CyrusOne SAT 8 & 9

This record consolidates 9 research observations while retaining source distinctions, location precision and unresolved fields.

approved_or_permittedproject status
VERIFIED_PRIMARYbest evidence tier
9linked evidence rows
Project facts

Location and operating record

Operator / developerCyrusOne
JurisdictionSan Antonio, TX
Address14815 Omicron Drive
Location precisionstreet address
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesCyrusOne SAT 8 & 9 · NOT_FOUND · SAT8 · SAT9
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

CyrusOne SAT 8 & 9: source record

permitted

The $15M TDLR estimated cost is far below the per-square-foot values in comparable CyrusOne filings and likely covers a limited scope of work.

Key data: CPS Energy | ERCOT | NOT_FOUND | NOT_FOUND

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

CyrusOne SAT 8 & 9: ownership and profile

permitted

Developer: CyrusOne | Owner: CyrusOne | Permit applicant: CyrusOne | County: Bexar | Research region: San Antonio

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

CyrusOne SAT 8 & 9: power and grid

permitted

Key data: Utility: CPS Energy | Grid area: ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

CyrusOne SAT 8 & 9: water and cooling

permitted

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

CyrusOne SAT 8 & 9: permits and jurisdiction

permitted

Key data: Permit IDs: TABS2024005161 | Jurisdictions: City of San Antonio | Bexar County | State of Texas (TDLR) | ERCOT | CPS Energy

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

CyrusOne SAT 8 & 9: timeline

permitted

CyrusOne SAT 8 & 9 permit registered (279,730 sq ft two-story; start 4/1/2024, completion 12/31/2025); status Project Registered

Claim classification: Not yet assigned

Status date: 2024-04-01

Open source 1 →

STREET ADDRESS

CyrusOne SAT 8 & 9: street address

permitted

TDLR permit records the address and size for CyrusOne SAT 8 & 9.

Key data: 14815 Omicron Drive, San Antonio, TX 78245; 279,730 sq ft

Claim classification: direct_from_primary_permit_record · Verification: verified · Retrieved: 2026-09-05

Status date: 2024-04-01

Open source 1 →

PROJECT STATUS

CyrusOne SAT 8 & 9: project status

permitted

TDLR shows the project in registered status with a stated completion date.

Key data: Project Registered; completion 12/31/2025

Claim classification: direct_from_primary_permit_record · Verification: verified · Retrieved: 2026-09-05

Status date: 2024-04-01

Limitation: TDLR status reflects plan-review workflow, not construction progress.

Open source 1 →

CAPACITY IT LOAD

CyrusOne SAT 8 & 9: capacity it load

permitted

Aggregator lists a proposed load for CyrusOne SAT8 and SAT9.

Key data: CyrusOne, LLC [SAT8 and SAT9], 33 MW, Proposed

Claim classification: aggregated_third_party_record · Verification: unverified · Retrieved: 2026-09-05

Status date: 2024-04-01

Limitation: Grid-operator attribution on this source is inconsistent with CPS Energy territory.

Open source 1 →