Project facts

Location and operating record

Operator / developerNot established in current evidence
JurisdictionCaddo & Bossier Parishes (Shreveport), LA
Address7340 Greenwood Rd, Shreveport (Resilient Technology Park, ~250–313 ac)
Location precisionstreet address
Coordinatesnull, null
CapacityNot established
AliasesAmazon / STACK Infrastructure (~$12B)
Evidence coverage

What has been researched

Project profile1 rows
Intent / permits0 rows
Civic / infrastructure2 rows
EXACT LOCATION

Amazon / STACK Infrastructure (~$12B): exact location

CORROBORATED

Three northwest Louisiana sites are documented: the Resilient Technology Park at 7340 Greenwood Road in west Shreveport (~250–313 acres, seven buildings, ~3M sq ft); a Caddo Parish site near Blanchard Latex Road and State Line Road; and a Bossier Parish site on the west side of Highway 3 about five miles north of Benton.

Key data: 7340 Greenwood Rd, Shreveport (Resilient Technology Park, ~250–313 ac); Blanchard Latex Rd & State Line Rd (Caddo); Hwy 3 north of Benton (Bossier)

Limitation: Investment totals reported variously as $12B and $18B across phases; parcel IDs not published.

Open source →

WATER WITHDRAWAL VOLUME

Amazon / STACK Infrastructure (~$12B): water withdrawal volume

Resolution passed committee

Amazon committed up to $400 million to regional water infrastructure across the Caddo-Bossier campuses. Separately, House Resolution 20 by Rep. Danny McCormick — which passed the House Natural Resources Committee unanimously — encourages the Department of Conservation and Energy to investigate the effects of the Amazon data center's water consumption on Caddo Lake, from which Amazon intends to draw cooling water.

Key data: Up to $400M regional water infrastructure; HR 20 study of Caddo Lake withdrawal impacts

Status date: 2026-03-25

Limitation: No withdrawal volume figure disclosed for the Amazon campuses

Open source →

AGRICULTURAL OR LAND USE CONVERSION

Amazon / STACK Infrastructure (~$12B): agricultural or land use conversion

Platted

The Amazon-STACK footprint spans roughly 1,400 acres across Caddo and Bossier parishes, with the Bossier technology park's final plat cleared in March 2026.

Key data: ~1,400 acres

Status date: 2026-03

Limitation: Prior land use not characterized

Open source →

Sources

Evidence and provenance

  • WWL-TV · CORROBORATED
    Limitation: Investment totals reported variously as $12B and $18B across phases; parcel IDs not published.
  • Shreveport Times · CORROBORATED
    Limitation: No withdrawal volume figure disclosed for the Amazon campuses
  • Shreveport Times · CORROBORATED
    Limitation: Prior land use not characterized

Open LA state research →