This record consolidates 22 research observations while retaining source distinctions, location precision and unresolved fields.

under_constructionproject status
CORROBORATEDbest evidence tier
22linked evidence rows
Project facts

Location and operating record

Operator / developerNebius
JurisdictionIndependence, MO
AddressNear Missouri Route 78 and Little Blue Parkway (Eastgate Commerce Center / Little Blue Valley)
Location precisionparcel or bounded site
CoordinatesNot published; no coordinate inferred
Capacity1200 MW
AliasesNebius Independence AI Factory · Nebius Independence Campus · Nebius Independence Data Center Campus · Nebius AI Factory Independence
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure5 rows
SOURCE RECORD

Nebius Independence AI Factory: source record

under construction

Nebius' own page states up to 1.2 GW total = 800 MW from IPL plus 400 MW on-site generation, and FOUR buildings; earlier local reporting and trackers describe 8-10 buildings, 2.1-2.5M sq ft and 800 MW scalable to ~1.1 GW - conflict preserved. Phase 1 general contractor ARCO Construction. On-site generation to be developed by Independence Power Partners LP at the City of Independence's retired Blue Valley Power Plant site, privately financed, phased from 250 MW in late 2027. Energy from IPL is fed to the SPP grid and Nebius buys at market rates, paying full cost of power and infrastructure upgrades. Litigation plaintiffs: Rachel Gonzalez, Kharma Magers, Misty Vaughn; City Clerk Susanne Holland refused the referendum petition.

Key data: Independence Power & Light (IPL) | Southwest Power Pool (SPP)

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

OWNERSHIP AND PROFILE

Nebius Independence AI Factory: ownership and profile

under construction

Developer: Nebius | Owner: Nebius | County: Jackson | Research region: Kansas City metro east

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

POWER AND GRID

Nebius Independence AI Factory: power and grid

under construction

Key data: Utility: Independence Power & Light (IPL) | Grid area: Southwest Power Pool (SPP) | Gross MW: 1200 | Requested load MW: 800 | Onsite generation MW: 400

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

under construction

Nebius states the Independence campus will reach up to 1.2 GW comprising 800 MW from Independence Power & Light and 400 MW of on-site generation, with IPL participating in the Southwest Power Pool, initial IPL power in the second half of 2026, an IPL study for additional power by early 2029, and Nebius paying the full cost of power and infrastructure upgrades.

Key data: 1.2 GW total: 800 MW IPL + 400 MW on-site

Claim classification: proposal_or_announced_commitment · Verification: verified_by_primary_source · Retrieved: 2026-09-13

Status date: 2026

Limitation: Company self-report; the 400 MW on-site facility is not yet built or permitted in evidence fetched here.

Open source 1

WATER AND COOLING

Nebius Independence AI Factory: water and cooling

under construction

Key data: Cooling: Closed-loop water cooling

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

SOURCE_BACKED

The campus is described as using closed-loop water cooling, with on-site generation to be developed by Independence Power Partners LP at the City of Independence's retired Blue Valley Power Plant site, privately financed and phased from 250 MW in late 2027.

Key data: Closed-loop water cooling; 250 MW first generation phase late 2027

Claim classification: official_estimate_or_forecast · Verification: conflicting_sources_preserved · Retrieved: 2026-09-13

Limitation: Secondary market-research compilation; Nebius' own page describes on-site generation as still under evaluation for a future phase, which conflicts with a fixed 2027 phase-in date.

Open source 1

PERMITS AND JURISDICTION

Nebius Independence AI Factory: permits and jurisdiction

under construction

Key data: Jurisdictions: Independence | Jackson County | Missouri | Tax incentives: $150.6 billion in Taxable Industrial Development Revenue Bonds (Chapter 100) | Approximately $6.6 billion in total tax breaks reported | PILOT of $651 million over the first 20 years (more than $30M/yr)

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

approved

The Independence City Council approved the project 5-2 on 2026-03-02 and issued $150.6 billion in Taxable Industrial Development Revenue Bonds; reported tax breaks total about $6.6 billion with a PILOT of $651 million over the first 20 years.

Key data: $150.6B in Chapter 100 bonds; 5-2 council vote

Claim classification: documented_fact · Verification: source_backed_unverified · Retrieved: 2026-09-13

Status date: 2026-03-02

Limitation: The $150.6B bond figure is a conduit authorization ceiling, not project investment.

Open source 1

CIVIC AND COMMUNITY

Nebius Independence AI Factory: civic and community

under construction

More than $500 million for the Independence and Fort Osage school districts over 20 years

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

under construction

City of Independence estimates as much as $55 million per year to the general fund and a similar amount to IPL

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

under construction

More than 1,000 skilled construction jobs, more than 99% union labor

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

under construction

Residents' referendum petition refused by the City Clerk; Jackson County judge ruled for the city on 2026-03-25

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

approved

A residents' referendum petition was refused by City Clerk Susanne Holland and Jackson County Judge Jennifer Phillips ruled for the city on 2026-03-25, meaning the project would not go to a public vote; plaintiffs were Rachel Gonzalez, Kharma Magers and Misty Vaughn.

Key data: Court ruled 2026-03-25 that the project will not go to a vote

Claim classification: verified_outcome · Verification: source_backed_unverified · Retrieved: 2026-09-13

Status date: 2026-03-25

Limitation: Trial court ruling; appellate outcome not researched.

Open source 1

ENVIRONMENT AND SITE

Nebius Independence AI Factory: environment and site

under construction

Key data: Surrounding infrastructure: On-site electrical infrastructure

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

under construction

Key data: Surrounding infrastructure: Bly Road southern portion to be rerouted west to exit onto Little Blue Parkway

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

TIMELINE

Nebius Independence AI Factory: timeline

under construction

Nebius applied for incentives

Claim classification: Not yet assigned

Status date: 2025-11

Open source 1

under construction

Land purchased from NorthPoint Development

Claim classification: Not yet assigned

Status date: 2025-12

Open source 1

under construction

Independence City Council approved the project and bonds 5-2

Claim classification: Not yet assigned

Status date: 2026-03-02

Open source 1

under construction

Jackson County Judge Jennifer Phillips ruled in favor of the city; project will not go to a referendum vote

Claim classification: Not yet assigned

Status date: 2026-03-25

Open source 1

under construction

Initial IPL power delivery expected in the second half of 2026

Claim classification: Not yet assigned

Status date: 2026-H2

Open source 1

under construction

IPL study to provide additional power by early 2029

Claim classification: Not yet assigned

Status date: 2029

Open source 1

ECONOMIC AND TAX

Nebius Independence AI Factory: economic and tax

SOURCE_BACKED

The City of Independence estimates as much as $55 million per year to its general fund and a similar amount to Independence Power & Light, plus more than $500 million for the Independence and Fort Osage school districts over 20 years; the project expects more than 1,000 union construction jobs and about 130 permanent positions.

Key data: ~$55M/yr city general fund; >$500M to schools over 20 years

Claim classification: official_estimate_or_forecast · Verification: source_backed_unverified · Retrieved: 2026-09-13

Limitation: Forward-looking city and company estimates, not realized revenue.