permitted
One of three separate Tom Green County data center projects identified. The 2,409 MW figure is generation capacity, not IT load; no IT load figure was published. TCEQ permit numbers were not stated in the sources reviewed and are recorded as NOT_FOUND rather than guessed.
Key data: On-site natural gas generation with grid used only as backup | ERCOT | On-site well; possible brackish groundwater desalination
Claim classification: Not yet assigned
Status date: 2026-09-05