Evidence record
Operator confirms the campus address and its 2024 opening; April 2026 update says the first two buildings operate while the third is expected in early 2027. Operational campus does not assert every planned building is complete. Exact address returned no Census match.
Claim classification: Not yet assigned · Verification: first_party_verified · Retrieved: 2026-10-29
Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.