Compute Equity Atlas
← National map
Source-backed project record · TX

Cipher Digital 'Colchis' Data Center

This record consolidates 7 research observations while retaining source distinctions, location precision and unresolved fields.

proposed_or_reviewproject status
SOURCE_BACKEDbest evidence tier
7linked evidence rows
Project facts

Location and operating record

Operator / developerCipher Digital (formerly Cipher Mining)
JurisdictionSan Angelo (northeast of), TX
AddressApproximately 2,500 feet east of the Skybox/Emergent San Angelo site
Location precisionlocality centroid
CoordinatesNot published; no coordinate inferred
Capacity1000 MW
AliasesCipher Digital 'Colchis' Data Center · Colchis · Cipher Colchis
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

Cipher Digital 'Colchis' Data Center: source record

planned

Single-source (Tier-2 local outlet). Sits outside San Angelo city limits, which is why the city reported it could not regulate the project. No acreage, cost, timeline, or permit records confirmed.

Key data: AEP Texas (direct-connect agreement reported) | ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Cipher Digital 'Colchis' Data Center: ownership and profile

planned

Developer: Cipher Digital | County: Tom Green | Research region: Abilene-West Central Texas / Midland-Odessa-Permian Basin

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Cipher Digital 'Colchis' Data Center: power and grid

planned

Key data: Utility: AEP Texas (direct-connect agreement reported) | Utility region: ERCOT West | Grid area: ERCOT | Gross MW: 1000 | Requested load MW: 1000 | Grid/market records: Reported as expected to be included in ERCOT 'Batch Zero' large-load review

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Cipher Digital 'Colchis' Data Center: water and cooling

planned

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Cipher Digital 'Colchis' Data Center: permits and jurisdiction

planned

Key data: Jurisdictions: Tom Green County | AEP Texas | ERCOT | PUCT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Cipher Digital 'Colchis' Data Center: timeline

planned

Local reporting identifies Colchis as one of three Tom Green County data center projects: 1,000 MW, direct-connect agreement with AEP, expected in ERCOT 'Batch Zero'

Claim classification: Not yet assigned

Status date: 2026-06-02

Open source 1 →

INTERCONNECTION

Cipher Digital 'Colchis' Data Center: interconnection

planned

Local reporting identifies Cipher Digital's 'Colchis' project about 2,500 feet east of the Skybox site at 1,000 MW with a direct-connect agreement with AEP and expected inclusion in ERCOT's 'Batch Zero'.

Key data: 1,000 MW; AEP direct-connect; expected in ERCOT 'Batch Zero'

Claim classification: SOURCED_FACT · Verification: PARTIALLY_VERIFIED · Retrieved: 2026-09-05

Status date: 2026-06-02

Limitation: Single Tier-2 source; no ERCOT or PUCT filing reviewed.

Open source 1 →

Sources

Evidence and provenance

Open TX state research →

Cipher Digital 'Colchis' Data Center Data Center Project | San Angelo (northeast of) | Compute Equity Atlas