Edged Kansas City

This record consolidates 8 research observations while retaining source distinctions, location precision and unresolved fields.

operationalproject status
CORROBORATEDbest evidence tier
8linked evidence rows
Project facts

Location and operating record

Operator / developerEdged (an Endeavour company)
JurisdictionKansas City, MO
Address3420 N Arlington Ave
Location precisionstreet address
CoordinatesNot published; no coordinate inferred
Capacity26 MW
AliasesEdged Kansas City
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

Edged Kansas City: source record

operational

Missouri DED and servercountry.org state 26 MW of critical capacity; datacentermap lists 18 MW and status 'Development'. Conflict preserved; 26 MW used as the it_load_mw value because it comes from the state agency press release.

Key data: Evergy | SPP (Evergy Metro)

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

OWNERSHIP AND PROFILE

Edged Kansas City: ownership and profile

operational

Developer: Edged Energy | County: Clay | Research region: Kansas City Northland

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

POWER AND GRID

Edged Kansas City: power and grid

operational

Key data: Utility: Evergy | Grid area: SPP (Evergy Metro) | IT load MW: 26

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

WATER AND COOLING

Edged Kansas City: water and cooling

operational

Key data: Cooling: ThermalWorks waterless cooling

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

operational

Missouri DED announced Edged opened a Kansas City data center with 26 MW of critical capacity and more than $143 million invested, using ThermalWorks waterless cooling and claiming 74% less energy overhead, with support from the Data Center Sales Tax Exemption.

Key data: 26 MW critical capacity; waterless cooling; >$143M

Claim classification: documented_fact · Verification: conflicting_sources_preserved · Retrieved: 2026-09-13

Status date: 2024-12

Limitation: Datacentermap lists 18 MW and 'Development' status for the same address, conflicting with the state's 26 MW operational figure.

Open source 1

PERMITS AND JURISDICTION

Edged Kansas City: permits and jurisdiction

operational

Key data: Jurisdictions: Kansas City | Clay County | Missouri | Tax incentives: Missouri Data Center Sales Tax Exemption Program

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

ENVIRONMENT AND SITE

Edged Kansas City: environment and site

operational

Waterless cooling; operator states 74% less energy overhead

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

TIMELINE

Edged Kansas City: timeline

operational

Facility opened with more than $143 million invested

Claim classification: Not yet assigned

Status date: 2024-12