operationalproject status
VERIFIED_PRIMARYbest evidence tier
18linked evidence rows
Project facts

Location and operating record

Operator / developerCore Scientific, Inc.
JurisdictionPecos, TX
Address1939 Farm to Market 2119, Reeves County, TX
Location precisionstreet address
CoordinatesNot published; no coordinate inferred
Capacity1500 MW
AliasesCore Scientific Pecos Data Center Campus (Cottonwood 1 and 2) · Cottonwood 1 / Cottonwood 2 · Cottonwood Data Center · USBTC Pecos Data Center · Core Scientific Pecos
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

Core Scientific Pecos Data Center Campus (Cottonwood 1 and 2): source record

operational

Crypto-to-AI conversion in progress: 300 MW currently mining, 300 MW incremental contracted, with AI hosting targeted for early 2027. The site traces back to US Bitcoin Corp (U.S. Data Lone Star, Inc.) before the Core Scientific combination, which is why two separate Comptroller registrations exist for the same Pecos location.

Key data: Grid-supplied today; pursuing behind-the-meter power for expansion | ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Core Scientific Pecos Data Center Campus (Cottonwood 1 and 2): ownership and profile

operational

Developer: Core Scientific, Inc. | Owner: Core Scientific, Inc. | Property entity: U.S. Data Lone Star, Inc. (earlier registry entry for the Pecos site) | County: Reeves | Research region: Abilene-West Central Texas / Midland-Odessa-Permian Basin | Tenants/customers: CoreWeave is a Core Scientific tenant across Texas, Georgia, Oklahoma and North Carolina; not specifically confirmed at Pecos

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Core Scientific Pecos Data Center Campus (Cottonwood 1 and 2): power and grid

operational

Key data: Utility: Grid-supplied today; pursuing behind-the-meter power for expansion | Utility region: ERCOT West | Grid area: ERCOT | Gross MW: 1500 | IT load MW: 1000 | Requested load MW: 600 | Substations: On-site substation

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Core Scientific Pecos Data Center Campus (Cottonwood 1 and 2): water and cooling

operational

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Core Scientific Pecos Data Center Campus (Cottonwood 1 and 2): permits and jurisdiction

operational

Key data: Jurisdictions: Reeves County | Texas Comptroller of Public Accounts | ERCOT | Tax incentives: [object Object],[object Object] | {"agreement_name":"Texas Comptroller Qualifying Data Center Project registration - USBTC Pecos Data Center","agreement_number":"DC062205-OW1 / DC062205-OC1 / DC062205-OP1","approval_date":"2022-04-01","estimated_value":"State sales-and-use tax exemption","government_entity":"Texas Comptroller of Public Accounts","investment_commitment":"NOT_FOUND","jobs_commitment":"NOT_FOUND","source_url":"https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php","term":"NOT_FOUND"} | {"agreement_name":"Texas Comptroller Qualifying Large Data Center Project registration - Cottonwood Data Center","agreement_number":"LD291044-OW1 / LD291044-OC1 / LD291044-OP1","approval_date":"2025-09-12","estimated_value":"State sales-and-use tax exemption","government_entity":"Texas Comptroller of Public Accounts","investment_commitment":"NOT_FOUND","jobs_commitment":"NOT_FOUND","source_url":"https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php","term":"NOT_FOUND"}

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

Core Scientific Pecos Data Center Campus (Cottonwood 1 and 2): environment and site

operational

Pursuing behind-the-meter generation for expansion capacity

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

operational

Key data: Surrounding infrastructure: On-site substation

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

operational

Key data: Surrounding infrastructure: FM 2119 corridor

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Core Scientific Pecos Data Center Campus (Cottonwood 1 and 2): timeline

operational

USBTC Pecos Data Center registered with the Texas Comptroller under U.S. Data Lone Star, Inc.

Claim classification: Not yet assigned

Status date: 2022-04-01

Open source 1 →

operational

Pecos campus launched

Claim classification: Not yet assigned

Status date: 2022

Open source 1 →

operational

Cottonwood Data Center registered as a Qualifying Large Data Center Project under Core Scientific Inc.

Claim classification: Not yet assigned

Status date: 2025-09-12

Open source 1 →

operational

Core Scientific secures 300 MW of incremental contracted capacity on top of 300 MW of current mining capacity; plans 1.5 GW gross / 1 GW leasable and reserves 200+ acres for behind-the-meter expansion

Claim classification: Not yet assigned

Status date: 2026-07-14

Open source 1 →

operational

AI hosting targeted to go live

Claim classification: Not yet assigned

Status date: 2027 early (target)

Open source 1 →

STREET ADDRESS

Core Scientific Pecos Data Center Campus (Cottonwood 1 and 2): street address

operational

Core Scientific's Pecos campus, comprising Cottonwood 1 and 2, is located at 1939 Farm to Market 2119 in Reeves County and launched in 2022.

Key data: 1939 Farm to Market 2119, Reeves County

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-07-14

Open source 1 →

CAPACITY GROSS POWER

Core Scientific Pecos Data Center Campus (Cottonwood 1 and 2): capacity gross power

operational

The campus has 300 MW of current mining capacity plus 300 MW of incremental contracted capacity, with plans for 1.5 GW gross and 1 GW leasable and more than 200 acres reserved for behind-the-meter expansion.

Key data: 300 MW current + 300 MW contracted; 1.5 GW gross / 1 GW leasable planned

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-07-14

Open source 1 →

PROJECT TIMELINE

Core Scientific Pecos Data Center Campus (Cottonwood 1 and 2): project timeline

operational

Core Scientific targets AI hosting going live at the Pecos campus in early 2027, supported by an on-site substation.

Key data: AI hosting live early 2027; on-site substation

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-07-14

Open source 1 →

OWNERSHIP CHAIN

Core Scientific Pecos Data Center Campus (Cottonwood 1 and 2): ownership chain

operational

The Comptroller registry contains both a 2022 entry for 'USBTC Pecos Data Center' under U.S. Data Lone Star, Inc. and a 2025 entry for 'Cottonwood Data Center' under Core Scientific Inc., reflecting the site's origin with US Bitcoin Corp.

Key data: DC062205 (2022-04-01) and LD291044 (2025-09-12)

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2025-09-12

Open source 1 →

TENANT CUSTOMER

Core Scientific Pecos Data Center Campus (Cottonwood 1 and 2): tenant customer

operational

CoreWeave is described as a Core Scientific tenant across Texas, Georgia, Oklahoma and North Carolina, but is not specifically confirmed at the Pecos campus.

Key data: CoreWeave tenancy portfolio-wide, not Pecos-specific

Claim classification: INFERENCE · Verification: UNVERIFIED · Retrieved: 2026-09-05

Status date: 2026-07-14

Limitation: Do not attribute CoreWeave tenancy to Pecos without further evidence.

Open source 1 →