Compute Equity Atlas
← National map
Source-backed project record · MO

Patmos AI Campus Kansas City

This record consolidates 8 research observations while retaining source distinctions, location precision and unresolved fields.

operationalproject status
CORROBORATEDbest evidence tier
8linked evidence rows
Project facts

Location and operating record

Operator / developerPatmos Hosting, Inc.
JurisdictionKansas City, MO
Address1601 McGee St
Location precisionstreet address
CoordinatesNot published; no coordinate inferred
Capacity35 MW
AliasesPatmos AI Campus Kansas City · Patmos Center (former Kansas City Star printing plant) · Patmos Kansas City
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

Patmos AI Campus Kansas City: source record

operational

Major capacity conflict: the November 2024 Patmos release describes a '100 MW' data center, datacentermap lists 100 MW / 400,000 sq ft, servercountry lists 100 MW, while a later Patmos release states 35 MW planned with 5 MW built and 7 MW added. Third-party tracker cleanview.co lists 40 MW. No MW asserted here. Includes roughly 150,000 sq ft of tech hub / coworking space. Square footage also reported as 400,000 (earlier release) vs 421,112.

Key data: Evergy | SPP (Evergy Metro)

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1 →

OWNERSHIP AND PROFILE

Patmos AI Campus Kansas City: ownership and profile

operational

Claim classification: Not yet assigned

Status date: 2026-09-15

Open source 1 →

CONFLICTING

Patmos announced on 2024-11-14 that it would convert the former Kansas City Star printing plant, a four-story 400,000 sq ft building on five acres, into a data center described as 100 MW, with roughly 150,000 sq ft of tech hub and coworking space and two unnamed publicly traded tenants.

Key data: Former Kansas City Star building; 100 MW as announced 2024

Claim classification: proposal_or_announced_commitment · Verification: conflicting_sources_preserved · Retrieved: 2026-09-13

Limitation: Superseded in part by later Patmos statements of 35 MW planned.

Open source 1 →

POWER AND GRID

Patmos AI Campus Kansas City: power and grid

operational

Key data: Gross MW: 35

Claim classification: Not yet assigned

Status date: 2026-09-15

Open source 1 →

operational

Patmos states the 1601 McGee St project has 35 MW planned, with 5 MW built in under 90 days and a further 7 MW added, and that it secured a $100 million C-PACE loan from PACE Loan Group via Show Me PACE, reported as the largest Missouri C-PACE loan.

Key data: 35 MW planned; 5 MW built plus 7 MW added; $100M C-PACE loan

Claim classification: documented_fact · Verification: conflicting_sources_preserved · Retrieved: 2026-09-13

Status date: 2026-09

Limitation: Directly conflicts with Patmos' own 2024 announcement of a '100 MW' data center and with datacentermap's 100 MW listing.

Open source 1 →

WATER AND COOLING

Patmos AI Campus Kansas City: water and cooling

operational

Claim classification: Not yet assigned

Status date: 2026-09-15

Open source 1 →

PERMITS AND JURISDICTION

Patmos AI Campus Kansas City: permits and jurisdiction

operational

Claim classification: Not yet assigned

Status date: 2026-09-15

Open source 1 →

Sources

Evidence and provenance

Open MO state research →

Patmos AI Campus Kansas City Data Center Project | Kansas City | Compute Equity Atlas