Blueprint Data Centers Taylor

This record consolidates 12 research observations while retaining source distinctions, location precision and unresolved fields.

under_constructionproject status
SOURCE_BACKEDbest evidence tier
12linked evidence rows
Project facts

Location and operating record

Operator / developerBlueprint Data Centers
JurisdictionTaylor, TX
Address1601 Martin Luther King Jr Dr
Location precisionstreet address
CoordinatesNot published; no coordinate inferred
Capacity60 MW
AliasesBlueprint Data Centers Taylor · 1601 Martin Luther King Jr. Drive · Blueprint Taylor · Taylor DC
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

Blueprint Data Centers Taylor: source record

under_construction

Three buildings totalling 135,000 sq ft and 60 MW on 52 acres; initial Oncor contract covers 30 MW.

Key data: Oncor Electric Delivery (initial 30 MW contracted) | ERCOT South Central / Austin-Central Texas load zone | NOT_FOUND | Planned Unit Development (PUD) approved by Taylor City Council 5-0

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Blueprint Data Centers Taylor: ownership and profile

under_construction

Developer: Blueprint Data Centers | Owner: Blueprint Data Centers | County: Williamson | Research region: Austin / Central Texas | Tenants/customers: Not disclosed

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Blueprint Data Centers Taylor: power and grid

under_construction

Key data: Utility: Oncor Electric Delivery (initial 30 MW contracted) | Utility region: ERCOT | Grid area: ERCOT South Central / Austin-Central Texas load zone | Gross MW: 60

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Blueprint Data Centers Taylor: water and cooling

under_construction

Key data: Cooling: Closed-loop cooling required by PUD

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Blueprint Data Centers Taylor: permits and jurisdiction

under_construction

Key data: Zoning case: Planned Unit Development (PUD) approved by Taylor City Council 5-0 | Jurisdictions: City of Taylor | Williamson County | Oncor Electric Delivery | ERCOT | Tax incentives: [object Object] | {"agreement_name":"City of Taylor economic development agreement with Blueprint Data Centers","agreement_number":"NOT_FOUND","approval_date":"2024-07-24","estimated_value":"50% property tax abatement plus 50% rebate of construction sales/use tax","government_entity":"City of Taylor","investment_commitment":"$1,000,000,000","jobs_commitment":"NOT_FOUND","source_url":"https://centexdatacenters.org/projects/blueprint-taylor","term":"10 years"}

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

Blueprint Data Centers Taylor: environment and site

under_construction

PUD requires closed-loop cooling, limiting evaporative water consumption

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

under_construction

Key data: Surrounding infrastructure: Located in Taylor near the Samsung Taylor semiconductor fab ecosystem and Oncor transmission in eastern Williamson County

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Blueprint Data Centers Taylor: timeline

under_construction

Taylor City Council approves the PUD and incentive agreement 5-0

Claim classification: Not yet assigned

Status date: 2024-07-24

Open source 1 →

EXACT LOCATION

Blueprint Data Centers Taylor: exact location

under_construction

Project occupies 52 acres at 1601 Martin Luther King Jr. Drive in Taylor with three buildings totalling 135,000 sq ft.

Key data: 1601 MLK Jr Dr; 52 acres; 3 buildings

Claim classification: tracker_aggregation · Verification: SOURCE_BACKED · Retrieved: 2026-09-05

Status date: 2026-01-01

Limitation: None

Open source 1 →

ZONING LAND USE

Blueprint Data Centers Taylor: zoning land use

approved

Taylor City Council approved the Planned Unit Development and incentive package 5-0 on July 24, 2024, with the PUD requiring closed-loop cooling.

Key data: 5-0 council vote; closed-loop cooling required in PUD

Claim classification: tracker_aggregation · Verification: SOURCE_BACKED · Retrieved: 2026-09-05

Status date: 2024-07-24

Limitation: PUD ordinance text was not retrieved directly.

Open source 1 →

TAX INCENTIVES

Blueprint Data Centers Taylor: tax incentives

approved

Incentive package includes a 10-year 50% property tax abatement plus a 50% rebate of construction sales and use tax against a $1B investment.

Key data: 10-year 50% abatement + 50% construction sales/use tax rebate

Claim classification: tracker_aggregation · Verification: SOURCE_BACKED · Retrieved: 2026-09-05

Status date: 2024-07-24

Limitation: None

Open source 1 →

INTERCONNECTION

Blueprint Data Centers Taylor: interconnection

under_construction

Initial power is contracted with Oncor Electric Delivery for 30 MW of the project's 60 MW planned capacity.

Key data: 30 MW initial Oncor contract of 60 MW planned

Claim classification: tracker_aggregation · Verification: SOURCE_BACKED · Retrieved: 2026-09-05

Status date: 2026-01-01

Limitation: No Oncor or PUCT filing retrieved to corroborate.

Open source 1 →

Sources

Evidence and provenance

Open TX state research →

Blueprint Data Centers Taylor Data Center Project | Taylor | Compute Equity Atlas