Clean Arc Data Centers VA-1

This canonical record consolidates 8 source-backed observations without discarding aliases, limitations or unresolved dimensions.

approved_or_permittedproject status
VERIFIED_PRIMARYbest evidence tier
8linked evidence rows
Project facts

Location and operating record

Operator / developerClean Arc Data Centers
JurisdictionCaroline County / Ruther Glen, VA
AddressNot published
Location precisionparcel or bounded site
Coordinatesnull, null
Capacity900 MW
AliasesClean Arc Data Centers VA-1
Evidence coverage

What has been researched

Project profile6 rows
Intent / permits1 rows
Civic / infrastructure1 rows
EXACT LOCATION

Clean Arc Data Centers VA-1: exact location

VERIFIED_PRIMARY

The county's approval statement identifies the site by tax map parcels, acreage and interstate access point

Key data: Approximately 650 acres at the former Virginia Bazaar site just east of the I-95 Exit 110 northbound offramp; Tax Map Parcels 53-A-57 and 53-A-64B, plus 53-A-66 and 53-A-63/64/64C; M-1 zoning

Limitation: No lat-long published in the statement

Open source →

OWNERSHIP CHAIN

Clean Arc Data Centers VA-1: ownership chain

VERIFIED_PRIMARY

The contracting entity is a named wholly owned subsidiary, which resolves the shell question directly

Key data: CADC VA-1 LLC, a wholly owned subsidiary of CleanArc Data Centers Operating LLC

Limitation: Ultimate beneficial owners above CleanArc Data Centers Operating LLC not disclosed

Open source →

POWER SUPPLIER

Clean Arc Data Centers VA-1: power supplier

VERIFIED_PRIMARY

Two utilities are involved: a cooperative agreement for the first substation and the incumbent utility's interconnection queue, with a new state large-load rate class in progress

Key data: Rappahannock Electric Cooperative agreement for the first 300 MW substation; Dominion Energy queue and batch process; Virginia SCC large-load rate class as of November 2025

Limitation: No interconnection agreement or SCC case number published for VA-1 specifically

Open source →

WATER SUPPLIER

Clean Arc Data Centers VA-1: water supplier

VERIFIED_PRIMARY

The county limits its water role to non-cooling uses under the performance agreement

Key data: Caroline County water for washing and flushing only; no potable water for industrial cooling

Limitation: The alternative cooling water source is not named in the statement

Open source →

JURISDICTION STACK and ECON DEV CONTACT

Clean Arc Data Centers VA-1: jurisdiction stack and econ dev contact

VERIFIED_PRIMARY

Approval came through the Board of Supervisors with an economic development performance agreement administered by the county EDA

Key data: Caroline County Board of Supervisors approved 5-1 on 2025-08-12; Caroline County Economic Development Authority as party

Limitation: No named EDA staff contact, phone or email published in the statement

Open source →

SURROUNDING INFRASTRUCTURE

Clean Arc Data Centers VA-1: surrounding infrastructure

CORROBORATED

Site metrics catalogue interstate access, transmission proximity and the nearest waterway

Key data: 500 kV line approximately 3.0 miles; Long Creek approximately 0.9 miles; immediately east of I-95 Exit 110

Limitation: Substation names, water/sewer trunk mains, rail and fiber not itemized

Open source →

AIR PERMIT APPLICATION

Clean Arc Data Centers VA-1: air permit application

Listed as an issued air permit for a data center

Status date: 07/02/2026

Limitation: New (-1) registration in a county with little prior data-center footprint; no capacity stated.

Open source →

UTILITY INTERCONNECTION QUEUE

Clean Arc Data Centers VA-1: utility interconnection queue

Priority position claimed

Queue-related but not numeric: the County's official statement says CleanArc completed Dominion's application process and was already "in the queue" as a priority for power **before** Dominion implemented its "batch system," which processes new data-center power requests in batches by submission order. No MW or queue position is stated in the county record; the campus is reported elsewhere at 600–900 MW.

Key data: "In the queue" pre-batch-system; MW n.a. in county record

Status date: 2025-08-12

Limitation: No Dominion or PJM queue identifier disclosed.

Open source →

Sources

Evidence and provenance

  • Caroline County, Virginia · VERIFIED PRIMARY
    Limitation: No lat-long published in the statement
  • CleanArc Data Centers · VERIFIED PRIMARY
    Limitation: No interconnection agreement or SCC case number published for VA-1 specifically
  • Compute Atlas · CORROBORATED
    Limitation: Substation names, water/sewer trunk mains, rail and fiber not itemized
  • Virginia DEQ · VERIFIED PRIMARY
    Limitation: New (-1) registration in a county with little prior data-center footprint; no capacity stated.
  • Caroline County, VA · VERIFIED PRIMARY
    Limitation: No Dominion or PJM queue identifier disclosed.

Open VA state research →