Amazon (AWS) New Carlisle Campus
New Carlisle town · IN
Documented capacity: 2250 MW
5 linked evidence rows · locality centroid; exact site unresolved
Open project evidence record →Start with the state view and mapped project locations, then move into permits, planning, civic context, operators and source evidence. Verified locations use source-supported coordinates; qualified research candidates may also appear at explicitly labeled Census locality/county centroids without claiming a precise site coordinate.
Source-exact records use supported coordinates. Dashed rings mark Census address-range geocodes, not rooftop or surveyed coordinates. Qualified research candidates are shown separately at Census locality or county centroids when that is the strongest source-backed geography; those markers do not claim a precise site coordinate.
This project layer combines available project-profile, permit/intent and civic-impact evidence. Records retain unresolved location precision and limitations rather than inventing coordinates.
New Carlisle town · IN
Documented capacity: 2250 MW
5 linked evidence rows · locality centroid; exact site unresolved
Open project evidence record →Lake County (Hobart) · IN
Operator / developer: Amazon Web Services
Documented capacity: 500 MW
Address: 4751 E 61st Ave
11 linked evidence rows · coordinate not inferred
Open project evidence record →St. Joseph County (New Carlisle) · IN
Operator / developer: Amazon Data Services, Inc.
Address: 870 acres and a 640-acre tract south of State Road 2.
5 linked evidence rows · coordinate not inferred
Open project evidence record →St. Joseph County · IN
Operator / developer: Amazon Web Services (operator); Anthropic (exclusive workload)
Documented capacity: 2200 MW
9 linked evidence rows · coordinate not inferred
Open project evidence record →Clay County (near Brazil / Carbon) · IN
Address: 62 acres off East County Road 1350 North just south of Carbon, with Brazil listed as the mailing city.
2 linked evidence rows · coordinate not inferred
Open project evidence record →Clay County · IN
Documented capacity: 400 MW
8 linked evidence rows · coordinate not inferred
Open project evidence record →Fort Wayne city · IN
Documented capacity: 527 MW
5 linked evidence rows · locality centroid; exact site unresolved
Open project evidence record →Lebanon · IN
Documented capacity: 1000 MW
20 linked evidence rows · locality centroid; exact site unresolved
Marion County · IN
Operator / developer: Metrobloks (IND A1); 72–75 MW
Documented capacity: 75 MW
12 linked evidence rows · coordinate not inferred
Open project evidence record →Marion County (Indianapolis, Martindale-Brightwood) · IN
Address: 2505 N. Sherman Drive, Indianapolis
1 linked evidence rows · coordinate not inferred
Open project evidence record →La Porte city · IN
5 linked evidence rows · locality centroid; exact site unresolved
Open project evidence record →Indianapolis · IN
Operator / developer: Netrality Data Centers
Address: 701 West Henry Street, Indianapolis, IN
1 linked evidence rows · Census address-range interpolation; not rooftop coordinates
Open project evidence record →Indianapolis · IN
Operator / developer: Netrality Data Centers
Address: 733 West Henry Street, Indianapolis, IN
1 linked evidence rows · Census address-range interpolation; not rooftop coordinates
Open project evidence record →Marion County · IN
Operator / developer: Sabey Data Centers (operator); colocation, tenants unnamed
Documented capacity: 250 MW
12 linked evidence rows · coordinate not inferred
Open project evidence record →Marion County (Indianapolis, Decatur Twp) · IN
1 linked evidence rows · coordinate not inferred
South Bend · IN
Operator / developer: 1547 Critical Systems Realty
Address: 506 W South St, South Bend, IN 46601
2 linked evidence rows · Census address-range interpolation; not rooftop coordinates
Open project evidence record →Indianapolis · IN
Operator / developer: US Signal
Address: 6325 Morenci Trail, Indianapolis, IN 46268
2 linked evidence rows · coordinate not inferred
Open project evidence record →West Lafayette · IN
28 linked evidence rows · locality centroid; exact site unresolved
Morgan County (Mooresville/Monrovia) · IN
1 linked evidence rows · coordinate not inferred
Morgan County · IN
Operator / developer: Operator not disclosed (developer Google)
9 linked evidence rows · coordinate not inferred
Open project evidence record →These records have current source support but remain outside canonical facility counts and map markers until their remaining identity or geography gates are complete.
Operator / developer: DC BLOX
Published / supplied location: Thunderbird Commerce Center, Indianapolis, IN
DC BLOX currently publishes its proposed Indianapolis site at Thunderbird Commerce Center. The project is in evaluation, permitting and public engagement and is described as two phases: an approximately 70,000-square-foot first building and an approximately 250,000-square-foot second building. It is not treated as operating.
Evidence: FIRST PARTY CURRENT PROJECT
These dated decisions, filings, research collections and supporting-infrastructure records provide context. They are not additional data-center facilities.
La Porte city, Indiana · Director
Contact about: Could you point us to current city land-use maps, public development-review packets and published development or abatement reporting records, with source dates?
Source status: historical indexed or mixed. Verify the linked public source before relying on an assignment because staff and routing can change.
This record is a regional research collection or market overview. It is not an individual data-center facility.
Read reference context →Contact about: Community education, evidence limits and public decision pathways.
This route was retained from current or recently revalidated public-source evidence.
11 source-backed contact records are available for planning, zoning, permitting, public comments, economic development, project questions and related infrastructure issues. Verify the linked source before relying on a contact because assignments can change.
Indiana Daily Student
Relevant to: Woodland Caribou LLC data center · Morgan County
The county plan director is named in investigative reporting, which also documents that she signed an NDA with the project's design consultant.
Contact details: Laura Parker, Morgan County Plan Director (signed NDA with Anchor Designs LLC)
Limitation: No direct phone/email published in fetched sources.
Indiana Daily Student
Relevant to: Woodland Caribou LLC data center · Morgan County
Morgan County Economic Development Corporation is the involved agency, with its executive director named.
Contact details: Mike Dellinger, Executive Director, Morgan County EDC
Limitation: No email/phone published.
IDEM
Relevant to: Woodland Caribou LLC data center · Morgan County
IDEM publishes a named permit contact for the air permit, which is the only general point of contact identified.
Contact details: Omar El-Rjoob, IDEM Office of Air Quality — (317) 232-4971 / (800) 451-6027, oelrjoob@idem.IN.gov
Limitation: No company-side community-relations contact found.
St. Joseph County / stjoepros.org directory
Relevant to: Amazon Data Services New Carlisle · St. Joseph County
Planning authority for unincorporated county land and the Town of New Carlisle rests with the St. Joseph County Area Plan Commission, whose staff directory is published.
Contact details: Area Plan Commission, 227 W. Jefferson Blvd, 11th Fl., South Bend, IN 46601; 574-235-7800; Executive Director Shawn Klein, AICP; planners Faryal Sharif, Adi'a Smith
Limitation: No case-specific case manager for the Amazon campus published; staff emails not listed.
Inside Indiana Business
Relevant to: Amazon Data Services New Carlisle · St. Joseph County
The St. Joseph County Office of Economic Development leads locally with the IEDC at state level; the county's executive director of economic development is named in coverage.
Contact details: Bill Schalliol, Executive Director of Economic Development, St. Joseph County; IEDC
Limitation: No email/phone published in fetched sources.
Inside Indiana Business
Relevant to: Amazon Data Services New Carlisle · St. Joseph County
The utility's community affairs manager is the named public-facing contact identified in coverage; IDEM notices provide the state permit channel.
Contact details: Mona Livingston, Community Affairs Manager, Indiana Michigan Power
Limitation: No phone/email published; no Amazon community-relations contact found.
City of Hobart, IN
Relevant to: Amazon / Hobart data centers · Lake County (Hobart)
Authority rests with the Hobart Plan Commission; the city's published directory gives the Planning & Zoning Department phone but no named case manager for this project.
Contact details: City of Hobart Planning & Zoning / Plan Commission, 414 Main St., Hobart, IN 46342 — 219-942-7985
Limitation: No named planner or email published for the data-center cases.
City of Hobart, IN
Relevant to: Amazon / Hobart data centers · Lake County (Hobart)
The city publishes an Economic Development phone line in its staff directory; no named individual tied to the Amazon project was found.
Contact details: City of Hobart Economic Development — 219-942-5517
Limitation: No county-level (Lake County) EDC contact found for this project.
IndyStar
Relevant to: Sabey Decatur Technology Park · Marion County
The MDC hearing examiner who recommended approval is named, as are counsel for both sides.
Contact details: Judy Weerts Hall, MDC Hearing Examiner; Mindy Westrick Brown (Sabey counsel); Laureen White (residents' counsel)
Limitation: No department phone/email captured for the case file.
Daily Journal (IBJ content)
Relevant to: Sabey Decatur Technology Park · Marion County
Indy Economic Development Inc. (with prior Indy Chamber endorsement) backs the project and is working with Sabey on a tax abatement; a spokesperson and attorney are named in coverage.
Contact details: Indy Economic Development Inc.; spokesperson Aliya Wishner; attorney Doug Brown
Limitation: Roles/titles partially garbled in source text; no direct contact details.
Sabey (project website)
Relevant to: Sabey Decatur Technology Park · Marion County
The project website states a dedicated community liaison exists for inquiries, but no name, phone or email was published on the fetched page.
Contact details: Community liaison referenced, unnamed
Limitation: NOT_FOUND for an actual phone/email; legal notices are posted separately as PDFs.
6 source-backed evidence rows are available on this page.
Morgan County / Mooresville (Monroe Township)
Developer / operator: Woodland Caribou LLC
Status: "Notice of 30-Day Period for Public Comment"; "Preliminary Findings"; proposed permit "would allow Woodland Caribou LLC to construct and operate a new stationary data center if approved by IDEM's Office of Air Quality"
Permit / docket: Part 70 Operating Permit No. T109-50085-00094
Record type: New Source Construction and Part 70 Operating Permit
Claim classification: Not yet assigned · Retrieved 2026-08-29
VERIFIED PRIMARYLimitation: Local reporting links this Monroe Township site to Google; the IDEM notice names only Woodland Caribou LLC, so operator is reported exactly as filed. No MW/sq ft in the notice.
St. Joseph County
Developer / operator: Amazon Data Services, Inc.
Status: "NPDES Draft Permit Public Notice"; public comment open
Permit / docket: Permit No. 141-50312-00650
Record type: NPDES Draft Permit (wastewater discharge)
Claim classification: Not yet assigned · Retrieved 2026-08-29
VERIFIED PRIMARYLimitation: The IDEM listing does not use the phrase "data center" for this entry; facility name and county are as listed.
Lake County / Hobart
Developer / operator: Amazon Data Services (application prepared by Ramboll)
Status: IDEM lists the permit as "Initial Processing"; "No draft or issued permit is shown"
Permit / docket: IDEM Permit 089-50590-00739
Record type: New Source Minor PSD/Emission Offset construction approval and FESOP (air permit application)
Capacity / size: 782 diesel generators totaling 2,119 MW; ~5.47 million gallons of listed tank capacity
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Could not reach the IDEM permit-status record itself this session (CAATS/permit-status search is an interactive portal). Generator/MW figures are from the republished application, not an issued permit.
Marion County / Indianapolis (Decatur Township)
Developer / operator: Sabey Data Center Properties, LLC (rep. Mindy Westrick Brown)
Status: Legal notice of public hearing before the Metropolitan Development Commission; site plan and elevations "filed December 29, 2025"; proposed data center technology park use stated as "not permitted" under the ordinance
Permit / docket: 2025-CAP-856 / 2025-CVR-856 (Amended); modifies commitments from 2020-CZN-834
Record type: Modification of Commitments plus Variance of Use and Development Standards (Consolidated Zoning and Subdivision Ordinance)
Capacity / size: Building heights 30 ft (A) and 50 ft (B), variance sought for >50 ft up to 75 ft; 200 parking spaces requested; acreage not stated in the notice
Claim classification: Not yet assigned · Retrieved 2026-08-29
VERIFIED PRIMARYLimitation: Notice is the petitioner-hosted copy of the MDC legal notice. Later approval (reported March 2026) and the resident lawsuit were not confirmed from a court or MDC record in this session.
Marion County / Indianapolis (Center Township)
Developer / operator: Metrobloks, LLC
Status: "For Public Hearing"; "recommend approval of ten (10) years real property tax abatement" and "fifteen (15) years enhanced personal property tax abatement"; "request will be made to continue to August 19, 2026"
Permit / docket: 2026-A-016 (real property) and 2026-A-017 (enhanced personal property); related rezoning petitions 2025-ZON-124 / 2025-VAR-012
Record type: Final Economic Revitalization Area Resolution (tax abatement); rezoning of 13.68 acres I-2 → C-S
Capacity / size: 13.68 acres (rezoning petition); MW not stated
Claim classification: Not yet assigned · Retrieved 2026-08-29
VERIFIED PRIMARYLimitation: Rezoning case numbers 2025-ZON-124 / 2025-VAR-012 and the 13.68-acre figure appear in MDC hearing-examiner agenda search results, not in the August 5 agenda I fetched; the abatement resolutions are verified from the fetched agenda.
Clay County / near Brazil (south of Carbon)
Developer / operator: Blue Power LLC
Status: IDEM "granted an air permit to Blue Power LLC for a power generation project" (per local reporting); permitted-sources listing shows issued 2025-09-24, expiring 2030-09-24
Permit / docket: 18-021-00020 (source ID 48829), Title V ("TV")
Record type: Air permit (Title V), listed "Operating"
Claim classification: Not yet assigned · Retrieved 2026-08-29
DISCOVERY LEADLimitation: The permit ID, dates and address were read from the search-index snippet of the IDEM permitted-sources spreadsheet; I did not successfully open the spreadsheet itself this session, and the data-center connection is asserted by local reporting, not by the permit record.
34 source-backed evidence rows are available on this page.
Marion County (Indianapolis — Martindale Brightwood)
The Metrobloks site is the former Sherman Drive-In in Martindale Brightwood, a historically Black east-side Indianapolis neighborhood, and the EJ framing of the incentive debate turns on siting a ~$500 million, ~14-acre data center in that community.
Key data: Site: 2505 N. Sherman Drive, historically Black Martindale Brightwood; ~14 acres; ~$500M project
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Qualitative EJ characterization; no tract percentile or index score located
Statewide
Searched for EJScreen percentiles or an Indiana state EJ mapping equivalent for Mooresville/Morgan County, New Carlisle/St. Joseph County, Hobart/Lake County, Decatur Township, Martindale Brightwood and Clay County. EPA EJScreen is offline as of February 5, 2025, and no Indiana state EJ screening tool with published tract percentiles was located.
Key data: No Indiana state EJ screening tool with percentile outputs identified
Claim classification: Not yet assigned · Retrieved 2026-08-29
DISCOVERY LEADLimitation: IDEM does not publish an EJScreen-equivalent percentile tool that was retrievable this session
St. Joseph County (New Carlisle)
The St. Joseph County Drainage Board approved construction-site dewatering discharge of up to 31 million gallons per day into the Niespodziany Ditch from the southwest corner of the property, reduced from Amazon's requested 35 MGD. Monitoring devices will track ditch water levels and the board can suspend dewatering. Neighboring farmers pushed back over planting-season impacts; Amazon issued a "letter of commitment" to engage in good faith on landowner concerns.
Key data: 31 MGD dewatering discharge approved (35 MGD requested)
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: This is construction dewatering discharge, not operational cooling withdrawal; article gives no calendar date
St. Joseph County (New Carlisle)
The Section 401 Water Quality Certificate for the New Carlisle campus covers impacts to 9.7 acres of wetlands and over 5,000 feet of streams in the Kankakee River watershed, adjacent to Bendix Woods Nature Preserve. Comment deadline was April 30, 2025.
Key data: 9.7 acres wetlands; >5,000 feet of streams impacted
Claim classification: Not yet assigned · Retrieved 2026-08-29
DISCOVERY LEADLimitation: Advocacy summary of an IDEM notice; certificate number not stated (notice filename references 2025-78-71-enh-wqc)
Morgan County (Monrovia / Mooresville)
Documents in a pending IURC case indicate the campus is expected to use roughly 4 million gallons per day — about three times the electricity and four times the water of a comparable proposed Franklin Township project. One report attributes the ~4 MGD figure to per-building maximum capacity.
Key data: ~4 million gallons/day expected water use
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Sources disagree on whether 4 MGD is campus-wide or per building; at the October 2025 plan commission hearing the developer provided no water-use volume, source or wastewater figure
Marion County (Decatur Township)
Reporting on the project records a 1 million gallon groundwater startup fill plus 200,000–300,000 gallons per year of routine use, consistent with the closed-loop cooling design Sabey advertises.
Key data: 1M gal startup fill; 200,000–300,000 gal/yr routine
Claim classification: Not yet assigned · Retrieved 2026-08-29
DISCOVERY LEADLimitation: Advocacy source; company-side confirmation limited to a general closed-loop claim on the project website
Statewide
The IURC issued its large-load order in Cause 46097 on February 19, 2025, setting a 70 MW individual threshold (150 MW aggregate). Parties included I&M, the OUCC, Citizens Action Coalition, Amazon Data Services, Google, Microsoft and the Data Center Coalition.
Key data: 70 MW individual / 150 MW aggregate threshold; order dated 2025-02-19
Claim classification: Not yet assigned · Retrieved 2026-08-29
VERIFIED PRIMARYLimitation: Applies to I&M service territory; Hobart (NIPSCO) and Indianapolis (AES Indiana) loads sit outside this tariff
Northern Indiana (Lake / LaPorte / Michigan City)
NIPSCO received Commission approval for NIPSCO GenCo as a public utility to serve large loads, isolating large-customer risk contractually, with roughly 3 GW of capacity to be added. Listed projects include AWS and Google in northern Indiana, Google Michigan City (300 MW) and Microsoft LaPorte (538 MW).
Key data: ~3 GW to be added via NIPSCO GenCo; Cause 46183
Claim classification: Not yet assigned · Retrieved 2026-08-29
VERIFIED PRIMARYLimitation: Industry-association compilation; individual docket orders not fetched
Morgan County
EEI records the AES Indiana / Google Morgan Township data center at 390 MW, with the agreement expected to deliver $770 million in savings to existing customers over 15 years. A planned 1,200 MW substation is documented for the site, and at 90% capacity annual consumption would approach twice the 2024 usage of all AES Indiana residential customers combined.
Key data: 390 MW contracted (EEI); 1,200 MW planned substation; ~2x all AES Indiana residential usage at 90% capacity
Claim classification: Not yet assigned · Retrieved 2026-08-29
VERIFIED PRIMARYLimitation: 390 MW (contract) and 1,200 MW (substation) are different measures and should not be conflated
Marion County (Decatur Township)
Seven Decatur Township residents, represented by attorney Arie J. Lipinski, sued in Marion County Superior Court to block the project, arguing the Metropolitan Development Commission's March 2026 approval of a variance of use rather than a rezoning amounted to illegal variances and a "disguised rezoning." Sabey filed a motion to dismiss on June 15, with a status conference on June 29.
Key data: 7 plaintiffs; Marion County Superior Court; motion to dismiss filed 2026-06-15
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Case number not stated in fetched sources
Lake County (Hobart)
Four residents — Angelita Soriano, Albina Venegas-Roman, Barbara Koteles and Joseph Conn — sued the Hobart Plan Commission and Common Council on December 8, 2025 in Lake Superior Court (case 45D11-2512-MI-000644) over the rezoning of roughly 700 acres from R-3 to M-1 (155 acres of it in 2022). A preliminary-injunction motion followed on February 5, 2026 concerning a November 6, 2025 fill permit.
Key data: Case 45D11-2512-MI-000644 filed 2025-12-08; ~700 acres rezoned R-3 → M-1
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Docket status after February 2026 not confirmed
Marion County (Martindale Brightwood)
The MDC hearing on the $56 million incentive package was postponed from August 5 to August 19, 2026 at the city's request so community commitments could be finalized. Residents said the company's commitments would not be enough to make an impact. The city's own Department of Metropolitan Development director, Megan Vukusich, opposed the package on July 15.
Key data: Hearing moved 2026-08-05 → 2026-08-19; DMD director opposed the package
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Final vote outcome not stated in any fetched source
Morgan County
Terri Moore and another nearby property owner sued in March 2025 seeking judicial review of the February 2025 rezoning of 390.74 acres; a second resident (Dill) filed suit that was consolidated with Moore's in January of the following year, and litigation remained ongoing. Roughly 200 people attended the October 2025 plan commission meeting; more than 250 attended a February 2025 town hall.
Key data: Consolidated rezoning litigation ongoing; ~200 attendees Oct 2025, >250 Feb 2025
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Case numbers and court not stated; student-newsroom investigation
Clay County (near Brazil / Carbon)
IDEM granted an air permit for power generation south of Carbon without notifying county officials. Because Clay County has no zoning, it cannot impose a moratorium. Residents raised air and noise concerns at two meetings on July 6, 2026 and were exploring a referendum.
Key data: County officials not notified; no county zoning, so no moratorium possible
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Permit number not stated; planned capacity (~400 MW) sourced only from an aggregator
Lake County (Hobart)
Under the NIPSCO GenCo structure, cost savings for existing customers are projected at $1.25 billion, roughly $90–$115 annually per residential customer, with large-customer risk isolated contractually.
Key data: Projected $1.25B savings; ~$90–$115/yr per residential customer
Claim classification: Not yet assigned · Retrieved 2026-08-29
VERIFIED PRIMARYLimitation: Utility-side projection compiled by an industry association; no consumer-advocate counter-analysis fetched
Marion County (Decatur Township)
The project website states existing customer rates are not expected to be negatively impacted under AES's plan and the IURC-reviewed process, and that closed-loop cooling minimizes water use. Separately, intervenor comments in AES Indiana's 2025 IRP urged the utility to run a rate analysis assuming a separate data center rate class.
Key data: Developer claim of no negative rate impact; IRP comments seek separate data center rate class
Claim classification: Not yet assigned · Retrieved 2026-08-29
VERIFIED PRIMARYLimitation: Developer claim is unverified; the IRP comment document is redacted
Statewide
The Indiana Office of Utility Consumer Counselor records that NIPSCO's electric rate case establishes a sub-docket to address issues related to new large or mega load customers, including data centers.
Key data: Sub-docket established for large/mega load customers including data centers
Claim classification: Not yet assigned · Retrieved 2026-08-29
VERIFIED PRIMARYLimitation: Sub-docket number and outcome not captured
Morgan County (Monrovia)
Approximately 550–560 acres of farmland were rezoned to Planned Unit Development in two steps: 390.74 acres approved 3-0 by the Morgan County Commissioners in February 2025, then 158 additional acres in the 1500 block of West Keller Hill Road, Monroe Township, recommended 5-2 by the Plan Commission and approved in October 2025. The land was previously farmland, houses, wetlands, streams and woodlots; petitioners were HDC Real Estate LLC and Woodland Caribou LLC (a Delaware shell company), represented by Barnes & Thornburg.
Key data: 390.74 ac (Feb 2025, 3-0) + 158 ac (Oct 2025, 5-2 recommendation) = ~550 acres of farmland converted
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Total acreage reported as 500, 550 and 560 across sources
Lake County (Hobart)
Roughly 700–723 acres were converted, with 155 acres rezoned from R-3 residential to M-1 in 2022 and the balance later; Hobart Resolution 2026-01 declared an approximately 723-acre project area an Economic Revitalization Area on January 7, 2026.
Key data: ~700 acres rezoned R-3 → M-1; ~723-acre ERA designated 2026-01-07
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Prior land use (residential vs agricultural) not specified in fetched sources
Marion County (Martindale Brightwood)
This is infill redevelopment rather than farmland conversion: the ~14-acre site is the former Sherman Drive-In theater in an established urban neighborhood.
Key data: ~14 acres, former Sherman Drive-In (urban infill)
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Included to distinguish infill from greenfield conversion
Marion County
The SU-47 data center zoning proposal (PROP26-238) requires rezoning into a Medium Industrial (I-3) base district plus an operations plan, annual reporting and a public dashboard — but the presentation materials state that no decommissioning requirements are included.
Key data: SU-47: no decommissioning requirement stated
Claim classification: Not yet assigned · Retrieved 2026-08-29
VERIFIED PRIMARYLimitation: Explicit negative finding from a primary city document
Statewide
Searched Hobart's resolutions 2026-01 through 2026-04, the Morgan County PUD conditions, the Marion County SU-47 proposal and the Clay County situation for decommissioning plans, bonding or site-restoration requirements. None were found; Marion County's own SU-47 materials confirm no decommissioning requirement, Morgan County's PUD conditions cover height, coverage and noise only, and Clay County has no zoning at all.
Key data: No decommissioning or financial-assurance requirement found for any IN anchor project
Claim classification: Not yet assigned · Retrieved 2026-08-29
VERIFIED PRIMARYLimitation: Full text of Hobart's community enhancement agreement not retrieved; a decommissioning clause could exist there
Lake County (Hobart)
On January 7–8, 2026 the Hobart Common Council voted 6-0 on three resolutions granting a 10-year, 100% real property tax abatement per eligible building and a 35-year, 100% enterprise IT equipment exemption, on an $11 billion project at 61st Avenue and Colorado Street. The package schedules $175 million in community enhancement contributions: $47 million upfront (due by January 31, outside the levy and outside any TIF district), then $45M, $43M and $40M at construction milestones, $10 million after the first building permit, and up to $2 million per building per year. Statement of Benefits projects 400+ permanent Amazon jobs at $37.44/hour. The mayor projected $102 million in city payments in 2026, $43M in 2027, $40M in 2028 and roughly $50M/yr after buildout. Public hearing ran two hours with only three speakers in favor.
Key data: 10-yr/100% real property abatement + 35-yr/100% IT equipment exemption; $175M community enhancement schedule; $47M upfront; 400+ jobs at $37.44/hr
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Abatement values are foregone-revenue commitments, not realized; mayor's out-year figures are projections. Sources differ on whether resolutions were adopted Jan 7 or Jan 8, 2026
Statewide
Qualifying investments under $750 million may receive up to 25 years of Indiana gross retail and use tax exemption; investments over $750 million may receive up to 50 years. Local governments may separately grant an enterprise IT equipment exemption.
Key data: Up to 25 years (<$750M) or 50 years (>$750M) of state sales/use tax exemption
Claim classification: Not yet assigned · Retrieved 2026-08-29
DISCOVERY LEADLimitation: Secondary compilation of statute; Indiana Code text not fetched directly
Marion County (Martindale Brightwood)
Indianapolis Economic Development Inc. proposed a nearly $56 million package: $13.5 million in real property abatement over 10 years plus a $42 million equipment abatement (90% over 15 years) on roughly $406 million of equipment. A future tenant could save up to $339 million. The project is estimated to generate about $10 million per year in property tax, with a $2.5 million community pledge that could rise to $20 million.
Key data: $56M package ($13.5M real property/10 yr + $42M equipment at 90%/15 yr); ~$10M/yr projected property tax; up to $339M tenant savings
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Vote outcome unconfirmed; the $10M/yr revenue figure is a proponent projection
Marion County (Decatur Township)
The project is reported at $4 billion (one source says $2 billion) on a 130-acre, ~1 million sq ft campus near Kentucky Avenue and Camby Road. Its dockets are 2025-CAP-856 / 2025-CVR-856.
Key data: $4B investment; 130 acres; ~1M sq ft
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Investment figure inconsistent between sources ($2B vs $4B); no abatement dollar value located
Morgan County
The May 2025 development agreement provides that Google would pay no local taxes on qualified computing equipment for 40 years, on a $1 billion planned investment. Morgan County also adopted Economic Revitalization Area resolutions on May 27, 2025.
Key data: Zero local tax on qualified computing equipment for 40 years
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Agreement text not fetched; 40-year term reported by journalists
Marion County
The SU-47 proposal would cap data center noise at 55 decibels and require a 400-foot setback from all residential districts, schools and churches, plus landscaping and screening, an operations plan, annual reporting and a public dashboard.
Key data: 55 dB noise cap; 400-ft setback from protected districts
Claim classification: Not yet assigned · Retrieved 2026-08-29
VERIFIED PRIMARYLimitation: Measurement point for the 55 dB limit not specified in the presentation
Morgan County (Monrovia)
The PUD rezoning caps noise at 65 decibels at the property line — compared in reporting to the level of a business office — limits primary buildings to 75 feet and caps hard-surface lot coverage at three-quarters.
Key data: 65 dB at property line; 75-ft height cap; 75% hard-surface coverage cap
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: PUD ordinance text not fetched directly
Lake County (Hobart)
The Hobart Board of Works approved a traffic plan for the data center site on August 6, 2026. The community enhancement agreement also records commitments covering acoustics, roadway work, fire training and construction mitigation.
Key data: Traffic plan approved 2026-08-06; agreement includes acoustics and roadway commitments
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Plan contents, trip counts and decibel commitments not published in fetched sources
Lake County (Hobart)
Amazon's IDEM air application, filed July 24, 2026 by Ramboll and running roughly 190 pages, covers two facilities (4751 E 61st Ave and 6197 Colorado St) with 26 buildings, 782 generators totaling 2,119 MW, 808 tanks and more than 5.46 million gallons of diesel.
Key data: 782 generators / 2,119 MW; 808 tanks; >5.46M gallons diesel across 26 buildings
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Application under review; no cumulative-impact analysis by IDEM located
Marion County
Responding to four data center proposals in a single year (Google, Metrobloks, Sabey, DC Blox), the Metropolitan Development Commission voted 6-0 in August 2026 to bar new data centers in Marion County until at least December 31, 2027, after the City-County Council voted 23-1 to advance the measure. A committee of experts and residents will study campus size, building height, environmental impacts and sound levels; Mayor Hogsett proposed $150,000 for it in the 2027 budget. Already-approved DC Blox, Metrobloks and Sabey projects are exempt, protected by state law.
Key data: Moratorium adopted 6-0; runs through at least 2027-12-31; three approved projects exempt
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Exact enactment date not stated ("Wednesday" in August 2026)
St. Joseph County (New Carlisle)
IDEM opened a 30-day comment period on a significant modification to Amazon's Part 70 operating permit at 31100 State Road 2, New Carlisle, adding two new generators and modifying existing ones, with possible Title I changes to synthetic minor emission limits. The underlying permit was issued May 1, 2025.
Key data: SPM 141-50312-00650; 2 new generators added; base permit issued 2025-05-01
Claim classification: Not yet assigned · Retrieved 2026-08-29
VERIFIED PRIMARYLimitation: Notice document is dated after the retrieval date in its filename (20260916), suggesting a forward-dated posting; generator capacities and emission limits are not in the notice
Statewide
Hoosier Action called for a statewide moratorium on data center construction, aggregating water, land and grid concerns across projects.
Key data: Statewide moratorium demanded
Claim classification: Not yet assigned · Retrieved 2026-08-29
DISCOVERY LEADLimitation: Advocacy position, not a policy in force
58 source-backed evidence rows are available on this page.
Morgan County (Mooresville/Monrovia)
IDEM's air permit notices give the facility street address; local notices describe the rezoned area bounded by Keller Hill Road, Antioch Road and State Road 42, with an initial 390.74-acre tract and ~550 acres total.
Key data: 1598 W SR 42, Mooresville, IN 46158 (Morgan County); ~391 acres initial, ~550 acres total
Claim classification: Not yet assigned · Retrieved 2026-08-29
VERIFIED PRIMARYLimitation: No parcel/APN numbers published in fetched notices.
Morgan County
Investigative reporting identifies Woodland Caribou LLC as a Delaware-formed Google shell that bought 15 properties between Sept. 10 and Nov. 14, 2025 for nearly $78 million; Google publicly confirmed itself as developer.
Key data: Woodland Caribou LLC (Delaware) = Google; 15 properties, ~$78M
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: No Secretary of State filing or deed instrument numbers retrieved this session.
Morgan County
Local reporting states the operating company had not been disclosed publicly at the time of the tax-abatement approvals; Google has since been identified as developer.
Key data: Operator not disclosed (developer Google)
Claim classification: Not yet assigned · Retrieved 2026-08-29
DISCOVERY LEADLimitation: Operator/tenant identity remains formally undisclosed in permit record.
Morgan County
AES Indiana will provide electric service, with a planned on-site substation; AES estimated $737.3 million to power the project, and 166 diesel backup generators are proposed in the air application.
Key data: AES Indiana; planned substation; 166 backup gensets
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: No IURC cause number or special-contract ID found for this load in fetched sources.
Morgan County
No named water utility was found; reporting states each building could use ~4 million gallons/day at maximum capacity, and the air application includes an on-site wastewater treatment plant, lift stations and booster pumps with backup generators.
Key data: ~4 MGD per building (max); on-site WWTP, lift stations, booster pumps
Claim classification: Not yet assigned · Retrieved 2026-08-29
DISCOVERY LEADLimitation: Water supplier/agreement not disclosed in fetched sources (NOT_FOUND for supplier name).
Morgan County
Morgan County Commissioners approved rezonings and the County Council handled tax abatement; the site is in Monroe Township; IDEM Office of Air Quality issues the Part 70 permit; the Indiana Economic Development Corp. approved state incentives.
Key data: Morgan County Commissioners & County Council; Monroe Township; IDEM OAQ (Part 70 No. 109-50085-00094); IEDC
Claim classification: Not yet assigned · Retrieved 2026-08-29
VERIFIED PRIMARYLimitation: n.a.
Morgan County
The county plan director is named in investigative reporting, which also documents that she signed an NDA with the project's design consultant.
Key data: Laura Parker, Morgan County Plan Director (signed NDA with Anchor Designs LLC)
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: No direct phone/email published in fetched sources.
Morgan County
Morgan County Economic Development Corporation is the involved agency, with its executive director named.
Key data: Mike Dellinger, Executive Director, Morgan County EDC
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: No email/phone published.
Morgan County
IDEM publishes a named permit contact for the air permit, which is the only general point of contact identified.
Key data: Omar El-Rjoob, IDEM Office of Air Quality — (317) 232-4971 / (800) 451-6027, oelrjoob@idem.IN.gov
Claim classification: Not yet assigned · Retrieved 2026-08-29
VERIFIED PRIMARYLimitation: No company-side community-relations contact found.
Morgan County
Site fronts State Road 42 with West Keller Hill Road, Union Church Road and Antioch Road bounding it; project includes 36 cooling towers, a planned substation, WWTP, lift stations and booster pumps; an IDEM 401 notice ties "Project Louie" wetlands work to SR 42.
Key data: SR 42; Keller Hill Rd; Antioch Rd; planned substation; 36 cooling towers
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Transmission voltage, fiber and rail access not documented.
St. Joseph County (New Carlisle)
The campus is ~1,200 acres in the Indiana Enterprise Center near New Carlisle in Olive Township, with local documentation citing Huckleberry Road and Gordon Road; incentive filings reference three parcels totaling 870 acres and a 640-acre tract south of State Road 2.
Key data: Huckleberry Rd & Gordon Rd, New Carlisle (Olive Township); ~1,200 acres campus; 870-acre incentive parcels
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Acreage varies by phase (600, 640, 870, 1,200); no parcel IDs verified.
St. Joseph County
Amazon assembled more than 600 acres of farmland around New Carlisle in 2023 through the shell entity "Razor5" and owns the land and buildings in an ~$11 billion self-build.
Key data: Shell buyer "Razor5" → Amazon Data Services; Amazon owns land + 32 buildings
Claim classification: Not yet assigned · Retrieved 2026-08-29
DISCOVERY LEADLimitation: Shell-entity claim is tracker/analyst-sourced; no deed or Secretary of State record fetched.
St. Joseph County
AWS operates the campus (branded Project Rainier); the complex exclusively trains and runs Anthropic models.
Key data: Amazon Web Services (operator); Anthropic (exclusive workload)
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: n.a.
St. Joseph County
Indiana Michigan Power (AEP subsidiary) serves the campus, expected to draw more than 2.2 GW; AEP is building the Larrison Drive and New Prairie 345 kV delivery substations for ~1.1 GW of initial service by December 2026, with an I&M interconnection station authorization of $68 million.
Key data: Indiana Michigan Power (AEP); 2.2+ GW; Larrison Drive & New Prairie 345 kV substations; $68M interconnection station
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: No IURC cause number for the I&M large-load contract confirmed in fetched sources.
St. Joseph County
The Town of New Carlisle supplies water from two plants (~16 MGD firm, up to 18 MGD) drawing a shallow unconfined aquifer near the Kankakee headwaters; St. Joseph County adopted a voluntary 24 MGD cap for the Indiana Enterprise Center, with both major projects expected to stay under 21 MGD. Groundwater withdrawal for dewatering was approved at an additional 31 MGD for 546 days.
Key data: Town of New Carlisle water utility; ~16–18 MGD firm capacity; county 24 MGD voluntary cap; 31 MGD dewatering approval
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: No numbered water service agreement located; dewatering permit ID not captured.
St. Joseph County
Authorities include the Town of New Carlisle, Olive Township, St. Joseph County (Board of Commissioners, County Council, Redevelopment Commission, Drainage Board), the Indiana Enterprise Center overlay, IDEM, IURC and IDNR; the state IEDC provides incentives.
Key data: Town of New Carlisle; Olive Twp; St. Joseph County Redevelopment Commission/Council/Commissioners; Drainage Board; IDEM; IURC; IDNR; IEDC
Claim classification: Not yet assigned · Retrieved 2026-08-29
VERIFIED PRIMARYLimitation: n.a.
St. Joseph County
Planning authority for unincorporated county land and the Town of New Carlisle rests with the St. Joseph County Area Plan Commission, whose staff directory is published.
Key data: Area Plan Commission, 227 W. Jefferson Blvd, 11th Fl., South Bend, IN 46601; 574-235-7800; Executive Director Shawn Klein, AICP; planners Faryal Sharif, Adi'a Smith
Claim classification: Not yet assigned · Retrieved 2026-08-29
VERIFIED PRIMARYLimitation: No case-specific case manager for the Amazon campus published; staff emails not listed.
St. Joseph County
The St. Joseph County Office of Economic Development leads locally with the IEDC at state level; the county's executive director of economic development is named in coverage.
Key data: Bill Schalliol, Executive Director of Economic Development, St. Joseph County; IEDC
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: No email/phone published in fetched sources.
St. Joseph County
The utility's community affairs manager is the named public-facing contact identified in coverage; IDEM notices provide the state permit channel.
Key data: Mona Livingston, Community Affairs Manager, Indiana Michigan Power
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: No phone/email published; no Amazon community-relations contact found.
St. Joseph County
The campus sits ~0.7 mi from 345 kV transmission and ~1 mi from the Kankakee River, drains via Niespodziany Ditch, adjoins the GM/Samsung SDI battery plant and Bendix Woods County Park, and is bounded by SR 2, US 20, Willow/Walnut and Smilax/Snowberry Roads.
Key data: 345 kV line ~0.7 mi; Niespodziany Ditch; SR 2 / US 20; GM-Samsung battery plant adjacent
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Tracker-derived distances; fiber routes not documented.
Lake County (Hobart)
The campus is at the intersection of 61st Avenue and Colorado Street in Hobart: a 168-acre "Hobart Data Center Campus" lot plus a second "Hobart Tech Park" plan south of 61st Avenue and east of Colorado Street, totaling more than 725–750 acres.
Key data: 61st Ave & Colorado St, Hobart, IN 46342; tracker address 4751 E 61st Ave; 168-acre first lot, ~725 acres total
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Street address (4751 E 61st Ave) comes from a tracker, not a permit; no parcel IDs verified.
Lake County (Hobart)
Zoning and site plans moved through Hobart Devco, LLC; project documents and trackers identify Hobart Owner LLC as the campus entity with Amazon Data Services as the air-permit applicant.
Key data: Hobart Devco, LLC (developer/rezoning); Hobart Owner LLC (campus entity); Amazon Data Services (air applicant)
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Registered-agent/parent filings for Hobart Devco and Hobart Owner LLC not retrieved; attorney Todd Leeth represents Hobart Devco.
Lake County (Hobart)
AWS is the announced operator/end user of the campus, tied to a $15 billion Amazon investment in Hobart.
Key data: Amazon Web Services
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Tracker-sourced investment figure.
Lake County (Hobart)
NIPSCO will supply the campus, ramping to 2,400 MW by end-2032 with service starting 2027; IURC Cause No. 46322 approved the NIPSCO–Amazon special contract and a NIPSCO–GenCo PPA, and MISO Project 51141 covers a 1,500 MW "New Hobart Load Addition."
Key data: NIPSCO; IURC Cause No. 46322; MISO Project 51141; 2,400 MW by 2032
Claim classification: Not yet assigned · Retrieved 2026-08-29
VERIFIED PRIMARYLimitation: Repository is a community-maintained aggregation of primary filings; docket numbers not independently re-fetched from IURC/MISO this session.
Lake County (Hobart)
NOT_FOUND for a named water utility. The developer told the plan commission the buildings "would not need water"; a tracker estimates ~14 million gallons/year for water-based cooling.
Key data: No supplier named; ~14 M gal/yr (tracker estimate)
Claim classification: Not yet assigned · Retrieved 2026-08-29
DISCOVERY LEADLimitation: City of Hobart utilities role not documented in fetched sources.
Lake County (Hobart)
The City of Hobart controls zoning (Plan Commission, City Council, Board of Public Works and Safety); state/federal authorities include IURC, MISO, IDEM and USACE; the site is in Lake County.
Key data: City of Hobart (Plan Commission, Council, BPW); IURC; MISO; IDEM; USACE
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: n.a.
Lake County (Hobart)
Authority rests with the Hobart Plan Commission; the city's published directory gives the Planning & Zoning Department phone but no named case manager for this project.
Key data: City of Hobart Planning & Zoning / Plan Commission, 414 Main St., Hobart, IN 46342 — 219-942-7985
Claim classification: Not yet assigned · Retrieved 2026-08-29
VERIFIED PRIMARYLimitation: No named planner or email published for the data-center cases.
Lake County (Hobart)
The city publishes an Economic Development phone line in its staff directory; no named individual tied to the Amazon project was found.
Key data: City of Hobart Economic Development — 219-942-5517
Claim classification: Not yet assigned · Retrieved 2026-08-29
VERIFIED PRIMARYLimitation: No county-level (Lake County) EDC contact found for this project.
Lake County (Hobart)
NOT_FOUND for a project-specific PIO or company community-relations contact; the general city permitting numbers are the only channels identified (Building 219-942-1722, Zoning 219-942-7985).
Key data: City of Hobart Building Dept. 219-942-1722
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Amazon side contact not published in fetched sources.
Lake County (Hobart)
Records reference a New Hobart 345 kV load addition and related transmission/generation, gas-fired generation and battery storage; a tracker puts the nearest 345 kV line ~0.7 mi away and Sprout Ditch ~0.9 mi; the Hobart Board of Works adopted a construction traffic plan.
Key data: New Hobart 345 kV load addition; 345 kV line ~0.7 mi; Sprout Ditch
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Water/sewer trunk lines and fiber routes not documented.
Marion County (Indianapolis, Decatur Twp)
The ~130-acre site is at the northeast corner/intersection of Kentucky Avenue (SR-67) and Camby Road in Decatur Township, inside the existing industrially zoned Decatur Technology Park, directly across from an AES substation.
Key data: Kentucky Ave (SR-67) & Camby Road, Decatur Township, Indianapolis; ~130 acres
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: No street number or parcel ID published; project site plan uses access from SR-67 and Camby Road.
Marion County
The petitioner is Sabey Data Center Properties LLC, a division of Seattle-based Sabey Corporation; Sabey Data Centers is jointly owned by Sabey Corporation and institutional clients managed by National Real Estate Advisors (some accounts affiliated with the IBEW).
Key data: Sabey Data Center Properties LLC → Sabey Corporation + National Real Estate Advisors-managed clients
Claim classification: Not yet assigned · Retrieved 2026-08-29
VERIFIED PRIMARYLimitation: Land-title holder for the 130 acres not identified in fetched sources.
Marion County
Sabey designs, builds and operates its data centers; the Decatur facility is a colocation project intended to lease space to multiple tenants, with no tenant named.
Key data: Sabey Data Centers (operator); colocation, tenants unnamed
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: n.a.
Marion County
AES Indiana is the electric supplier; the plan includes a 10-acre on-site substation ramping to 250 MW over five years, with initial utility upgrades anticipated by Q4 2027 and Sabey funding transmission/distribution costs.
Key data: AES Indiana; 10-acre substation; 250 MW over 5 years
Claim classification: Not yet assigned · Retrieved 2026-08-29
VERIFIED PRIMARYLimitation: No IURC cause number or special contract ID published.
Marion County
The project website names Citizens Water as supplier, with a closed-loop design requiring a one-time 1,000,000-gallon fill (500,000 gal per building, 2028 and 2030) and 200,000–300,000 gallons/year ongoing.
Key data: Citizens Water (Citizens Energy Group); 1.0 M gal initial fill; 200–300k gal/yr
Claim classification: Not yet assigned · Retrieved 2026-08-29
VERIFIED PRIMARYLimitation: Developer-published figures; no service agreement number.
Marion County
Land-use authority is the consolidated City of Indianapolis/Marion County Metropolitan Development Commission (with hearing examiner) covering Decatur Township; IURC governs utility investment; litigation is pending in Marion Superior Court.
Key data: Metropolitan Development Commission (MDC) + hearing examiner; Decatur Township; IURC; Marion Superior Court
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: City-County Council did not vote on the variance.
Marion County
The MDC hearing examiner who recommended approval is named, as are counsel for both sides.
Key data: Judy Weerts Hall, MDC Hearing Examiner; Mindy Westrick Brown (Sabey counsel); Laureen White (residents' counsel)
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: No department phone/email captured for the case file.
Marion County
Indy Economic Development Inc. (with prior Indy Chamber endorsement) backs the project and is working with Sabey on a tax abatement; a spokesperson and attorney are named in coverage.
Key data: Indy Economic Development Inc.; spokesperson Aliya Wishner; attorney Doug Brown
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Roles/titles partially garbled in source text; no direct contact details.
Marion County
The project website states a dedicated community liaison exists for inquiries, but no name, phone or email was published on the fetched page.
Key data: Community liaison referenced, unnamed
Claim classification: Not yet assigned · Retrieved 2026-08-29
DISCOVERY LEADLimitation: NOT_FOUND for an actual phone/email; legal notices are posted separately as PDFs.
Marion County
An AES substation sits across the street, a 10-acre substation is planned on site, access is from SR-67/Kentucky Avenue and Camby Road with 200-foot residential buffers; nearest 345 kV line ~1.1 mi and Seerley Creek ~1.0 mi.
Key data: AES substation across street; 345 kV ~1.1 mi; Seerley Creek ~1.0 mi
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Fiber and sewer trunk detail not documented.
Marion County (Indianapolis, Martindale-Brightwood)
The site is the ~14-acre former Sherman Drive-In theater property in Martindale-Brightwood, vacant since 1983.
Key data: 2505 N. Sherman Drive, Indianapolis; ~13–14 acres
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: No parcel ID published; address sometimes given as "N. Sherman Ave."
Marion County
NOT_FOUND. Fetched trade coverage, trackers, local reporting and metrobloks.com (which returned no usable content) — no land owner, parent company or registered agent for Metrobloks' Indianapolis entity was published.
Key data: n.a. (developer Metrobloks; CEO named Ernest/Earnest Popescu)
Claim classification: Not yet assigned · Retrieved 2026-08-29
DISCOVERY LEADLimitation: Company website content not extractable; CEO name spelled inconsistently across sources.
Marion County
Metrobloks is described as both developer and operator of the metro-edge AI-ready facility (site code IND A1), 72–75 MW at buildout.
Key data: Metrobloks (IND A1); 72–75 MW
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: No tenant named.
Marion County
Public radio reporting states the facility would draw electricity through contracts with AES Indiana rather than from the residential grid.
Key data: AES Indiana (contracted supply)
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: No contract ID or IURC cause number published.
Marion County
A closed-loop cooling system is planned: ~19,000 gallons to fill the first building and ~47,500 gallons for the second, recirculated rather than consumed. No water utility is named.
Key data: ~19,000 gal (bldg 1) + ~47,500 gal (bldg 2), closed loop
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Supplier name NOT_FOUND (Citizens Energy Group not confirmed for this site).
Marion County
The Metropolitan Development Commission approved the rezoning (April/May 2026) and the City-County Council was engaged on the project and on a temporary stay for high-impact data centers; the site is in Indianapolis/Marion County.
Key data: MDC; Indianapolis City-County Council; Marion County
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Tax abatement cases 2026-A-016/017 were not directly fetched this session.
Marion County
NOT_FOUND for named staff. Coverage identifies the MDC as the deciding body and City-County Councilor Ron Gibson as the area representative, but no planner, case manager or economic-development officer was named for this project.
Key data: Councilor Ron Gibson (district representative)
Claim classification: Not yet assigned · Retrieved 2026-08-29
DISCOVERY LEADLimitation: Abatement petitions handled through Indianapolis DMD; staff not named in fetched sources.
Marion County
NOT_FOUND. The only project-side contact identified is the CEO by name; reporters noted Metrobloks did not respond to email inquiries and the corporate site returned no extractable contact information.
Key data: Metrobloks CEO Ernest Popescu (no phone/email published)
Claim classification: Not yet assigned · Retrieved 2026-08-29
DISCOVERY LEADLimitation: metrobloks.com and /about-us returned no content on fetch.
Marion County
The site is a decades-vacant brownfield at 25th Street and Sherman Drive; a company-aligned listing notes it is less than 4.7 miles from the FD-IX Internet Exchange Point with ~0.21 ms latency and carrier-neutral connectivity.
Key data: FD-IX Internet Exchange <4.7 mi; 25th St & Sherman Dr
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Substation/transmission and sewer detail not published.
Clay County (near Brazil / Carbon)
Permit documents show four adjoining plats totaling 27.62 acres off East County Road 1350 North just south of Carbon, with Brazil listed as the mailing city.
Key data: 4 plats, 27.62 acres, E. CR 1350 N, south of Carbon (Brazil, IN)
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Permit itself not fetched directly; no parcel IDs.
Clay County
Blue Power LLC owns the four adjoining plats and is the renamed successor of Claybridge Energy LLC, previously Midwest Gas Storage, Inc.; its CEO is Illinois-based Terry O'Malley.
Key data: Blue Power LLC (formerly Claybridge Energy LLC, formerly Midwest Gas Storage, Inc.); CEO Terry O'Malley
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Ultimate beneficial owner/parent above Blue Power LLC not identified; no Secretary of State filing fetched.
Clay County
NOT_FOUND. The data-center user is unidentified: Blue Power's IDEM permit covers a combined-cycle power plant that would provide dedicated power to a nearby data center, but no data-center operator has been disclosed.
Key data: Data center operator undisclosed
Claim classification: Not yet assigned · Retrieved 2026-08-29
DISCOVERY LEADLimitation: Project is disclosed only through the power-plant permit.
Clay County
Power would come from Blue Power's own behind-the-meter combined-cycle plant rather than a named utility; a tracker lists WVPA / Parke County REMC as grid context and 400 MW capacity.
Key data: Self-supply via Blue Power combined-cycle plant; tracker: WVPA/Parke County REMC, 400 MW
Claim classification: Not yet assigned · Retrieved 2026-08-29
DISCOVERY LEADLimitation: Utility attribution is tracker-sourced and unconfirmed; no interconnection/docket reference found.
Clay County
NOT_FOUND. Searched IDEM-related coverage and county meeting reporting; no water utility, well field or agreement has been disclosed for the Clay County project.
Key data: n.a.
Claim classification: Not yet assigned · Retrieved 2026-08-29
DISCOVERY LEADLimitation: n.a.
Clay County
IDEM's Office of Air Quality issued the significant source modification permit; Clay County Commissioners and County Council are the local bodies, but the county has no zoning laws and says it cannot impose a moratorium; IDNR was cited as another avenue for residents.
Key data: IDEM OAQ; Clay County Commissioners & Council (no county zoning); IDNR
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: The absence of county zoning is a key jurisdictional gap.
Clay County
NOT_FOUND (structurally): Clay County has no zoning ordinance, so no planning/zoning case authority exists. Permit paperwork listed local officials as notified contacts, with a reported email/phone mismatch.
Key data: Listed officials: Patricia Heffner (Brazil Council At-Large), Mayor Brian Wyndham, Commissioner Bryan Allender
Claim classification: Not yet assigned · Retrieved 2026-08-29
CORROBORATEDLimitation: Reporting notes the contact email/phone listed for one official actually belonged to a different person (Shane Litz).
Clay County
NOT_FOUND. Searched for a Clay County economic development contact and any company contact; only the CEO's name was published, and the county announcements page returned no relevant content.
Key data: n.a.
Claim classification: Not yet assigned · Retrieved 2026-08-29
DISCOVERY LEADLimitation: No EDC or PIO identified for this project.
Clay County
NOT_FOUND for detailed infrastructure. The only located context is the site's position south of Carbon off E. CR 1350 N on former gas-storage land (Midwest Gas Storage lineage), implying gas infrastructure.
Key data: E. CR 1350 N; former gas-storage site lineage
Claim classification: Not yet assigned · Retrieved 2026-08-29
DISCOVERY LEADLimitation: No substation, pipeline, water/sewer or fiber specifics published.
44 project/topic labels are retained here, including unresolved aliases that still need source-backed identity resolution.
| Project or topic | Evidence state |
|---|---|
| Amazon / Hobart air permit application | Source-backed / identity unresolved |
| Amazon / Hobart campus | Source-backed / identity unresolved |
| Amazon / Hobart data center campus | Source-backed / identity unresolved |
| Amazon / Hobart data centers | Source-backed / identity unresolved |
| Amazon / Hobart data centers (permit 089-50590-00739, 782 generators) | Source-backed / identity unresolved |
| Amazon / Hobart — incentives and payments | Source-backed / identity unresolved |
| Amazon / Hobart — ratepayer treatment | Source-backed / identity unresolved |
| Amazon / Hobart — traffic plan | Source-backed / identity unresolved |
| Amazon Data Services | Source-backed / identity unresolved |
| Amazon Data Services (NPDES/air permit 141-50312-00650) | Source-backed / identity unresolved |
| Amazon Data Services New Carlisle | Source-backed / identity unresolved |
| Amazon Data Services — Section 401 certification | Source-backed / identity unresolved |
| Amazon Data Services — air permit modification 141-50312-00650 | Source-backed / identity unresolved |
| Amazon Data Services, Inc. facility (New Carlisle area, per IDEM public-notice listing by county) | Source-backed / identity unresolved |
| Blue Power LLC | Source-backed / identity unresolved |
| Countywide data center moratorium | Source-backed / identity unresolved |
| Data center at 2505 North Sherman Drive, Council District #8 | Source-backed / identity unresolved |
| Decatur Technology Park data center — various addresses 6700–8210 Camby Rd & 6600–6833 Kentucky Ave; East Building A and West Building B | Source-backed / identity unresolved |
| IURC Cause No. 46097 — I&M large load tariff | Source-backed / identity unresolved |
| Indiana data center sales tax exemption | Source-backed / identity unresolved |
| Metrobloks | Source-backed / identity unresolved |
| Metrobloks (tax abatements 2026-A-016/017) | Source-backed / identity unresolved |
| Metrobloks abatements | Source-backed / identity unresolved |
| Metrobloks abatements 2026-A-016 / 017 | Source-backed / identity unresolved |
| NIPSCO GenCo, IURC Cause 46183 | Source-backed / identity unresolved |
| NIPSCO large-load sub-docket | Source-backed / identity unresolved |
| NOT_FOUND — DECOMMISSIONING_PROVISION for IN anchor projects | Source-backed / identity unresolved |
| NOT_FOUND — quantitative EJ screening for IN sites | Source-backed / identity unresolved |
| New stationary data center at 1598 W SR 42, Mooresville, IN 46158 (Woodland Caribou LLC) | Source-backed / identity unresolved |
| Power generation project associated with a potential data center development, 499 E CR 1350 N, Brazil, IN 47834 | Source-backed / identity unresolved |
| Project Louie (Google) | Source-backed / identity unresolved |
| Project Louie (Google) — AES Indiana agreement | Source-backed / identity unresolved |
| Project Louie (Google) — abatement | Source-backed / identity unresolved |
| Project Louie PUD conditions | Source-backed / identity unresolved |
| Proposed SU-47 noise and setback standards | Source-backed / identity unresolved |
| Proposed SU-47 special use district | Source-backed / identity unresolved |
| Sabey Decatur Technology Park | Source-backed / identity unresolved |
| Sabey Decatur Technology Park (2025-CAP-856 / 2025-CVR-856) | Source-backed / identity unresolved |
| Sabey — AES Indiana rate impact | Source-backed / identity unresolved |
| Statewide moratorium demand | Source-backed / identity unresolved |
| Two adjacent Hobart data center sites treated as one source (26 buildings) | Source-backed / identity unresolved |
| Woodland Caribou LLC / Project Louie (Google) | Source-backed / identity unresolved |
| Woodland Caribou LLC data center | Source-backed / identity unresolved |
| Woodland Caribou LLC data center (permit T109-50085-00094) | Source-backed / identity unresolved |
This state page combines mapped locations with permits, planning and zoning activity, infrastructure context, operators and civic records. This state research also includes 7 reviewed records from the national refresh. Counts describe evidence records, not unique facilities.
Where a source does not establish a location, utility, water supplier or other fact, that gap remains explicit rather than being converted into an unsupported map point or claim.