announced
Distinct from the Oracle/OpenAI Stargate campus; Crusoe states total Abilene site capacity reaches ~2.1 GW combined. Two buildings at 336 MW critical IT each.
Key data: Behind-the-meter dedicated on-site power plant | ERCOT
Claim classification: Not yet assigned
Status date: 2026-09-05