Data City Texas

This record consolidates 12 research observations while retaining source distinctions, location precision and unresolved fields.

proposed_or_reviewproject status
SOURCE_BACKEDbest evidence tier
12linked evidence rows
Project facts

Location and operating record

Operator / developerNOT_FOUND
JurisdictionNear Laredo, TX
AddressNOT_FOUND
Location precisionlocality centroid
CoordinatesNot published; no coordinate inferred
Capacity5000 MW
AliasesData City Texas · Data City Texas, Webb County (near Laredo) · Data City
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

Data City Texas: source record

announced

Developer-marketing claims only; no permits, county records or independent confirmation located this session. Treat capacity and acreage as promotional.

Key data: NOT_FOUND | Behind-the-meter; developer states no interconnection queue required | NOT_FOUND | NOT_FOUND

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Data City Texas: ownership and profile

announced

Developer: Energy Abundance Development Corporation | County: Webb | Research region: East Texas / South Texas-RGV / Statewide Rural Gap Pass

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Data City Texas: power and grid

announced

Key data: Grid area: Behind-the-meter; developer states no interconnection queue required | Gross MW: 5000 | Onsite generation MW: 5000

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Data City Texas: water and cooling

announced

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Data City Texas: permits and jurisdiction

announced

Key data: Jurisdictions: Webb County

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

Data City Texas: environment and site

announced

Key data: Surrounding infrastructure: On-site solar and wind generation planned

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

announced

Key data: Surrounding infrastructure: No ERCOT interconnection queue position claimed

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Data City Texas: timeline

announced

Energy Abundance Development Corporation markets Data City Texas: 50,000 contiguous acres, 5 GW behind-the-meter, first 300 MW in about 9 months and an additional 300 MW every 6 months

Claim classification: Not yet assigned

Status date: 2026

Open source 1 →

DEVELOPER

Data City Texas: developer

announced

Energy Abundance Development Corporation is marketing Data City Texas, a behind-the-meter compute campus near Laredo.

Key data: Developer: Energy Abundance Development Corporation

Claim classification: developer_claim · Verification: single_source · Retrieved: 2026-09-05

Limitation: No county or state filing located to corroborate.

Open source 1 →

CAMPUS ACRES

Data City Texas: campus acres

announced

The developer describes 50,000 contiguous acres of land control for the campus.

Key data: 50,000 contiguous acres

Claim classification: developer_claim · Verification: single_source · Retrieved: 2026-09-05

Limitation: Land control not verified in appraisal or deed records.

Open source 1 →

CAPACITY GROSS POWER

Data City Texas: capacity gross power

announced

The site is marketed at up to 5 GW of behind-the-meter capacity, with roughly 300 MW available in about nine months and a further 300 MW every six months thereafter.

Key data: Up to 5 GW BTM; 300 MW in ~9 months

Claim classification: developer_claim · Verification: single_source · Retrieved: 2026-09-05

Limitation: No ERCOT or PUCT record retrieved.

Open source 1 →

ONSITE GENERATION

Data City Texas: onsite generation

announced

Power is described as generated on site from solar and wind resources, avoiding the interconnection queue.

Key data: Onsite solar/wind, no interconnection queue

Claim classification: developer_claim · Verification: single_source · Retrieved: 2026-09-05

Limitation: Generation capacity in MW not disclosed.

Open source 1 →