Evidence record
Operator identifies its current Columbus colocation facility, customer services and staffed operations at this address. Future sold or committed power and utility capacity are not measured operating IT load.
Claim classification: Not yet assigned · Verification: first_party_verified · Retrieved: 2026-10-29
Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.