Source-backed project record · TX

Cedarvale Data Center Campus (Ionic Digital / Nscale Ward County)

This record consolidates 19 research observations while retaining source distinctions, location precision and unresolved fields.

operationalproject status
VERIFIED_PRIMARYbest evidence tier
19linked evidence rows
Project facts

Location and operating record

Operator / developerNscale Ward County, LLC and Ionic Digital Mining, LLC (registered operators)
JurisdictionBarstow / Pyote area, TX
AddressNot published
Location precisionlocality centroid
Coordinates31.461545, -103.395503
Capacity234 MW
AliasesCedarvale Data Center Campus (Ionic Digital / Nscale Ward County) · Cedarvale, Barslow/Pyote TX Data Center · Cedarvale campus · Ward County campus · Nscale Ward County · Barstow campus
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure1 rows
SOURCE RECORD

Cedarvale Data Center Campus (Ionic Digital / Nscale Ward County): source record

operational

Major crypto-to-AI conversion: Ionic Digital (successor to Celsius Mining assets) leases the campus to Nscale under a 126-month triple-net lease. Digital infrastructure leasing represented 90% of Q2 2026 revenue. The 'Barslow' spelling in the Comptroller registry appears to be a misspelling of Barstow, Texas.

Key data: Interconnecting utility not named | ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Cedarvale Data Center Campus (Ionic Digital / Nscale Ward County): ownership and profile

operational

Developer: Ionic Digital Inc. | Owner: Ionic Digital Cedarvale LLC | Property entity: Ionic Digital Cedarvale LLC | Permit applicant: Ionic Digital Cedarvale LLC | County: Ward | Research region: Abilene-West Central Texas / Midland-Odessa-Permian Basin | Tenants/customers: Nscale Ward County Borrower SPV, LLC (registered occupant) | Nscale

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Cedarvale Data Center Campus (Ionic Digital / Nscale Ward County): power and grid

operational

Key data: Utility: Interconnecting utility not named | Utility region: ERCOT West | Grid area: ERCOT | Gross MW: 234 | Requested load MW: 700 | Substations: Substation upgrades in progress to support expansion to 700 MW | Grid/market records: Initial 234 MW phase approved by ERCOT in 2022 | 700 MW total capacity contracted with the interconnecting utility in 2021 | Request for incremental 466 MW advances the existing agreement rather than seeking a new interconnection | Company believes the site's existing energization satisfies ERCOT's Base Load planning definition

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Cedarvale Data Center Campus (Ionic Digital / Nscale Ward County): water and cooling

operational

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Cedarvale Data Center Campus (Ionic Digital / Nscale Ward County): permits and jurisdiction

operational

Key data: Jurisdictions: Ward County | Texas Comptroller of Public Accounts | PUCT | ERCOT | Tax incentives: [object Object],[object Object] | {"agreement_name":"Texas Comptroller Qualifying Data Center Project registration - Cedarvale, Barslow/Pyote TX Data Center","agreement_number":"DC961705-OW1 / DC961705-OC1 / DC737649-OP1","approval_date":"2024-01-30","estimated_value":"State sales-and-use tax exemption","government_entity":"Texas Comptroller of Public Accounts","investment_commitment":"NOT_FOUND","jobs_commitment":"NOT_FOUND","source_url":"https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php","term":"Exemption end date 2026-03-15"} | {"agreement_name":"Texas Comptroller Qualifying LARGE Data Center Project registration - Cedarvale, Barslow/Pyote TX Data Center","agreement_number":"LD449964-OW1 / LD449964-OC1 / LD449964-OP1 / LD449964-OP2","approval_date":"2026-03-16","estimated_value":"State sales-and-use tax exemption","government_entity":"Texas Comptroller of Public Accounts","investment_commitment":"NOT_FOUND","jobs_commitment":"NOT_FOUND","source_url":"https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php","term":"NOT_FOUND"}

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

CIVIC AND COMMUNITY

Cedarvale Data Center Campus (Ionic Digital / Nscale Ward County): civic and community

operational

Company states it supports Governor Abbott's responsible data center development efforts and will participate in PUCT and ERCOT verification and audit processes

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Cedarvale Data Center Campus (Ionic Digital / Nscale Ward County): timeline

operational

Capacity to expand the campus to 700 MW contracted with the interconnecting utility

Claim classification: Not yet assigned

Status date: 2021

Open source 1 →

operational

Initial 234 MW phase approved by ERCOT

Claim classification: Not yet assigned

Status date: 2022

Open source 1 →

operational

Ward County site energized and operating

Claim classification: Not yet assigned

Status date: 2023

Open source 1 →

operational

Registered as a Qualifying Data Center Project with the Texas Comptroller

Claim classification: Not yet assigned

Status date: 2024-01-30

Open source 1 →

operational

Re-registered as a Qualifying LARGE Data Center Project with Nscale Ward County Borrower SPV, LLC as occupant

Claim classification: Not yet assigned

Status date: 2026-03-16

Open source 1 →

operational

Ionic Digital completes direct listing on Nasdaq (IOND)

Claim classification: Not yet assigned

Status date: 2026-07-28

Open source 1 →

operational

Cash payment commences for 234 MW of operating capacity at the Ward County campus under the Nscale lease

Claim classification: Not yet assigned

Status date: 2026-08

Open source 1 →

operational

Target energization of expansion to 700 MW, subject to ERCOT approval and two utility infrastructure projects under construction

Claim classification: Not yet assigned

Status date: 2027-12-31 (target)

Open source 1 →

INTERCONNECTION

Cedarvale Data Center Campus (Ionic Digital / Nscale Ward County): interconnection

operational

Ionic Digital reports the Ward County campus has been energized and operating since 2023, with the initial 234 MW phase approved by ERCOT in 2022 and 700 MW of total capacity contracted with the interconnecting utility in 2021; the incremental 466 MW request advances the existing agreement rather than seeking a new interconnection.

Key data: 234 MW approved 2022; 700 MW contracted 2021; incremental 466 MW requested

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-08-19

Open source 1 →

TENANT CUSTOMER

Cedarvale Data Center Campus (Ionic Digital / Nscale Ward County): tenant customer

operational

Cash payment commenced in August 2026 for 234 MW of operating capacity at the Ward County campus, and digital infrastructure leasing accounted for 90% of Ionic Digital's second-quarter 2026 revenue against none in the prior year.

Key data: 234 MW contracted; leasing = 90% of Q2 2026 revenue

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-08-19

Open source 1 →

PROJECT TIMELINE

Cedarvale Data Center Campus (Ionic Digital / Nscale Ward County): project timeline

under_construction

Expansion to 700 MW is targeted by the end of 2027 subject to ERCOT approval and completion of two utility infrastructure projects under construction; the EPC contract is executed and long lead-time transformers are ordered.

Key data: 700 MW target by end of 2027; EPC executed; transformers ordered

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-08-19

Open source 1 →

OWNERSHIP CHAIN

Cedarvale Data Center Campus (Ionic Digital / Nscale Ward County): ownership chain

operational

The Texas Comptroller registry shows the Cedarvale, Barslow/Pyote TX Data Center first registered 30 January 2024 under Ionic Digital Cedarvale LLC with Ionic Digital Mining LLC as occupant, then re-registered as a large data center project on 16 March 2026 with Nscale Ward County Borrower SPV, LLC as occupant and Nscale Ward County, LLC as an operator.

Key data: DC961705 (2024) then LD449964 (2026) with Nscale entities added

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-03-16

Open source 1 →

GRID IMPACT

Cedarvale Data Center Campus (Ionic Digital / Nscale Ward County): grid impact

operational

Ionic Digital states it believes the site's existing energization satisfies ERCOT's Base Load planning definition and has committed to participate fully in PUCT and ERCOT verification and audit processes.

Key data: Claims Base Load status under ERCOT planning criteria

Claim classification: COMPANY_CLAIM · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-08-19

Limitation: Company's own characterization of an ERCOT planning classification; not confirmed by ERCOT.

Open source 1 →

Sources

Evidence and provenance

Open TX state research →

Cedarvale Data Center Campus (Ionic Digital / Nscale Ward County) Data Center Project | Barstow / Pyote area | Compute Equity Atlas