This record consolidates 20 research observations while retaining source distinctions, location precision and unresolved fields.

approved_or_permittedproject status
CORROBORATEDbest evidence tier
20linked evidence rows
Project facts

Location and operating record

Operator / developerUnnamed developer conducting an electric power feasibility study
JurisdictionJoplin, MO
AddressSouthwest corner of Central City Road and West 20th Street
Location precisionparcel or bounded site
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesWildwood Ranch Industrial Complex · Wildwood Ranch · Joplin data center · Wildwood Ranch data center
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure5 rows
SOURCE RECORD

Wildwood Ranch Industrial Complex: source record

approved

Datacentermap lists this site (W 20th St & S Central City Rd, 64804) as a 200 MW proposed data center; servercountry.org also lists 200 MW; no city or utility document fetched states a MW figure, so none is asserted. Area figures conflict: about 600.4 acres rezoned per the City of Joplin, while missouridatacenters.org describes annexation of 540 acres and rezoning of about 600 acres. James 'Jimmer' Pinjuv owns the surrounding 2,064-acre Wildwood Ranch. A prior 2009 annexation agreement applies to the property. missouridatacenters.org attributes the Wildwood Ranch project to Geronimo Power, which conflicts with the City of Joplin record naming Wildwood Ranch LLC as applicant and with Geronimo's own separately sited eastern Jasper County project; this conflict is preserved. missouridatacenters.org states water may come from Stockton.

Key data: Joplin municipal / regional utility (not documented in fetched sources) | Council Bills 2026-256 and 2026-257

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

OWNERSHIP AND PROFILE

Wildwood Ranch Industrial Complex: ownership and profile

approved

Developer: Unnamed developer conducting an electric power feasibility study | Owner: Wildwood Ranch LLC (managing member James 'Jimmer' Pinjuv) | Permit applicant: Wildwood Ranch LLC | County: Jasper | Research region: Southwest Missouri

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

CONFLICTING

MissouriDataCenters.org attributes the Wildwood Ranch Joplin project to Geronimo Power and describes annexation of 540 acres with rezoning of about 600 acres and possible water supply from Stockton.

Key data: Geronimo Power attribution; 540 acres annexed

Claim classification: contested_claim · Verification: conflicting_sources_preserved · Retrieved: 2026-09-13

Limitation: Conflicts with City of Joplin records naming Wildwood Ranch LLC as applicant and with Geronimo's separately sited eastern Jasper County project.

Open source 1

POWER AND GRID

Wildwood Ranch Industrial Complex: power and grid

approved

Key data: Utility: Joplin municipal / regional utility (not documented in fetched sources)

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

CONFLICTING

Datacentermap lists the Joplin site at West 20th Street and South Central City Road, 64804, as a 200 MW proposed data center.

Key data: 200 MW proposed per directory

Claim classification: unsupported_claim · Verification: conflicting_sources_preserved · Retrieved: 2026-09-13

Limitation: No city or utility document confirms a MW figure; the 200 MW value appears only in commercial trackers.

Open source 1

WATER AND COOLING

Wildwood Ranch Industrial Complex: water and cooling

approved

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

PERMITS AND JURISDICTION

Wildwood Ranch Industrial Complex: permits and jurisdiction

approved

Key data: Zoning case: Council Bills 2026-256 and 2026-257 | Jurisdictions: Joplin | Jasper County | Missouri

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

approved

The City of Joplin documents that Wildwood Ranch LLC filed a voluntary annexation and rezoning request from R-1 to M-2 on 2025-12-04 for about 600.4 acres at the southwest corner of Central City Road and West 20th Street; Planning and Zoning approved it 2026-01-12 and the City Council passed Council Bills 2026-256 and 2026-257 on 2026-02-17.

Key data: ~600.4 acres rezoned R-1 to M-2; council approval 2026-02-17

Claim classification: documented_fact · Verification: verified_by_primary_source · Retrieved: 2026-09-13

Status date: 2026-02-17

Limitation: The city page does not name an end user, developer or MW capacity.

Open source 1

CIVIC AND COMMUNITY

Wildwood Ranch Industrial Complex: civic and community

approved

A Petition of Protest was filed

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

approved

Joplin attorney Derek Snyder filed suit in March 2026 to void the rezoning

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

approved

About 50 residents protested at City Hall on 2026-05-01

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

approved

The 2026-02-17 council meeting ran between 3.5 and 7 hours

Claim classification: Not yet assigned

Status date: 2026-09-13

Open source 1

CORROBORATED

The Joplin City Council passed the annexation and rezoning after a lengthy meeting, following a Petition of Protest; a Joplin attorney filed suit in March 2026 to void the rezoning and about 50 residents protested at City Hall on 2026-05-01.

Key data: Petition of Protest, March 2026 lawsuit, ~50 protesters

Claim classification: documented_fact · Verification: source_backed_unverified · Retrieved: 2026-09-13

Limitation: Litigation outcome not determined in fetched sources.

Open source 1

TIMELINE

Wildwood Ranch Industrial Complex: timeline

approved

Voluntary annexation and rezoning from R-1 to M-2 filed

Claim classification: Not yet assigned

Status date: 2025-12-04

Open source 1

approved

Joplin Planning & Zoning approved the request

Claim classification: Not yet assigned

Status date: 2026-01-12

Open source 1

approved

First reading of Council Bills 2026-256 and 2026-257

Claim classification: Not yet assigned

Status date: 2026-01-20

Open source 1

approved

Joplin City Council passed the annexation and rezoning

Claim classification: Not yet assigned

Status date: 2026-02-17

Open source 1

approved

No construction permit applications had been filed as of this date

Claim classification: Not yet assigned

Status date: 2026-03-06

Open source 1

STATUS AND DEVELOPMENT

Wildwood Ranch Industrial Complex: status and development

approved

The City of Joplin FAQ states that as of 2026-03-06 no construction permit applications had been submitted and that an unnamed developer was conducting an electric power feasibility study.

Key data: No construction permit applications as of 2026-03-06

Claim classification: documented_fact · Verification: verified_by_primary_source · Retrieved: 2026-09-13

Status date: 2026-03-06

Limitation: Point-in-time statement; status may have changed after 2026-03-06.

Open source 1

LOCATION AND SITE

Wildwood Ranch Industrial Complex: location and site

CORROBORATED

Joplin approved the annexation and rezoning for a potential data center, with the land owner identified as James 'Jimmer' Pinjuv, managing member of Wildwood Ranch LLC and owner of the surrounding 2,064-acre Wildwood Ranch.

Key data: Owner James 'Jimmer' Pinjuv; 2,064-acre ranch

Claim classification: documented_fact · Verification: source_backed_unverified · Retrieved: 2026-09-13

Limitation: No end user identified.

Open source 1

Sources

Evidence and provenance

Open MO state research →