Compute Equity Atlas
← National map
Source-backed project record · MO

Patmos AI Campus Kansas City

This record consolidates 10 research observations while retaining source distinctions, location precision and unresolved fields.

operationalproject status
CORROBORATEDbest evidence tier
10linked evidence rows
Project facts

Location and operating record

Operator / developerPatmos Hosting, Inc.
JurisdictionKansas City, MO
Address1601 McGee St
Location precisionstreet address
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesPatmos AI Campus Kansas City · Patmos Center (former Kansas City Star printing plant) · Patmos AI Data Center · Patmos Center · Kansas City Star Building data center
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

Patmos AI Campus Kansas City: source record

operational

Major capacity conflict: the November 2024 Patmos release describes a '100 MW' data center, datacentermap lists 100 MW / 400,000 sq ft, servercountry lists 100 MW, while a later Patmos release states 35 MW planned with 5 MW built and 7 MW added. Third-party tracker cleanview.co lists 40 MW. No MW asserted here. Includes roughly 150,000 sq ft of tech hub / coworking space. Square footage also reported as 400,000 (earlier release) vs 421,112.

Key data: Evergy | SPP (Evergy Metro)

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

OWNERSHIP AND PROFILE

Patmos AI Campus Kansas City: ownership and profile

operational

Developer: Patmos | Owner: Patmos | County: Jackson | Research region: Kansas City downtown / Crossroads | Tenants/customers: Two unnamed publicly traded tenants

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

CONFLICTING

Patmos announced on 2024-11-14 that it would convert the former Kansas City Star printing plant, a four-story 400,000 sq ft building on five acres, into a data center described as 100 MW, with roughly 150,000 sq ft of tech hub and coworking space and two unnamed publicly traded tenants.

Key data: Former Kansas City Star building; 100 MW as announced 2024

Claim classification: proposal_or_announced_commitment · Verification: conflicting_sources_preserved · Retrieved: 2026-09-13

Limitation: Superseded in part by later Patmos statements of 35 MW planned.

Open source 1

POWER AND GRID

Patmos AI Campus Kansas City: power and grid

operational

Key data: Utility: Evergy | Grid area: SPP (Evergy Metro)

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

operational

Patmos states the 1601 McGee St project has 35 MW planned, with 5 MW built in under 90 days and a further 7 MW added, and that it secured a $100 million C-PACE loan from PACE Loan Group via Show Me PACE, reported as the largest Missouri C-PACE loan.

Key data: 35 MW planned; 5 MW built plus 7 MW added; $100M C-PACE loan

Claim classification: documented_fact · Verification: conflicting_sources_preserved · Retrieved: 2026-09-13

Status date: 2026-09

Limitation: Directly conflicts with Patmos' own 2024 announcement of a '100 MW' data center and with datacentermap's 100 MW listing.

Open source 1

WATER AND COOLING

Patmos AI Campus Kansas City: water and cooling

operational

Key data: Cooling: Liquid cooling, immersion cooling and rear-door heat exchangers

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

PERMITS AND JURISDICTION

Patmos AI Campus Kansas City: permits and jurisdiction

operational

Key data: Jurisdictions: Kansas City | Jackson County | Missouri | Tax incentives: $100 million C-PACE loan from PACE Loan Group via Show Me PACE (reported as the largest Missouri C-PACE loan)

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

TIMELINE

Patmos AI Campus Kansas City: timeline

operational

Patmos announced conversion of the Kansas City Star building into a data center described as 100+ MW

Claim classification: Not yet assigned

Status date: 2024-11-14

Open source 1

operational

$100 million C-PACE loan announced

Claim classification: Not yet assigned

Status date: 2026-01-12

Open source 1

operational

Patmos states 35 MW planned, with 5 MW built in under 90 days and a further 7 MW added

Claim classification: Not yet assigned

Status date: 2026-09

Open source 1

Sources

Evidence and provenance

Open MO state research →

Patmos AI Campus Kansas City Data Center Project | Kansas City | Compute Equity Atlas