under construction
Master technology-park record retained separately from the Meta facility record because the park spans two counties and three school districts and has its own incentive package. Diode Ventures states up to 750 MW design capacity for the park (park-level, not verified IT load). Possible overlap with TEMP-1 (Meta) is flagged, not resolved.
Key data: Evergy | SPP (Evergy Metro) | KC Water
Claim classification: Not yet assigned
Status date: 2026-09-13