operational
No MW figure published by Meta. Third-party tracker cleanview.co lists three 48 MW buildings; Diode Ventures states the surrounding technology park is designed for up to 750 MW, which is a park-level figure, not a verified Meta IT load. Building count reported as three (Buildings 1-3).
Key data: Evergy | SPP (Evergy Metro) | KC Water
Claim classification: Not yet assigned