Source-backed project record · TX

Connect: Temple 2 Data Center

This record consolidates 13 research observations while retaining source distinctions, location precision and unresolved fields.

under_constructionproject status
SOURCE_BACKEDbest evidence tier
13linked evidence rows
Project facts

Location and operating record

Operator / developerConnect Data Centers (Oppidan subsidiary)
JurisdictionTemple, TX
Address2325 Eberhardt Road
Location precisionstreet address
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesConnect: Temple 2 Data Center · Connect: Temple campus (Eberhardt Road) · Connect Temple 2 · Oppidan Temple building 2
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

Connect: Temple 2 Data Center: source record

under_construction

Second, larger Oppidan/Connect building on the same Eberhardt Road campus. Only Tier-3 directory data was located for this building; no TDLR record, MW figure, cost or tenant was confirmed. Could be a phase of the same campus rather than a separate facility.

Key data: Oncor (per Baxtel) | ERCOT | NOT_FOUND | NOT_FOUND

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Connect: Temple 2 Data Center: ownership and profile

under_construction

Developer: Oppidan Investment Company | Owner: Oppidan | County: Bell | Research region: Temple-Killeen-Waco / Bryan-College Station / Texoma

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Connect: Temple 2 Data Center: power and grid

under_construction

Key data: Utility: Oncor (per Baxtel) | Utility region: Oncor / ERCOT North-Central | Grid area: ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Connect: Temple 2 Data Center: water and cooling

under_construction

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Connect: Temple 2 Data Center: permits and jurisdiction

under_construction

Key data: Jurisdictions: State of Texas | Bell County | City of Temple | ERCOT / Oncor service territory

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

Connect: Temple 2 Data Center: environment and site

under_construction

Key data: Surrounding infrastructure: 0.07 miles from Oppidan's first 61,554 sq ft Temple building

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

under_construction

Key data: Surrounding infrastructure: ~1.13 miles from the Meta Temple campus

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Connect: Temple 2 Data Center: timeline

under_construction

Listed as under construction / planned, multi-phase

Claim classification: Not yet assigned

Status date: 2026

Open source 1 →

under_construction

Targeted operational date

Claim classification: Not yet assigned

Status date: 2027-04

Open source 1 →

BUILDING SQFT

Connect: Temple 2 Data Center: building sqft

under_construction

A second Oppidan building of 172,380 sq ft on 17 acres is listed as under construction with an April 2027 operational target.

Key data: 172,380 sq ft; 17 acres; April 2027

Claim classification: REPORTED_FACT · Verification: SINGLE_TERTIARY_SOURCE · Retrieved: 2026-09-05

Status date: 2027-04

Limitation: Directory listing only; no primary permit or company confirmation located.

Open source 1 →

EXACT LOCATION

Connect: Temple 2 Data Center: exact location

under_construction

The listing places Connect: Temple 2 at 2325 Eberhardt Rd, 0.07 miles from Oppidan's first Temple building.

Key data: 2325 Eberhardt Rd

Claim classification: REPORTED_FACT · Verification: SINGLE_TERTIARY_SOURCE · Retrieved: 2026-09-05

Status date: 2026-09-05

Open source 1 →

DEVELOPER

Connect: Temple 2 Data Center: developer

under_construction

Connect: Temple 2 is listed as an Oppidan project under Oppidan's Connect Data Centers subsidiary, served by Oncor, on a 17-acre site with an expected operational date of April 2027.

Key data: Developer Oppidan / Connect Data Centers; 17 acres; Oncor; April 2027

Claim classification: REPORTED_FACT · Verification: SINGLE_SOURCE_AGGREGATOR · Retrieved: 2026-09-05

Limitation: Aggregator listing; the second building does not appear under a separately confirmed TDLR registration fetched this session.

Open source 1 →

PROJECT STATUS

Connect: Temple 2 Data Center: project status

under_construction

The listing shows Connect: Temple 2 as a multi-phase project simultaneously flagged 'Under Construction' and 'Planned', with a 2027 planned year, immediately adjacent (0.07 miles) to Oppidan's 61,554 sq ft first Temple building.

Key data: Status listed as Under Construction / Planned; year planned 2027

Claim classification: REPORTED_FACT · Verification: SINGLE_SOURCE_AGGREGATOR · Retrieved: 2026-09-05

Limitation: Conflicting status labels within the same source; treat construction start as unconfirmed.

Open source 1 →

Sources

Evidence and provenance

Open TX state research →

Connect: Temple 2 Data Center Data Center Project | Temple | Compute Equity Atlas