Source-backed project record · LA

Applied Digital "Delta Forge 1"

This canonical record consolidates 12 source-backed observations without discarding aliases, limitations or unresolved dimensions.

under_constructionproject status
VERIFIED_PRIMARYbest evidence tier
12linked evidence rows
Project facts

Location and operating record

Operator / developerApplied Digital Corporation
JurisdictionRapides Parish, LA
AddressNot published
Location precisionparcel or bounded site
Coordinatesnull, null
Capacity756 MW
AliasesApplied Digital "Delta Forge 1"
Evidence coverage

What has been researched

Project profile8 rows
Intent / permits0 rows
Civic / infrastructure4 rows
OWNERSHIP CHAIN / OPERATOR

Applied Digital "Delta Forge 1": ownership chain / operator

CORROBORATED

Applied Digital Corporation (NASDAQ: APLD) owns and will operate the Delta Forge 1 campus, developed in coordination with Cleco and the England Authority.

Key data: Applied Digital Corporation

Limitation: Applied Digital's own press release page returned no content on fetch; tenant not named.

Open source →

POWER SUPPLIER

Applied Digital "Delta Forge 1": power supplier

CORROBORATED

Cleco supplies the campus with roughly 430 MW of utility capacity supporting ~300 MW of IT load, and is building a 756 MW gas plant for the project; the ~370 MW Tenaska Frontier facility is also tied to the buildout.

Key data: Cleco (~430 MW utility / 300 MW IT); new 756 MW Cleco gas plant; Tenaska Frontier ~370 MW

Limitation: No LPSC docket number for the Cleco generation/ESA located in fetched sources.

Open source →

WATER SUPPLIER

Applied Digital "Delta Forge 1": water supplier

CORROBORATED

The facility is described as using closed-loop cooling; no water utility, well source or volume was published in fetched sources.

Key data: Closed-loop cooling; supplier NOT_FOUND

Limitation: Louisiana has no state water-withdrawal permitting program, so no permit record exists to verify supply.

Open source →

JURISDICTION STACK

Applied Digital "Delta Forge 1": jurisdiction stack

CORROBORATED

The site lies within the England Economic & Industrial Development District (England Authority), specifically England District Subdistrict No. 4, with Rapides Parish as the local government, Cleco as regulated utility under the LPSC, and LED providing state incentives.

Key data: England Authority / England District Subdistrict No. 4; Rapides Parish; LPSC; LED

Limitation: Parish zoning role limited; no municipal jurisdiction (outside Boyce town limits).

Open source →

PLANNING ZONING CONTACT

Applied Digital "Delta Forge 1": planning zoning contact

DISCOVERY_LEAD

NOT_FOUND for a named planner. Land-use control runs through the England Authority subdistrict and Rapides Parish; no parish planning staff member or England Authority planning contact was published in the fetched sources.

Key data: England Authority / Rapides Parish (bodies only)

Limitation: England Authority staff directory not retrieved.

Open source →

ECON DEV CONTACT

Applied Digital "Delta Forge 1": econ dev contact

CORROBORATED

Regional economic development is led by Louisiana Central (CLEDA) with its CEO named; Cleco's economic development arm and LED are also involved.

Key data: Chris Masingill, CEO, Louisiana Central (CLEDA); Cleco Economic Development; LED

Limitation: No direct phone/email published.

Open source →

GENERAL CONTACT

Applied Digital "Delta Forge 1": general contact

DISCOVERY_LEAD

NOT_FOUND for a project-specific contact. Applied Digital's investor-relations press release page returned no content on fetch, and no community-relations email or phone was published in the accessible coverage; Cleco's economic development site is the closest public channel.

Limitation: IR page fetch returned no content.

Open source →

SURROUNDING INFRASTRUCTURE

Applied Digital "Delta Forge 1": surrounding infrastructure

CORROBORATED

The campus sits directly on the I-49 corridor near Boyce adjacent to existing Cleco generation facilities, with a new 756 MW gas plant and substation infrastructure being built to serve it, inside an established industrial district.

Key data: I-49 frontage; adjacent Cleco generation; new 756 MW plant

Limitation: Transmission voltages, water lines and fiber routes not documented.

Open source →

WATER WITHDRAWAL VOLUME

Applied Digital "Delta Forge 1": water withdrawal volume

Committed / under construction

Applied Digital estimated 866,000 gallons per building for the initial closed-loop fill (just over 1.7 million gallons for two buildings), with committed routine use of 1,200–4,800 gallons per day and a 50 gallons-per-minute withdrawal limit, at 430 MW total power and 300 MW critical IT load across 672.52 allotted acres.

Key data: 866,000 gal/building initial fill; 1,200–4,800 gal/day routine; 50 gpm limit

Status date: 2026

Limitation: Aggregator compiling LDEQ records; primary LDEQ permit document not retrieved

Open source →

COMMUNITY OPPOSITION OR LITIGATION

Applied Digital "Delta Forge 1": community opposition or litigation

Citation issued

No organized opposition group was identified, but the project drew dust complaints and an LDEQ citation on May 27 for failure to control particulate emissions. Local habitat advocates have circulated concerns about the conversion of about 300 acres of farmland.

Key data: LDEQ citation 2026-05-27 for failure to control particulate emissions; dust complaints

Status date: 2026-05-27

Limitation: Citation reported via aggregator citing KALB; LDEQ enforcement document not retrieved

Open source →

AGRICULTURAL OR LAND USE CONVERSION

Applied Digital "Delta Forge 1": agricultural or land use conversion

Site work began January 2026

The campus occupies roughly 300 of 672.52 allotted acres for the initial two-building plan. Habitat advocates characterize the site as 300 acres of farmland.

Key data: ~300 acres developed of 672.52 allotted

Status date: 2026

Limitation: The farmland characterization comes from an advocacy social post, not a land-use record; treat as DISCOVERY_LEAD

Open source →

FISCAL IMPACT LOCAL GOVERNMENT

Applied Digital "Delta Forge 1": fiscal impact local government

Announced / under construction

The $3.6 billion, 300 MW critical-load campus qualifies for the Act 730 (2024) state and local sales and use tax exemption for data centers, and projects 200 full-time jobs at 150% of the state average wage, 1,000 construction jobs and 218 indirect jobs. Site work began January 2026 with operations targeted for mid-2027.

Key data: $3.6B investment; Act 730 state+local sales/use tax exemption; 200 FTE at 150% of state average wage

Status date: 2026

Limitation: Economic-development announcement; foregone tax value not quantified

Open source →