Compute Equity Atlas
← National map
Source-backed project record · TX

CyrusOne Austin Campus (MetCenter) — AUS2 / AUS3 and buildings 17, 17B, 17C

This record consolidates 10 research observations while retaining source distinctions, location precision and unresolved fields.

operationalproject status
SOURCE_BACKEDbest evidence tier
10linked evidence rows
Project facts

Location and operating record

Operator / developerCyrusOne LLC
JurisdictionAustin, TX
Address7301 Metropolis Drive (AUS2) and 7100 Metropolis Drive (AUS3)
Location precisionstreet address
CoordinatesNot published; no coordinate inferred
Capacity100 MW
AliasesCyrusOne Austin Campus (MetCenter) — AUS2 / AUS3 and buildings 17, 17B, 17C · MetCenter Business Park data center campus · CyrusOne AUS2 · CyrusOne AUS3 · Austin Met Center data centers
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure1 rows
SOURCE RECORD

CyrusOne Austin Campus (MetCenter) — AUS2 / AUS3 and buildings 17, 17B, 17C: source record

operational

AUS2 is 9 MW / 70,000 sq ft; AUS3 is 120,000 sq ft of colocation with up to 24 MW at full build-out. The ~100 MW / 100-acre / 460,000 sq ft figures are campus-level tracker aggregates.

Key data: Austin Energy | ERCOT South Central / Austin-Central Texas load zone | City of Austin Water | NOT_FOUND

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

CyrusOne Austin Campus (MetCenter) — AUS2 / AUS3 and buildings 17, 17B, 17C: ownership and profile

operational

Developer: CyrusOne LLC | Owner: CyrusOne LLC | County: Travis | Research region: Austin / Central Texas | Tenants/customers: Multi-tenant colocation (tenants not disclosed)

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

CyrusOne Austin Campus (MetCenter) — AUS2 / AUS3 and buildings 17, 17B, 17C: power and grid

operational

Key data: Utility: Austin Energy | Utility region: ERCOT | Grid area: ERCOT South Central / Austin-Central Texas load zone | Gross MW: 100

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

CyrusOne Austin Campus (MetCenter) — AUS2 / AUS3 and buildings 17, 17B, 17C: water and cooling

operational

Key data: Water utility: City of Austin Water | Water source: City of Austin Water | Water demand: Not disclosed; tracker benchmark estimate 900,000-1,300,000 gal/day (estimate) | Cooling: Evaporative cooling towers

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

CyrusOne Austin Campus (MetCenter) — AUS2 / AUS3 and buildings 17, 17B, 17C: permits and jurisdiction

operational

Key data: Jurisdictions: City of Austin | Travis County | Austin Energy | Austin Water | ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

CIVIC AND COMMUNITY

CyrusOne Austin Campus (MetCenter) — AUS2 / AUS3 and buildings 17, 17B, 17C: civic and community

operational

Expansion proceeds through routine development permitting without a discrete public review process, per tracker community notes

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

CyrusOne Austin Campus (MetCenter) — AUS2 / AUS3 and buildings 17, 17B, 17C: environment and site

operational

Evaporative cooling towers draw on City of Austin Water supply

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

CyrusOne Austin Campus (MetCenter) — AUS2 / AUS3 and buildings 17, 17B, 17C: timeline

operational

CyrusOne acquires 22 acres at Austin MetCenter for data center expansion

Claim classification: Not yet assigned

Status date: 2014-01-07

Open source 1 →

operational

CyrusOne acquires ~175,000 sq ft powered shell at 7100 Metropolis Drive to establish AUS3 (Phase 1 60,000 sq ft / 6 MW; full build-out 120,000 sq ft / up to 24 MW)

Claim classification: Not yet assigned

Status date: 2015-04-02

Open source 1 →

operational

Expansion buildings 17, 17B and 17C announced with initial fit-outs targeted Oct 2026 and Aug 2027

Claim classification: Not yet assigned

Status date: 2025-01-01

Open source 1 →

Sources

Evidence and provenance

Open TX state research →

CyrusOne Austin Campus (MetCenter) — AUS2 / AUS3 and buildings 17, 17B, 17C Data Center Project | Austin | Compute Equity Atlas