This record consolidates 18 research observations while retaining source distinctions, location precision and unresolved fields.

proposed_or_reviewproject status
CORROBORATEDbest evidence tier
18linked evidence rows
Project facts

Location and operating record

Operator / developerBarrio Resources LLC
JurisdictionTyler, TX
Address1101 & 1105 W. Erwin St.
Location precisionstreet address
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesBarrio Resources LLC bitcoin mining data center (Vulcan Core), Tyler · 1101 & 1105 W. Erwin Street · Vulcan Core · Zoning case S26-003
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure1 rows
SOURCE RECORD

Barrio Resources LLC bitcoin mining data center (Vulcan Core), Tyler: source record

planned

Small-footprint (1.92 acre) crypto mining data center; permitting contested. Status is unresolved pending council/ZBA action.

Key data: Oncor Electric Delivery | ERCOT (North/East Texas) | NOT_FOUND | S26-003

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Barrio Resources LLC bitcoin mining data center (Vulcan Core), Tyler: ownership and profile

planned

Developer: Barrio Resources LLC | Permit applicant: Barrio Resources LLC | County: Smith | Research region: East Texas / South Texas-RGV / Statewide Rural Gap Pass

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Barrio Resources LLC bitcoin mining data center (Vulcan Core), Tyler: power and grid

planned

Key data: Utility: Oncor Electric Delivery | Grid area: ERCOT (North/East Texas)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Barrio Resources LLC bitcoin mining data center (Vulcan Core), Tyler: water and cooling

planned

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Barrio Resources LLC bitcoin mining data center (Vulcan Core), Tyler: permits and jurisdiction

planned

Key data: Zoning case: S26-003 | Jurisdictions: City of Tyler Planning & Zoning Commission | Tyler City Council | Tyler Zoning Board of Adjustment | Smith County

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

CIVIC AND COMMUNITY

Barrio Resources LLC bitcoin mining data center (Vulcan Core), Tyler: civic and community

planned

Significant resident opposition on noise grounds; P&Z denial

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

Barrio Resources LLC bitcoin mining data center (Vulcan Core), Tyler: environment and site

planned

Key data: Surrounding infrastructure: M-1 Light Industrial zoning district

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

Key data: Surrounding infrastructure: Existing Oncor distribution

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Barrio Resources LLC bitcoin mining data center (Vulcan Core), Tyler: timeline

planned

Tyler Planning & Zoning Commission denies specific use permit 5-2 after community pushback

Claim classification: Not yet assigned

Status date: 2026-07-07

Open source 1 →

planned

Applicant appeals denial to Tyler City Council; ZBA jurisdiction hearings scheduled

Claim classification: Not yet assigned

Status date: 2026-08-27

Open source 1 →

planned

Additional ZBA hearing dates

Claim classification: Not yet assigned

Status date: 2026-09-03

Open source 1 →

planned

Additional ZBA hearing dates

Claim classification: Not yet assigned

Status date: 2026-09-10

Open source 1 →

ZONING LAND USE

Barrio Resources LLC bitcoin mining data center (Vulcan Core), Tyler: zoning land use

planned

City of Tyler zoning case S26-003 covers the proposed bitcoin mining data center at 1101 and 1105 W. Erwin Street on 1.92 acres of M-1 Light Industrial land.

Key data: Case S26-003; 1.92 acres; M-1 zoning

Claim classification: official_record · Verification: primary_record · Retrieved: 2026-09-05

Status date: 2026

Open source 1 →

PROJECT STATUS

Barrio Resources LLC bitcoin mining data center (Vulcan Core), Tyler: project status

planned

The Planning and Zoning Commission denied the request 5-2 after community pushback; the applicant appealed to City Council.

Key data: P&Z denial 5-2 on 2026-07-07; appealed

Claim classification: reported_fact · Verification: corroborated_two_sources · Retrieved: 2026-09-05

Status date: 2026-07-07

Limitation: Final Council/ZBA outcome not resolved in fetched sources.

Open source 1 →

PROJECT TIMELINE

Barrio Resources LLC bitcoin mining data center (Vulcan Core), Tyler: project timeline

planned

Zoning Board of Adjustment jurisdiction hearings were scheduled for August 27, September 3 and September 10, 2026.

Key data: ZBA hearings 2026-08-27, 09-03, 09-10

Claim classification: official_record · Verification: primary_record · Retrieved: 2026-09-05

Status date: 2026-09-10

Open source 1 →

POWER SUPPLIER

Barrio Resources LLC bitcoin mining data center (Vulcan Core), Tyler: power supplier

planned

Oncor Electric Delivery is the electric utility for the site.

Key data: Oncor Electric Delivery

Claim classification: reported_fact · Verification: single_source · Retrieved: 2026-09-05

Status date: 2026

Limitation: No load figure or interconnection record published.

Open source 1 →

JOBS

Barrio Resources LLC bitcoin mining data center (Vulcan Core), Tyler: jobs

planned

Project presented as creating roughly 7 to 10 jobs.

Key data: 7-10 jobs

Claim classification: developer_claim · Verification: single_source · Retrieved: 2026-09-05

Status date: 2026

Open source 1 →

COMMUNITY RESPONSE

Barrio Resources LLC bitcoin mining data center (Vulcan Core), Tyler: community response

planned

Residents opposed the project, contributing to the commission's rejection.

Key data: Community pushback preceded 5-2 denial

Claim classification: reported_fact · Verification: single_source · Retrieved: 2026-09-05

Status date: 2026-07-07

Open source 1 →