Core Scientific Pecos Data Center Campus (Cottonwood 1 and 2)

This record consolidates 3 research observations while retaining source distinctions, location precision and unresolved fields.

operationalproject status
VERIFIED_PRIMARYbest evidence tier
3linked evidence rows
Project facts

Location and operating record

Operator / developerCore Scientific, Inc.
JurisdictionPecos, TX
Address1939 Farm to Market 2119, Reeves County, TX
Location precisionstreet address
CoordinatesNot published; no coordinate inferred
Capacity1500 MW
AliasesCore Scientific Pecos Data Center Campus (Cottonwood 1 and 2) · Cottonwood 1 / Cottonwood 2
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

Core Scientific Pecos Data Center Campus (Cottonwood 1 and 2): source record

operational

Crypto-to-AI conversion in progress: 300 MW currently mining, 300 MW incremental contracted, with AI hosting targeted for early 2027. The site traces back to US Bitcoin Corp (U.S. Data Lone Star, Inc.) before the Core Scientific combination, which is why two separate Comptroller registrations exist for the same Pecos location.

Key data: Grid-supplied today; pursuing behind-the-meter power for expansion | ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05