Evidence record
August 2026 issuer infrastructure table lists Rockdale electrical capacity online while potential AI conversion remains under active evaluation. This is an operating mining facility, not a claim of commissioned AI capacity. Distinct from Riot Whinstone; no shared municipal centroid or aggregate power is assigned.
Claim classification: Not yet assigned · Verification: first_party_verified · Retrieved: 2026-10-30
Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.