under_construction
Two 12.5 MW phases totalling 25 MW in 45,000 sq ft on ~10 acres. Georgetown owns its electric utility, so the city is simultaneously the zoning authority, the power supplier and the incentive grantor.
Key data: Georgetown Utility Systems (municipal electric) | ERCOT South Central / Austin-Central Texas load zone | City of Georgetown | NOT_FOUND
Claim classification: Not yet assigned
Status date: 2026-09-05