Crusoe Nolan County Data Center Campus

This record consolidates 16 research observations while retaining source distinctions, location precision and unresolved fields.

approved_or_permittedproject status
CORROBORATEDbest evidence tier
16linked evidence rows
Project facts

Location and operating record

Operator / developerCrusoe Energy Systems LLC
JurisdictionNOT_FOUND (southern Nolan County, near Sweetwater), TX
AddressNot published
Location precisionlocality centroid
Coordinates31.793092, -94.180287
Capacity200 MW
AliasesCrusoe Nolan County Data Center Campus · Southern Nolan County site · $7 billion Nolan County data center
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure2 rows
SOURCE RECORD

Crusoe Nolan County Data Center Campus: source record

approved

Cost figures conflict between the two local outlets ($7B vs $70M); the $7B figure appears in the abatement approval coverage and the $70M figure in a headline four days later. Flagged as CONFLICTING on PROJECT_COST.

Key data: Self-supplied - Crusoe provides its own electricity | ERCOT | On-site wells (metered)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Crusoe Nolan County Data Center Campus: ownership and profile

approved

Developer: Crusoe Energy Systems LLC | Permit applicant: Crusoe Energy Systems LLC (tax abatement applicant) | County: Nolan | Research region: Abilene-West Central Texas / Midland-Odessa-Permian Basin

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Crusoe Nolan County Data Center Campus: power and grid

approved

Key data: Utility: Self-supplied - Crusoe provides its own electricity | Utility region: ERCOT West | Grid area: ERCOT | Gross MW: 200

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Crusoe Nolan County Data Center Campus: water and cooling

approved

Key data: Water utility: On-site wells (metered) | Water source: Groundwater wells with aquifer-drawdown penalties | Water demand: Restricted by agreement: water meters on wells and penalties tied to aquifer levels

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Crusoe Nolan County Data Center Campus: permits and jurisdiction

approved

Key data: Jurisdictions: Nolan County Commissioners Court | ERCOT | Tax incentives: [object Object] | {"agreement_name":"Nolan County 10-year tax abatement for Crusoe data center","agreement_number":"NOT_FOUND","approval_date":"2026-04-13","estimated_value":"More than $3 million per year in payments in lieu of taxes plus more than $2 million per year in charitable contributions","government_entity":"Nolan County","investment_commitment":"$7 billion","jobs_commitment":"~40 permanent jobs","source_url":"https://ktxs.com/news/local/it-will-change-our-rural-town-tax-abatement-for-7-billion-texas-data-center-approved","term":"10 years"}

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

CIVIC AND COMMUNITY

Crusoe Nolan County Data Center Campus: civic and community

approved

Resident concern reported: 'It will change our rural town'

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

approved

Payments to Sweetwater of roughly $2.2 million per year reported

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

Crusoe Nolan County Data Center Campus: environment and site

approved

Water use restrictions with well metering and aquifer penalties

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

approved

Self-supplied generation rather than grid draw

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Crusoe Nolan County Data Center Campus: timeline

approved

Nolan County approves 10-year tax abatement for $7 billion, 200 MW Crusoe data center

Claim classification: Not yet assigned

Status date: 2026-04-13

Open source 1 →

approved

Follow-up reporting: ~2,000 construction jobs, ~40 permanent, construction to start early May, ~$3M/yr taxes plus $2.2M for Sweetwater

Claim classification: Not yet assigned

Status date: 2026-04-16

Open source 1 →

TAX INCENTIVES

Crusoe Nolan County Data Center Campus: tax incentives

approved

Nolan County approved a 10-year tax abatement for a $7 billion, 200 MW Crusoe data center, with more than $3 million per year in payments in lieu of taxes and more than $2 million per year in charitable contributions.

Key data: 10-year abatement; $7B; 200 MW; >$3M/yr PILOT

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-04-13

Open source 1 →

WATER DEMAND

Crusoe Nolan County Data Center Campus: water demand

approved

The abatement agreement requires water meters on wells and imposes penalties tied to aquifer drawdown; Crusoe will supply its own electricity rather than drawing from the grid.

Key data: Well metering plus aquifer drawdown penalties; self-supplied power

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-04-13

Open source 1 →

JOBS

Crusoe Nolan County Data Center Campus: jobs

approved

Follow-up reporting places the project in southern Nolan County with roughly 2,000 construction workers and about 40 permanent jobs, construction starting in early May, and roughly $3 million per year in taxes plus $2.2 million for Sweetwater.

Key data: ~2,000 construction; ~40 permanent; construction starts early May 2026

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-04-16

Open source 1 →

PROJECT COST

Crusoe Nolan County Data Center Campus: project cost

approved

Two local outlets report materially different capital figures for the same project four days apart: $7 billion in the abatement approval coverage and $70 million in a follow-up headline.

Key data: $7 billion vs $70 million

Claim classification: CONFLICTING · Verification: CONFLICTING · Retrieved: 2026-09-05

Status date: 2026-04-16

Limitation: Unresolved two-order-of-magnitude discrepancy between local sources.

Open source 1 →

COMMUNITY RESPONSE

Crusoe Nolan County Data Center Campus: community response

approved

Local coverage led with a resident reaction to the approval, headlined 'It will change our rural town'.

Key data: Resident quote: 'It will change our rural town'

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-04-13

Open source 1 →

Sources

Evidence and provenance

Open TX state research →

Crusoe Nolan County Data Center Campus Data Center Project | NOT_FOUND (southern Nolan County, near Sweetwater) | Compute Equity Atlas