under_construction
Cost range, acreage and building count vary between sources; the roughly 706-acre and roughly 220-acre figures appear to describe the full county footprint versus an assembled sub-set of parcels. Behind-the-meter gas generation means the campus is not primarily a CPS Energy load.
Key data: NOT_FOUND (project is planned around behind-the-meter generation rather than a utility interconnection) | ERCOT | NOT_FOUND | NOT_FOUND
Claim classification: Not yet assigned
Status date: 2026-09-05