Compute Equity Atlas
← National map
Source-backed project record · TX

Cipher Digital Riesel Data Center Campus

This record consolidates 17 research observations while retaining source distinctions, location precision and unresolved fields.

proposed_or_reviewproject status
CORROBORATEDbest evidence tier
17linked evidence rows
Project facts

Location and operating record

Operator / developerCipher Digital, Inc. (formerly Cipher Mining)
JurisdictionRiesel, TX
AddressOff Rattlesnake Road, north of downtown Riesel
Location precisionparcel or bounded site
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesCipher Digital Riesel Data Center Campus · Rattlesnake Road site near Sandy Creek Generating Station · Cipher McLennan · Cipher Riesel campus
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure2 rows
SOURCE RECORD

Cipher Digital Riesel Data Center Campus: source record

planned

Crypto-to-AI conversion case: Cipher is pivoting from bitcoin mining to AI/HPC hosting. The exact site was still described as not finalized by the company in mid-2026, so acreage and location remain provisional.

Key data: Grid power sought from ERCOT; sited next to the 932 MW Sandy Creek coal plant and high-capacity transmission | ERCOT | NOT_FOUND | NOT_FOUND

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Cipher Digital Riesel Data Center Campus: ownership and profile

planned

Developer: Cipher Digital, Inc. | Owner: Cipher Digital, Inc. (land acquired via county-recorded purchases) | County: McLennan | Research region: Temple-Killeen-Waco / Bryan-College Station / Texoma | Tenants/customers: AWS (reported as a Cipher customer) | Fluidstack (Google-backed; reported as a Cipher customer)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Cipher Digital Riesel Data Center Campus: power and grid

planned

Key data: Utility: Grid power sought from ERCOT; sited next to the 932 MW Sandy Creek coal plant and high-capacity transmission | Utility region: ERCOT | Grid area: ERCOT | Transmission: Adjacent to a high-capacity transmission line serving the Sandy Creek plant | Grid/market records: Applied in ERCOT's first large-load batch (Batch Zero) per local reporting

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Cipher Digital Riesel Data Center Campus: water and cooling

planned

Key data: Water source: Will not use City of Riesel water; exploring groundwater, surface water and recycled water. Lake Creek Lake water rights (BASF-owned, ~10,000 acre-feet/year, roughly 9 MGD) noted as a possible regional source | Cooling: Undetermined as of mid-2026

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Cipher Digital Riesel Data Center Campus: permits and jurisdiction

planned

Key data: Jurisdictions: State of Texas | McLennan County | City of Riesel (limited) | ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

CIVIC AND COMMUNITY

Cipher Digital Riesel Data Center Campus: civic and community

planned

Residents raised concerns; Cipher requested a town hall and had not yet appeared before the commissioners court

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

Precinct 2 Commissioner D.L. Wilson said he opposes data centers in McLennan County but has little legal authority

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

Cipher Digital Riesel Data Center Campus: environment and site

planned

Water source and cooling method unresolved

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

Neighboring Sandy Creek coal plant is offline until at least 2027 after a failure

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

Key data: Surrounding infrastructure: Adjacent to the 932 MW Sandy Creek Generating Station (coal)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

Key data: Surrounding infrastructure: High-capacity transmission corridor

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

Key data: Surrounding infrastructure: Lake Creek Lake water rights held by BASF

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Cipher Digital Riesel Data Center Campus: timeline

planned

First land purchase recorded

Claim classification: Not yet assigned

Status date: 2026-02

Open source 1 →

planned

Additional land acquired (October per county clerk records)

Claim classification: Not yet assigned

Status date: 2025-10

Open source 1 →

planned

Cipher publishes open letter to the community

Claim classification: Not yet assigned

Status date: 2026-05-08

Open source 1 →

planned

Waco Bridge reports 300-acre, up-to-500 MW plan and Batch Zero application

Claim classification: Not yet assigned

Status date: 2026-05-27

Open source 1 →

planned

DCD reports 500 MW plan with expected energization around 2028

Claim classification: Not yet assigned

Status date: 2026-07-14

Open source 1 →

Sources

Evidence and provenance

Open TX state research →

Cipher Digital Riesel Data Center Campus Data Center Project | Riesel | Compute Equity Atlas