AmpZ Champion Data Center (Project LufKin)

This record consolidates 28 research observations while retaining source distinctions, location precision and unresolved fields.

proposed_or_reviewproject status
CORROBORATEDbest evidence tier
28linked evidence rows
Project facts

Location and operating record

Operator / developerAmpZ Champion Data Center Holdings (Denver, CO)
JurisdictionLufkin, TX
AddressState Highway 103 East (former Southland Paper Mill property)
Location precisionlocality centroid
CoordinatesNot published; no coordinate inferred
Capacity2100 MW
AliasesAmpZ Champion Data Center (Project LufKin) · Former Southland Paper Mill site, SH 103 East · Project LufKin · AmpZ Champion · Champion Data Center
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure2 rows
SOURCE RECORD

AmpZ Champion Data Center (Project LufKin): source record

planned

Largest identified East Texas project. Tax abatement request was pending with Angelina County as of July 2026. Acreage stated at ~1,041 acres with expansion potential to ~4,000 acres.

Key data: NOT_FOUND | ERCOT (East Texas) | NOT_FOUND | NOT_FOUND

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

AmpZ Champion Data Center (Project LufKin): ownership and profile

planned

Developer: AmpZ Champion Data Center Holdings with EPG Champion Development LLC (Atlanta, GA; Raine Cotton) | Owner: AmpZ Champion Data Center Holdings (land previously held by Verdant Industries, purchased 2010 for $11 million) | County: Angelina | Research region: East Texas / South Texas-RGV / Statewide Rural Gap Pass

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

AmpZ Champion Data Center (Project LufKin): power and grid

planned

Key data: Grid area: ERCOT (East Texas) | Gross MW: 2100 | Requested load MW: 2100 | Onsite generation MW: 1000 | Substations: Existing on-site substation with ~55 MW available capacity

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

AmpZ Champion Data Center (Project LufKin): water and cooling

planned

Key data: Water demand: ~30,000 gallons initial closed-loop fill; ~500 gallons/day makeup (as presented by developer) | Cooling: closed-loop liquid cooling

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

AmpZ Champion Data Center (Project LufKin): permits and jurisdiction

planned

Key data: Jurisdictions: Angelina County (County Judge Keith Wright states county has no permitting authority over the project) | State of Texas / ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

CIVIC AND COMMUNITY

AmpZ Champion Data Center (Project LufKin): civic and community

planned

Organized local opposition in Lufkin/Angelina County over noise, power cost and water

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

County judge states county lacks authority to regulate the project

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

AmpZ Champion Data Center (Project LufKin): environment and site

planned

Reuse of former Southland Paper Mill industrial site

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

Water use questioned by residents; developer says closed-loop

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

Key data: Surrounding infrastructure: Existing on-site substation (~55 MW)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

Key data: Surrounding infrastructure: Former paper mill industrial infrastructure

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

Key data: Surrounding infrastructure: Potential expansion to as much as 4,000 acres

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

AmpZ Champion Data Center (Project LufKin): timeline

planned

Land purchased from Verdant Industries for $11 million

Claim classification: Not yet assigned

Status date: 2010

Open source 1 →

planned

Project publicly surfaces; community pushback reported in East Texas

Claim classification: Not yet assigned

Status date: 2026-06-09

Open source 1 →

planned

Continued organized backlash reported; tax abatement request pending

Claim classification: Not yet assigned

Status date: 2026-07-09

Open source 1 →

planned

Phase target: 175 MW

Claim classification: Not yet assigned

Status date: 2026

Open source 1 →

planned

Phase target: 1.1 GW

Claim classification: Not yet assigned

Status date: 2028

Open source 1 →

planned

Phase target: 1 GW on-site generation

Claim classification: Not yet assigned

Status date: 2029

Open source 1 →

EXACT LOCATION

AmpZ Champion Data Center (Project LufKin): exact location

planned

Project sited on the former Southland Paper Mill property along State Highway 103 East in Angelina County.

Key data: SH 103 East, former Southland Paper Mill tract

Claim classification: reported_fact · Verification: corroborated_two_sources · Retrieved: 2026-09-05

Status date: 2026-06-09

Limitation: No coordinates or parcel IDs published; locality-level only.

Open source 1 →

DEVELOPER

AmpZ Champion Data Center (Project LufKin): developer

planned

Developed by AmpZ Champion Data Center Holdings of Denver together with EPG Champion Development LLC of Atlanta (Raine Cotton).

Key data: AmpZ Champion Data Center Holdings; EPG Champion Development LLC

Claim classification: reported_fact · Verification: corroborated_two_sources · Retrieved: 2026-09-05

Status date: 2026-07-09

Limitation: Operating entity for the completed facility is not identified.

Open source 1 →

CAPACITY GROSS POWER

AmpZ Champion Data Center (Project LufKin): capacity gross power

planned

Initial project scope described as 2.1 GW, phased from 175 MW in 2026 to 1.1 GW in 2028.

Key data: 2,100 MW planned; 175 MW (2026); 1.1 GW (2028)

Claim classification: developer_claim · Verification: single_source · Retrieved: 2026-09-05

Status date: 2026

Limitation: Phased capacity figures are developer projections, not interconnection agreements.

Open source 1 →

SUBSTATION

AmpZ Champion Data Center (Project LufKin): substation

planned

Existing on-site substation with roughly 55 MW of available capacity would support the first phase.

Key data: ~55 MW existing on-site substation capacity

Claim classification: developer_claim · Verification: single_source · Retrieved: 2026-09-05

Status date: 2026

Limitation: Utility and ERCOT interconnection identifiers not published.

Open source 1 →

ONSITE GENERATION

AmpZ Champion Data Center (Project LufKin): onsite generation

planned

Approximately 1 GW of on-site generation is targeted for 2029.

Key data: 1,000 MW on-site generation by 2029

Claim classification: developer_claim · Verification: single_source · Retrieved: 2026-09-05

Status date: 2026

Limitation: Fuel type and permitting pathway not stated.

Open source 1 →

WATER DEMAND

AmpZ Champion Data Center (Project LufKin): water demand

planned

Developer describes a closed-loop system with roughly a 30,000-gallon initial fill and about 500 gallons per day of makeup water.

Key data: ~30,000 gal fill; ~500 gal/day makeup

Claim classification: developer_claim · Verification: single_source · Retrieved: 2026-09-05

Status date: 2026-06-09

Limitation: Figures are as presented by the developer at public meetings; not independently verified.

Open source 1 →

JOBS

AmpZ Champion Data Center (Project LufKin): jobs

planned

Project presented as creating 500 construction jobs and 30 permanent positions.

Key data: 500 construction; 30 permanent

Claim classification: developer_claim · Verification: single_source · Retrieved: 2026-09-05

Status date: 2026-06-09

Limitation: No abatement agreement job commitment located.

Open source 1 →

JURISDICTION STACK

AmpZ Champion Data Center (Project LufKin): jurisdiction stack

planned

Angelina County Judge Keith Wright stated the county has no authority to regulate the project; a tax abatement request was pending.

Key data: County judge: no county permitting authority

Claim classification: official_statement · Verification: corroborated_two_sources · Retrieved: 2026-09-05

Status date: 2026-07-09

Limitation: Abatement outcome not resolved in fetched sources.

Open source 1 →

COMMUNITY RESPONSE

AmpZ Champion Data Center (Project LufKin): community response

planned

Organized community pushback in East Texas over the Lufkin project was reported twice within two months.

Key data: Community pushback reported June and July 2026

Claim classification: reported_fact · Verification: corroborated_two_sources · Retrieved: 2026-09-05

Status date: 2026-07-09

Open source 1 →

CAMPUS ACRES

AmpZ Champion Data Center (Project LufKin): campus acres

planned

Site described as roughly 1,041 acres with potential expansion to as much as 4,000 acres; land bought from Verdant Industries for $11 million in 2010.

Key data: ~1,041 acres (up to 4,000); $11M 2010 land purchase

Claim classification: reported_fact · Verification: single_source · Retrieved: 2026-09-05

Status date: 2026-06-09

Limitation: Appraisal district parcel IDs not retrieved.

Open source 1 →