Dove Creek Technology Campus (Beacon Data Centers)

This record consolidates 27 research observations while retaining source distinctions, location precision and unresolved fields.

approved_or_permittedproject status
VERIFIED_PRIMARYbest evidence tier
27linked evidence rows
Project facts

Location and operating record

Operator / developerBeacon Data Centers
JurisdictionSan Angelo (south of), TX
AddressApproximately one-quarter mile south of US-67 on FM 2335, along Spring Creek
Location precisionparcel or bounded site
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesDove Creek Technology Campus (Beacon Data Centers) · Dove Creek Technology Campus / Westline Site · Westline Site · Beacon Dove Creek
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure3 rows
SOURCE RECORD

Dove Creek Technology Campus (Beacon Data Centers): source record

permitted

One of three separate Tom Green County data center projects identified. The 2,409 MW figure is generation capacity, not IT load; no IT load figure was published. TCEQ permit numbers were not stated in the sources reviewed and are recorded as NOT_FOUND rather than guessed.

Key data: On-site natural gas generation with grid used only as backup | ERCOT | On-site well; possible brackish groundwater desalination

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Dove Creek Technology Campus (Beacon Data Centers): ownership and profile

permitted

Developer: Beacon Data Centers | Owner: Westline TX Holdings, LLC | Property entity: Westline TX Holdings, LLC | Permit applicant: Westline TX Holdings, LLC dba Beacon Data Centers (TCEQ air permit applicant) | County: Tom Green | Research region: Abilene-West Central Texas / Midland-Odessa-Permian Basin

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Dove Creek Technology Campus (Beacon Data Centers): power and grid

permitted

Key data: Utility: On-site natural gas generation with grid used only as backup | Utility region: ERCOT West | Grid area: ERCOT | Onsite generation MW: 2409

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Dove Creek Technology Campus (Beacon Data Centers): water and cooling

permitted

Key data: Water utility: On-site well; possible brackish groundwater desalination | Water source: On-site well water, possibly brackish groundwater with desalination | Cooling: Closed-loop cooling

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Dove Creek Technology Campus (Beacon Data Centers): permits and jurisdiction

permitted

Key data: Permit IDs: Four TCEQ air construction permit applications (expedited review) - permit numbers not published in sources reviewed | Jurisdictions: Tom Green County Commissioners Court | TCEQ | ERCOT

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

CIVIC AND COMMUNITY

Dove Creek Technology Campus (Beacon Data Centers): civic and community

permitted

Tom Green County declined a one-year data center moratorium in June 2026

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

permitted

State Rep. Drew Darby requested a public meeting on the air permits

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

permitted

Commissioner Shawn Nanny publicly quoted on the project

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

Dove Creek Technology Campus (Beacon Data Centers): environment and site

permitted

Gas plant sized up to 2,409 MW

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

permitted

More than 9.7 million tons per year of greenhouse gases estimated

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

permitted

More than 2,800 tons per year of criteria pollutants estimated

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

permitted

Specific permit application figures: 1,177 tpy CO, 419 tpy NOx, 117 tpy SO2

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

permitted

SCR and oxidation catalysts proposed as controls

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

permitted

Key data: Surrounding infrastructure: Spring Creek

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

permitted

Key data: Surrounding infrastructure: FM 2335

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

permitted

Key data: Surrounding infrastructure: US-67

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Dove Creek Technology Campus (Beacon Data Centers): timeline

permitted

Beacon co-founder and EVP Joseph Shovlin addresses Tom Green County Commissioners Court

Claim classification: Not yet assigned

Status date: 2026-06-02

Open source 1 →

permitted

TCEQ air construction permit application publicly announced

Claim classification: Not yet assigned

Status date: 2026-06-16

Open source 1 →

permitted

Tom Green County declines a one-year moratorium on data centers

Claim classification: Not yet assigned

Status date: 2026-06

Open source 1 →

permitted

State Rep. Drew Darby requests a TCEQ public meeting on the Beacon permit applications

Claim classification: Not yet assigned

Status date: 2026-08-11

Open source 1 →

TCEQ AIR PERMIT

Dove Creek Technology Campus (Beacon Data Centers): tceq air permit

permitted

Beacon Data Centers applied to TCEQ for an air construction permit for a gas power plant of up to 2,409 MW at the Dove Creek Technology Campus south of San Angelo, publicly announced 16 June 2026.

Key data: Gas plant up to 2,409 MW; TCEQ air permit application announced 2026-06-16

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-06-16

Open source 1 →

ENVIRONMENTAL IMPACT

Dove Creek Technology Campus (Beacon Data Centers): environmental impact

permitted

The permit application would allow more than 9.7 million tons of greenhouse gases and more than 2,800 tons of criteria pollutants per year.

Key data: >9.7M tons GHG/yr; >2,800 tons criteria pollutants/yr

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-06-16

Open source 1 →

OWNERSHIP CHAIN

Dove Creek Technology Campus (Beacon Data Centers): ownership chain

permitted

The TCEQ applicant of record is Westline TX Holdings, LLC doing business as Beacon Data Centers, filing four expedited air permit applications.

Key data: Applicant: Westline TX Holdings, LLC dba Beacon Data Centers; 4 permit applications

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-08-11

Open source 1 →

STREET ADDRESS

Dove Creek Technology Campus (Beacon Data Centers): street address

permitted

The site is described as roughly 1,240 buildable acres about a quarter mile south of US-67 on FM 2335 along Spring Creek.

Key data: ~1,240 buildable acres; 1/4 mile south of US-67 on FM 2335

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-08-11

Open source 1 →

ONSITE GENERATION

Dove Creek Technology Campus (Beacon Data Centers): onsite generation

permitted

The campus is designed for on-site natural gas generation with the grid used only as backup, closed-loop cooling, an on-site well and possible brackish groundwater desalination; emission limits cited are 1,177 tpy CO, 419 tpy NOx and 117 tpy SO2 with SCR and oxidation catalysts.

Key data: 1,177 tpy CO; 419 tpy NOx; 117 tpy SO2; SCR plus oxidation catalysts

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-08-11

Open source 1 →

JOBS

Dove Creek Technology Campus (Beacon Data Centers): jobs

permitted

The project is presented as 1,200 construction jobs and more than 300 permanent jobs.

Key data: 1,200 construction; 300+ permanent

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-08-11

Open source 1 →

COMMUNITY RESPONSE

Dove Creek Technology Campus (Beacon Data Centers): community response

permitted

Tom Green County declined a one-year data center moratorium in June 2026, Beacon co-founder and EVP Joseph Shovlin addressed commissioners on 2 June, and State Rep. Drew Darby requested a TCEQ public meeting on the permits.

Key data: County declined 1-year moratorium; Rep. Drew Darby requested TCEQ public meeting

Claim classification: SOURCED_FACT · Verification: VERIFIED · Retrieved: 2026-09-05

Status date: 2026-08-11

Open source 1 →

Sources

Evidence and provenance

Open TX state research →

Dove Creek Technology Campus (Beacon Data Centers) Data Center Project | San Angelo (south of) | Compute Equity Atlas