assigned

Status date: 2026-04

Open source 1

approved

Equipment installation planned for spring 2027; Phase 1 (one building plus admin) targeted for 2027

Claim classification: Not yet assigned

Status date: 2027

Open source 1

approved

Phase 2 targeted

Claim classification: Not yet assigned

Status date: 2028

Open source 1

ECONOMIC AND TAX

Crusoe Warrenton Campus: economic and tax

approved

Warrenton aldermen approved a Chapter 100 plan with a 75% personal property tax abatement for the Crusoe data center by a 4-2 vote, with $85 billion in bonds, initial equipment cost of about $8.366 billion and roughly $8.25 billion in replacement equipment every six years; documents were prepared by Gilmore & Bell (Mark Grimm) and Crusoe was represented by Conor Bates.

Key data: 75% personal property abatement, 4-2 vote; $85B bonds

Claim classification: documented_fact · Verification: source_backed_unverified · Retrieved: 2026-09-13

Status date: 2026-04

Limitation: The $85B bond figure is an authorization ceiling. MW capacity was not disclosed.

Open source 1

Sources

Evidence and provenance

Open MO state research →