Data Foundry Houston 2

This record consolidates 7 research observations while retaining source distinctions, location precision and unresolved fields.

operationalproject status
SOURCE_BACKEDbest evidence tier
7linked evidence rows
Project facts

Location and operating record

Operator / developerData Foundry
JurisdictionHouston, TX
Address660 Greens Parkway
Location precisionstreet address
CoordinatesNot published; no coordinate inferred
Capacity60 MW
AliasesData Foundry Houston 2 · Greens Parkway
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

Data Foundry Houston 2: source record

operational

Key data: ERCOT (Texas Interconnect) | ERCOT | NOT_FOUND

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Data Foundry Houston 2: ownership and profile

operational

Developer: Data Foundry | Owner: Data Foundry | County: Harris | Research region: Houston / Gulf Coast

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Data Foundry Houston 2: power and grid

operational

Key data: Utility: ERCOT (Texas Interconnect) | Utility region: ERCOT Houston (Coast) load zone | Grid area: ERCOT | Gross MW: 60

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Data Foundry Houston 2: water and cooling

operational

Key data: Cooling: Chilled water cooling

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Data Foundry Houston 2: permits and jurisdiction

operational

Key data: Jurisdictions: Harris County | City of Houston

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

CAPACITY GROSS POWER

Data Foundry Houston 2: capacity gross power

operational

Data Foundry describes its Houston 2 data center in north Houston on 18 acres as 60MW capable across 350,000 square feet with a chilled water cooling system.

Key data: 60MW capable; 350,000 sq ft; 18 acres

Claim classification: COMPANY_CLAIM · Verification: PRIMARY_SOURCE · Retrieved: 2026-09-05

Status date: 2026-09-05

Limitation: '60MW capable' is a design/build-out figure, not installed load.

Open source 1 →

ERCOT GRID AREA

Data Foundry Houston 2: ercot grid area

operational

Data Foundry emphasizes that the Houston 2 facility draws from the Texas Interconnect managed by ERCOT, independent of the Eastern and Western Interconnects, and offers carrier-neutral access to more than 14 network providers.

Key data: ERCOT Texas Interconnect; 14+ network providers

Claim classification: COMPANY_CLAIM · Verification: PRIMARY_SOURCE · Retrieved: 2026-09-05

Status date: 2026-09-05

Open source 1 →