Compute Equity Atlas
← National map
Georgia / GA

Georgia data center and compute infrastructure map

Start with the state view and mapped project locations, then move into permits, planning, civic context, operators and source evidence. Only locations supported by explicit coordinates are plotted.

2mapped locations
97deep evidence rows
7validated refresh rows
Animated state view

Georgia

True aspect · centered · uncropped
Evidence-backed project locations

Georgia project points

Only records with explicit published coordinates are plotted here. Missing coordinates remain visible in the evidence sections rather than being guessed.

2 mapped locations
Amazon ATL089 (application 29883)Newton County / CovingtonThe EPD draft permit gives the exact street address and permit number; a permit index adds coordinatesverified primaryOpen source →
ProjectsIntent signalsCivic impactProject profilesInfrastructureSources & gaps
Current development signals

Permits, filings, zoning and other activity

12 source-backed evidence rows are integrated on this page.

SDC ATLA — construction and operation of a data center with 315 diesel-fired emergency generators

Winston, Douglas County — 2075 Jason Industrial Parkway

Developer / operator: SDC ATLA, LLC

Status: "Applications have been received for Air Quality Permits. These applications are presently under review."

Permit / docket: Application No. 29802

Record type: Air quality permit application (SIP public advisory)

Capacity / size: 315 × 2.5 MW diesel emergency generators (≈787.5 MW of backup generation) plus associated belly tanks

VERIFIED PRIMARY

Limitation: Advisory PDF is undated apart from the comment deadline; IT load MW and building size not stated. A permit narrative for app 29802 exists at permitsearch.gaepd.org but was not fetched.

Open source →

TADG – ATL02 / Ellenwood — construct and operate an "advanced technology ecosystem" data center

Ellenwood, Clayton County — 4350 E Tanners Church Road

Developer / operator: TADG (applicant name as listed)

Status: "presently under review"

Permit / docket: Application No. 30104

Record type: Air quality permit application (SIP public advisory)

Capacity / size: n.a. (generator count not specified)

VERIFIED PRIMARY

Limitation: Full corporate name behind "TADG" not stated in the advisory.

Open source →

Amazon Data Services, Inc. ATL089 Campus — construction of a data center

Covington, Newton County — 11145 Alcovy Road

Developer / operator: Amazon Data Services, Inc.

Status: "presently under review"

Permit / docket: Application No. 29883

Record type: Air quality permit application (SIP public advisory)

VERIFIED PRIMARY

Limitation: Generator count and MW not stated in the advisory.

Open source →

ATL2 Data Center — proposed development of a data center campus with diesel-fired generators

Covington, Newton County — 10835 Hazelbrand Rd NE

Developer / operator: Not disclosed in the advisory (facility name only)

Status: "presently under review"

Permit / docket: Application No. 29898

Record type: Air quality permit application (SIP public advisory)

VERIFIED PRIMARY

Limitation: Operator not named; generator count not specified.

Open source →

Flexential Corporation — construction and operation of 33 diesel-fired emergency generators

Douglasville, Douglas County — 1700 North River Road

Developer / operator: Flexential Corporation

Status: "presently under review"

Permit / docket: Application No. 29851

Record type: Air quality permit application (SIP public advisory)

Capacity / size: 33 diesel-fired emergency generators (MW not stated)

VERIFIED PRIMARY

Limitation: Advisory does not state whether this is a new build or an expansion.

Open source →

QTS Fayetteville I, LLC — installation of additional emergency generators

Fayetteville, Fayette County — 1435 Hwy 54 West

Developer / operator: QTS (QTS Fayetteville I, LLC)

Status: "presently under review"

Permit / docket: Application No. 30027

Record type: Air quality permit application (SIP public advisory)

Capacity / size: n.a. (generator count not specified)

VERIFIED PRIMARY

Limitation: Expansion of an existing site (a draft permit 7374-113-0073-S-01-0 for QTS Fayetteville I appears on EPD's site but was not fetched in full).

Open source →

EdgeConneX ATL11 — eight additional 1,750 kW back-of-house emergency generators (10 total) plus tier reclassification of 42 existing generators

Union City, Fulton County — 4780–4850 Stonewall Tell Road

Developer / operator: Edgeconnex ATL11, LLC

Status: "presently under review"

Permit / docket: Application No. 29820

Record type: Air quality permit application (SIP public advisory)

Capacity / size: 8 new + 2 existing back-of-house generators at 1,750 kW each; 42 existing emergency generators reclassified

VERIFIED PRIMARY

Limitation: Signal is an expansion/reclassification at an existing campus, not a greenfield build.

Open source →

QTS ATL 3 Campus — installation of emergency engines at a data center

Augusta, Richmond County — 2883 Gorgon Highway

Developer / operator: QTS

Status: "presently under review"

Permit / docket: Application No. 30169

Record type: Air quality permit application (SIP public advisory)

VERIFIED PRIMARY

Limitation: Street name as printed in the advisory ("Gorgon Highway"); engine count and MW not stated.

Open source →

The Keep 2 Campus — installation of new additional emergency generators

Cartersville, Bartow County — 78 Bates Rd SE

Developer / operator: Not disclosed in the advisory (facility name only)

Status: "presently under review"

Permit / docket: Application No. 30076

Record type: Air quality permit application (SIP public advisory)

VERIFIED PRIMARY

Limitation: Operator not named in the advisory; generator count not stated.

Open source →

Core Scientific-Dalton 4 Enterprise Drive — new data center with 80 diesel-fired emergency generators

Dalton, Whitfield County — Old Tilton Road (4 Enterprise Drive)

Developer / operator: Core Scientific

Status: "presently under review"

Permit / docket: Application No. 29951

Record type: Air quality permit application (SIP public advisory)

Capacity / size: 80 diesel-fired emergency generators (MW not stated)

VERIFIED PRIMARY

Limitation: Advisory describes operation as "Computer Processing and Data Preparation and Processing Services"; MW/sq ft not stated.

Open source →

Data-center development within White Oak Technology Park; rezoning from RA and M-1 to DC (data center district)

Columbia County — tax map parcel 019 Partial 002 C, off Morris Callaway Road

Developer / operator: No company named; Development Authority representative Chaney Eldridge referenced

Status: "Planning Commission recommended approval with conditions"; forwarded to Board of Commissioners for final action

Permit / docket: RZ260304

Record type: Rezoning (re-advertised)

DISCOVERY LEAD

Limitation: Could not reach a Columbia County agenda packet or minutes for RZ260304; the county website exposes Planning/Zoning and Agendas pages but no searchable case index was reachable. Case number, parcel, and dates are as reported by the aggregator only. Related Columbia County data-center rezonings reported in the same source family: Pumpkin Center, Byrd/Bird Farms, Green Jacket/Watt Oak expansion (Jan 15, 2026 recommendations) — unverified.

Open source →

Georgia Power "Large Load Contract Filing – 7.15.26" (contracts for large loads, the category that covers data-center customers)

Statewide (Georgia Power service territory)

Developer / operator: Georgia Power Company

Status: Filed / received (document detail page shows filed and received dates; no disposition stated)

Permit / docket: Docket No. 44280; Document Filing #227259

Record type: Utility large-load contract filing with the Georgia PSC

VERIFIED PRIMARY

Limitation: The document-detail page states no project name, county, or MW; the substance is in a ZIP attachment that was not opened. Related: Docket No. 55378 quarterly large-load economic development reports (e.g., filing #226607, filed 05/15/2026) — not opened in this session.

Open source →

Civic and infrastructure context

What the evidence says around these projects

30 source-backed evidence rows are integrated on this page.

ENVIRONMENTAL JUSTICE DEMOGRAPHIC

SDC ATLA, LLC (permit application 29802, AIRS 097-00103)

Douglas (Winston)

NOT_FOUND in the permit record: EPD's permit narrative for the 315-generator campus contains **no** environmental justice analysis, demographic screening, or disadvantaged-community designation — the only area characterization is "Douglas County is designated as an attainment area for all criteria pollutants." Sierra Club was the sole commenter (advisory closed Sept 5, 2025).

Key data: Zero EJ analysis in narrative; attainment area for all criteria pollutants; 315 generators @ 2.5 MW

VERIFIED PRIMARY

Limitation: Georgia has no state EJ screening tool equivalent to Virginia EJScreen+; no Georgia EPD project was found flagged as being in an EJ area.

Open source →

ENVIRONMENTAL JUSTICE DEMOGRAPHIC

TADG ATL02 (Ellenwood) — host-community context

Clayton (Ellenwood) / DeKalb

Qualitative EJ evidence only, from adjacent Ellenwood (DeKalb) where a 95-acre, 2-million-sq-ft PCC-DeKalb data center was rejected: Ellenwood is described as a **majority-Black community** already burdened by pollution from surrounding industry including Hartsfield-Jackson airport, with residents reporting poor air quality, asthma, and sinus symptoms; opponents cited a strained county water system with capacity issues, sewage over-spills, and water-main breaks. No percentile, income figure, or agency EJ designation is stated.

Key data: Ellenwood described as majority-Black; 95-acre / 2M sq ft project rejected; percentiles n.a.

DISCOVERY LEAD

Limitation: Refers to the neighboring DeKalb project, not TADG ATL02 itself; no quantitative demographic or EJ index value given.

Open source →

ENVIRONMENTAL JUSTICE DEMOGRAPHIC

EdgeConneX ATL11 (Union City) — host-community context

Fulton (Union City)

South Fulton's majority-Black neighborhoods are organizing against the data-center buildout; a resident living ~6 miles from a proposed 1.9-million-sq-ft facility cites noise, water, and electricity use. Statewide context in the same reporting: Georgia's built and planned data centers would need ~**27 billion gallons of water per year** (enough for Athens, GA for five years) and energy equal to powering ~**3.9 million homes** (Science for Georgia). No tract-level EJ percentile is published.

Key data: ~27 billion gal/yr statewide water; ~3.9 million homes of energy; percentiles n.a.

DISCOVERY LEAD

Limitation: Advocacy-sourced statewide estimates; not project-specific to ATL11; no EJ index value.

Open source →

WATER WITHDRAWAL VOLUME

QTS Fayetteville I

Fayette (Fayetteville)

The most concrete Georgia water record found. County billing records show QTS's Fayetteville site went from one water line (Feb 2024, 20.6 million gallons billed) to **13 water lines totaling 109 million gallons billed** — at least the equivalent of 11 Georgia Aquariums. An internal county letter said two additional lines were "installed without the knowledge or inspection by (county) staff"; the county billed QTS **$147,000** and blamed a smart-meter migration for the gap. QTS says operational domestic use will be only ~**9,000–12,000 gallons per month** per building (≈4 households) once closed-loop cooling is complete in **2030**, and that the site uses <1% of county water production. An advocacy account of the same records puts three meters at ~**40.7 million gallons** unknown/unapproved, a **$225,385** retroactive bill, and QTS's COO citing a **174,000 gal/day** average — versus a public claim of "2,000 gallons a day" for the whole campus.

Key data: 13 lines / 109 million gallons billed; $147,000 bill; 600-acre site; ~9,000–12,000 gal/month operational

CORROBORATED

Limitation: The two accounts give different meter totals and bill amounts ($147,000 vs $225,385) — likely different meter subsets or billing rounds; underlying county records were not fetched. (confidence detail: CORROBORATED (WRDW) / DISCOVERY_LEAD (Substack))

Open source →

WATER WITHDRAWAL VOLUME

QTS ATL 3 (Gordon Highway)

Richmond / Columbia (Augusta)

The §401 water quality certification for QTS Atlanta III, LLC (public notice **SAS-2024-00760**) was **Certified with Conditions** for a ~200-acre, six-building project (four 376,000 sq ft + two 306,000 sq ft) north of Gordon Highway and south of Butler Creek — but it states **no** water withdrawal or consumption volume, and **no public comments were received** during the Feb 25–Mar 26, 2026 notice period.

Key data: SAS-2024-00760, certified with conditions, ~200 acres; volume n.a.; zero public comments

VERIFIED PRIMARY

Limitation: §401 certification addresses aquatic-resource impacts only, not withdrawal volumes.

Open source →

WATER WITHDRAWAL VOLUME

SDC ATLA

Douglas (Winston)

EPD's §401 public notice for the 215.61-acre, eight-building (2,388,800 sq ft) SDC ATLA campus documents infrastructure and stormwater quantitatively (597,600 sq ft of detention, treatment of a 1.2-inch rainfall event, >80% TSS reduction, 2.73 ac jurisdictional wetland and 7,723 lf jurisdictional perennial stream impacts) but states **no withdrawal or consumption volume**. Site includes a failed residential development and mixed pine/hardwood upland and wetland.

Key data: 215.61 acres; 8 buildings / 2,388,800 sq ft; 2.73 ac jurisdictional wetlands; volume n.a.

VERIFIED PRIMARY

Limitation:

Open source →

WATER WITHDRAWAL VOLUME

The Keep 2 Campus (Switch) — county policy

Bartow (Cartersville)

Bartow County's official policy statement gives design-class figures rather than a project volume: an open-loop evaporative facility in the 100 MW class may consume ~**500,000 gallons per day**, while closed-loop/air-cooled designs can cut consumption by **as much as 95%**. Standards adopted **July 1, 2026** require every data center to use closed-loop or functionally equivalent cooling and prohibit open-loop, once-through, and continuously evaporative cooling. Switch (City of Cartersville) is served by the Bartow County Water System and initially asked about evaporative cooling for future phases before saying customers prefer closed-loop.

Key data: ~500,000 gal/d per 100 MW open-loop class; closed-loop mandate effective 2026-07-01; project volume n.a.

VERIFIED PRIMARY

Limitation: No Switch-specific gallons figure disclosed.

Open source →

UTILITY INTERCONNECTION QUEUE

Georgia Power Large Load Contract Filing (Docket 44280)

statewide

Project-level large-load contract review at the PSC: NRDC, Sierra Club Georgia Chapter, and Southern Alliance for Clean Energy asked Staff to object to **Document Filing #227259** ("Large Load Contract Filing – 7.15.26") covering an **OpenAI** load projected at **3.2 gigawatts**, requiring roughly **3,000 MW of generation** — potentially the largest single electric load addition in Georgia history — and to recommend rejection absent enforceable consumer protections; requested objection deadline **August 14, 2026**. The docket record shows a Large Load Contract Review Extension Letter (8/13/2026) and an **Executed Large Load Contract** filed **8/27/2026**.

Key data: OpenAI load 3.2 GW / ~3,000 MW generation; Filing #227259 (7/15/2026); executed contract filed 2026-08-27

VERIFIED PRIMARY

Limitation: No interconnection queue position, queue number, or requested in-service date is stated; the PSC docket index entries were read via search results. Whether the 8/27/2026 executed contract is the OpenAI contract is not established. (confidence detail: VERIFIED_PRIMARY (advocacy letter to PSC) / CORROBORATED (docket index))

Open source →

UTILITY INTERCONNECTION QUEUE

ATL2, LLC (Serverfarm) — permit 29898, AIRS 217-00079

Newton (Covington)

EPD's narrative documents the backup fleet (37 diesel generators: 36 × 3.3 MW plus one 2.25 MW administrative unit; sources G01–G36 at 32.1 MMBtu/hr each) but states **no facility MW load, no interconnection details, and no queue position**. Separately, EPD issued notices of violation to **VoltaGrid and Serverfarm** over a 33-engine "pop-up" prime-power plant in Covington that environmental groups said was under construction without permits — the first of its kind in Georgia.

Key data: 37 generators (36 × 3.3 MW + 1 × 2.25 MW); 33-engine adjacent power plant; NOVs issued; grid load n.a.

VERIFIED PRIMARY

Limitation: The NOV documents themselves were not obtained; no permit/case number for the NOVs is published in the coverage. (confidence detail: VERIFIED_PRIMARY (EPD) / CORROBORATED (NOV))

Open source →

COMMUNITY OPPOSITION OR LITIGATION

TADG ATL02

Clayton (Ellenwood)

Contested approval then a countywide freeze: the Clayton County Board of Commissioners approved the site plan, height increase, and modifications **3-1** for the just-under-**35-acre** greenfield parcel at 4350 E Tanners Church Road, with **eight residents** speaking against on water use, noise, and traffic; the zoning advisory group had recommended approval with conditions. The Board later approved a **moratorium through Dec. 31** on all new/expanded data-center applications, permits, and licenses in unincorporated Clayton County, citing "numerous phone calls and emails" from residents.

Key data: Approval 3-1; 8 residents opposed; ~35 acres; moratorium through Dec. 31

CORROBORATED

Limitation: County minutes not fetched; moratorium year not stated in the article; no litigation found.

Open source →

COMMUNITY OPPOSITION OR LITIGATION

SDC ATLA area / TC Atlanta Development (Winston)

Douglas (Winston)

Winston has seen repeated single-vote approvals over staff objections: the Douglas County Commission approved the TC Atlanta Development data center on the **old Waldrop Farms property** on **February 4, 2025** after "months of community opposition" and a **staff recommendation of denial**, adding conditions (match Winston's aesthetic, bike/pedestrian access, restrict land to data-center use only). Residents cited proximity to an elementary school and a public park — "They're gambling with our lives and with the lives of the kids." Local reporting notes the commission approved Winston-area data centers twice in one year "by a single vote," both times overruling staff.

Key data: Approved 2025-02-04 over staff denial recommendation; conditions imposed; approvals by a single vote

CORROBORATED

Limitation: TC Atlanta Development is a separate Winston project from SDC ATLA (Stream, 2075 Jason Industrial Pkwy); no vote tally published; no litigation found.

Open source →

COMMUNITY OPPOSITION OR LITIGATION

White Oak Technology Park rezoning RZ260304

Columbia (Appling/Harlem)

Residents pressed planners on Mar 5, 2026 over noise, construction traffic, water/wells, geothermal drilling, buildout timeline, and incentives; the Planning Commission recommended approval with conditions by **voice vote**, sending RZ260304 to the Board of Commissioners for Mar 17, 2026. In the broader Columbia County round, commissioners **disapproved one of three** proposed data centers on Feb 4, 2026 — a partial win for opponents.

Key data: RZ260304 recommended by voice vote 2026-03-05; BOC action 2026-03-17; 1 of 3 county projects disapproved

CORROBORATED

Limitation: No numeric vote tally; Augusta Chronicle read as a search result.

Open source →

Show all remaining 18 evidence rows
COMMUNITY OPPOSITION OR LITIGATION

EdgeConneX ATL11 area (Union City)

Fulton (Union City)

Union City hearings on data-center rezoning near the Jonesboro Rd/Buffington Rd subdivision were so crowded that police temporarily removed news cameras; the Zoning Commission approved rezoning over organized resident pushback.

Key data: Overcrowded council hearing; zoning commission approved over opposition

DISCOVERY LEAD

Limitation: Read as search results, not fetched; the contested site is not confirmed to be ATL11 (4810 Stonewall Tell Road).

Open source →

RATEPAYER OR GRID IMPACT

Georgia Power / PSC (Docket 44280 and related)

statewide

Georgia's PSC has built an explicit ratepayer-protection track: **April 2024** order requiring that data-center revenue **reduce, not increase, residential bills**, with quarterly data-center reports and cost-allocation studies ensuring data centers pay total costs; **January 2025** rule allowing minimum billing requirements and longer contract terms for new large loads (so departing data centers still pay for infrastructure) and requiring all new data-center contracts be filed with the PSC **at least 30 days before execution**; **April 2025** price-structure changes for large loads. Load forecasts moved from 400 MW (2022) to 6,600 MW (2023) to 8,500 MW, and on **December 19, 2025** the Commission certified **9,985 MW** of new generation, ~**80%** of it expected to serve data centers, against Georgia Power's current 22,000 MW statewide deployment.

Key data: 9,985 MW certified 2025-12-19, ~80% for data centers; 30-day pre-execution contract filing rule (Jan 2025)

VERIFIED PRIMARY

Limitation: Fact sheet gives no residential bill dollar impact; the NRDC/Sierra/SACE letter argues the protections are insufficient for the OpenAI-scale contract.

Open source →

AGRICULTURAL OR LAND USE CONVERSION

QTS Fayetteville I

Fayette (Fayetteville)

Reported conversion of rural land: the Fayette County Development Authority brokered the sale of **615 acres of forest and pastureland** to QTS in 2022 (the site is described elsewhere as 600 acres). No agricultural-impact mitigation agreement is referenced.

Key data: 615 acres of forest and pastureland converted (2022)

DISCOVERY LEAD

Limitation: Advocacy source; acreage differs from the 600-acre figure in WRDW's reporting.

Open source →

AGRICULTURAL OR LAND USE CONVERSION

TC Atlanta Development (Winston)

Douglas (Winston)

The approved Winston project sits on the **old Waldrop Farms property** — a named former farm — with no agricultural mitigation condition among the imposed conditions (aesthetics, bike/pedestrian access, data-center-only land restriction).

Key data: Former Waldrop Farms property; no ag-mitigation condition

DISCOVERY LEAD

Limitation: Tracker source; county rezoning file not fetched.

Open source →

AGRICULTURAL OR LAND USE CONVERSION

White Oak Technology Park (RZ260304)

Columbia

The parcel (tax map 019 Partial 002 C) is rezoned from **RA and M-1 to DC** (data center district); the county's earlier White Oak application covered **1,945.05 acres** between Harlem and Appling and the Feb 2026 approvals were characterized as "rural rezonings." No agricultural-impact mitigation requirement is mentioned.

Key data: RA + M-1 → DC; broader park application 1,945.05 acres

CORROBORATED

Limitation: The page does not explicitly state that RA means "Residential-Agricultural"; Augusta Chronicle read as a search result.

Open source →

AGRICULTURAL OR LAND USE CONVERSION

Agricultural Impact Mitigation Agreement (AIMA) program

statewide

**NOT_FOUND / does not appear to exist.** Searches for a Georgia Department of Agriculture agricultural-impact mitigation agreement program returned only the **Illinois** statutory scheme (Renewable Energy Facilities Agricultural Impact Mitigation Act, e.g., IL HB3196) and Georgia's *voluntary, non-binding* "Recommended Practices for Responsible Siting and Design of Solar" from DNR/Georgia Wildlife. No Georgia AIMA requirement was found for any data center project.

Key data: No Georgia AIMA program found; Illinois AIMA is the only match

CORROBORATED

Limitation: Read via search results; a negative finding — absence of evidence rather than proof of non-existence.

Open source →

DECOMMISSIONING PROVISION

SDC ATLA; TADG ATL02; ATL089; ATL2; QTS ATL3; RZ260304; The Keep 2

multiple

Mixed: **no decommissioning condition** appears in any of the fetched project records — EPD narratives for SDC ATLA (29802) and ATL2 (29898) and the SDC ATLA and ATL3 §401 certifications are all explicitly silent, and the Columbia County RZ260304 conditions as reported contain none. However, Georgia counties are now writing the requirement into ordinances: a Science for Georgia model ordinance includes an "Abandonment, Decommissioning, and Reclamation Plan"; Hall County's 2026 UDC update lists "Decommissioning and site restoration process"; Floyd County requires a pre-permit decommissioning plan; and Bartow County's data center standards require substations to be decommissioned and removed as part of site reclamation if a data center ceases operations.

Key data: Zero project-level conditions found; ordinance-level requirements in Bartow, Floyd, Hall + model ordinance

CORROBORATED

Limitation: EPIcenter and Science for Georgia pages were read via search results; whether Bartow's reclamation requirement binds The Keep 2 (in Cartersville city limits) was not verified.

Open source →

FISCAL IMPACT LOCAL GOVERNMENT

The Keep 2 Campus (Switch)

Bartow (Cartersville)

A rare explicit "no incentive" record: Bartow County states it has **granted no tax abatements** for these facilities and entered **no reduction, exemption, or PILOT arrangement** that would reduce taxes owed. Cost context published by the county: **$12–15 million per MW** for buildings/infrastructure plus **$10–40 million per MW** for equipment, with a co-located Digital Realty campus at ~1.3 GW implying ~**$18 billion** build-out over 10 years. Economic-development materials estimate Switch's $772 million campus at ~**$15 million** in annual tax contributions.

Key data: No abatements/PILOTs granted; $12–15M/MW build cost; ~$15M/yr estimated tax contribution (Switch)

VERIFIED PRIMARY

Limitation: The $15M annual figure is an economic-development estimate read via search results; state sales-tax exemption benefits are not addressed. (confidence detail: VERIFIED_PRIMARY (county) / DISCOVERY_LEAD ($15M estimate))

Open source →

FISCAL IMPACT LOCAL GOVERNMENT

TC Atlanta Development (Winston)

Douglas (Winston)

Douglas County's own analysis projects data-center tax revenue starting at **$2.4 million per year in 2025** and rising to **$96 million over the next 10 years**; no abatement, PILOT, or incentive amount is stated.

Key data: $2.4M/yr starting 2025; $96M over 10 years

CORROBORATED

Limitation: County analysis not obtained directly; no school-district fiscal-impact estimate published.

Open source →

FISCAL IMPACT LOCAL GOVERNMENT

QTS (Atlanta campus, Beltline) — incentive precedent

Fulton (Atlanta)

A quantified, contested abatement request: QTS sought a **$45 million** tax exemption from Development Authority of Fulton County for its Atlanta campus expansion and shelved the request after pushback from residents and city leaders.

Key data: $45 million requested tax break; shelved

DISCOVERY LEAD

Limitation: Read as search results; concerns QTS's Atlanta Beltline campus, not QTS Fayetteville I or ATL 3.

Open source →

NOISE OR TRAFFIC IMPACT

White Oak Technology Park (RZ260304)

Columbia

The clearest Georgia noise/traffic finding, including an internal inconsistency: the rezoning narrative and the conditions carry **different thresholds — 70 decibels in the narrative versus 65 decibels in the conditions** — and **construction-phase traffic has not been studied**, despite resident estimates of thousands of construction workers and a disputed buildout timeline (public materials say 15–20 years; a county official said five).

Key data: 70 dB (narrative) vs 65 dB (conditions); no construction traffic study

CORROBORATED

Limitation: Meeting-coverage aggregator; the county's rezoning conditions document was not fetched to confirm which threshold governs.

Open source →

NOISE OR TRAFFIC IMPACT

TADG ATL02

Clayton (Ellenwood)

Noise and traffic were among the three stated resident concerns (with water) at the public hearing where eight residents spoke against the project, but **no noise study, decibel limit, traffic study, or variance request** is documented.

Key data: Concerns raised; no study or dB limit documented

CORROBORATED

Limitation: Conditions attached to the site-plan approval were not published in the coverage.

Open source →

CUMULATIVE REGIONAL IMPACT

SDC ATLA (permit 29802)

Douglas (Winston)

Facility-wide, not regional: EPD's SCREEN3 analysis summed benzene impacts across **buildings 1–9** (scaling a representative generator to 35 generators per building) to a facility-wide maximum 1-hour short-term impact of **632.61 µg/m³** and 1-hour long-term impact of **1.52 µg/m³** (15-minute max 835.05 µg/m³; annual max 0.12 µg/m³). The ATL2 permit used AERMOD across **all 37 generators** with five years of meteorology. Neither narrative contains any assessment of impacts combined with other nearby data centers.

Key data: 632.61 µg/m³ facility-wide 1-hr benzene (9 buildings × 35 generators); no multi-facility analysis

VERIFIED PRIMARY

Limitation: Explicit absence of cumulative multi-project analysis is the finding.

Open source →

CUMULATIVE REGIONAL IMPACT

CUMULATIVE — ATL089, ATL2, Meta and neighbors

Newton (Covington)

Newton County substituted a moratorium for a cumulative study: after an emergency moratorium on Feb 17, 2026 (to Mar 18), revised Mar 3 (to Apr 8), the Board adopted Resolution **R-040726b** on **April 7, 2026** barring acceptance of all data-center applications (rezoning, SUP/CUP, development permits, site plans, building permits, land-disturbing approvals) until **October 7, 2026**, to allow time to study and adopt a data-center ordinance, finding that such development threatens the County's ability to provide adequate "water, utilities, and services." Context: reporting links a Meta data center to failing private wells and sediment in taps, and the county is described as "on track to run out of water by 2030."

Key data: Resolution R-040726b, moratorium to 2026-10-07 (adopted 2026-04-07)

VERIFIED PRIMARY

Limitation: The resolution is a land-use pause, not a published cumulative impact assessment; the "run out of water by 2030" and well-failure claims are advocacy-sourced. (confidence detail: VERIFIED_PRIMARY (resolution) / DISCOVERY_LEAD (water claims))

Open source →

CUMULATIVE REGIONAL IMPACT

CUMULATIVE — regional air/water agency assessment

metro Atlanta

NOT_FOUND. No Georgia EPD, Metropolitan North Georgia Water Planning District, or regional transmission planner cumulative impact assessment covering multiple co-located data centers was located. The closest substitutes are (a) county-by-county moratoria and ordinances (8+ Georgia jurisdictions had passed moratoriums as of 2026 reporting), (b) statewide aggregate estimates from Science for Georgia (~27 billion gal/yr; ~3.9 million homes of energy), and (c) proposed state legislation — HB 1059, the "Data Center Impact Assessment and Development Moratorium Act of 2026."

Key data: 8+ GA jurisdictions with moratoriums; HB 1059 proposed impact-assessment act; no agency cumulative study

DISCOVERY LEAD

Limitation: Both read via search results; HB 1059 is a bill, not an adopted requirement.

Open source →

ALL DIMENSIONS

Amazon Data Services ATL089 (application 29883, permit 7374-217-0078-e-01-0)

Newton (Covington)

NOT_FOUND for civic dimensions. EPD records confirm the application (No. 29883, 11145 Alcovy Road, Covington 30054) and a draft permit, and reporting confirms Amazon paid **$36 million for 430 acres** along I-20 in Covington, but no EJ analysis, water volume, MW/queue data, opposition record, incentive value, noise/traffic study, or decommissioning condition tied to ATL089 was found.

Key data: Application 29883; 430 acres for $36 million

DISCOVERY LEAD

Limitation: Both read via search results; the ATL089 draft permit PDF (29883-draft) was identified but not fetched.

Open source →

ALL DIMENSIONS

Core Scientific-Dalton

Whitfield (Dalton)

NOT_FOUND. No civic-impact record (EJ screening, water permit, queue position, opposition/litigation, ratepayer filing, land conversion, decommissioning, incentive value, noise/traffic, cumulative assessment) was located for the Dalton/Whitfield County site in this session's searches.

Key data: n.a.

DISCOVERY LEAD

Limitation: Whitfield County and City of Dalton (Dalton Utilities) records were not reachable via search this session; Dalton Utilities is a municipal utility outside PSC jurisdiction, so no PSC filing would exist.

Open source →

ALL DIMENSIONS

Flexential Douglasville

Douglas (Douglasville)

NOT_FOUND for civic dimensions. Company pages confirm Douglasville 1 (~205,000 sq ft, 22.5 MW critical load) and Douglasville 2 (up to 80+ kW/cabinet, liquid-ready) and Flexential's May 12, 2025 acquisition of both sites, but no EJ screening, water volume, queue position, opposition, incentive value, noise/traffic study, or decommissioning condition was found. Note the co-located Aligned ATL01 air permit (PDF-OP-29094, 1551 North River Road, Douglasville) shows the same corridor is permitted for multiple operators.

Key data: Douglasville 1: ~205,000 sq ft, 22.5 MW critical load

DISCOVERY LEAD

Limitation: Read via search results; existing operational sites generate fewer public civic records than new rezonings.

Open source →

Project profile evidence

Operators, locations, power, water, capacity and other project facts

55 source-backed evidence rows are integrated on this page.

EXACT LOCATION

SDC ATLA (Stream Data Centers)

Douglas County / Winston

Two official-record addresses exist for this project: the air-permit notice address and the county development-review parcel record

Key data: Air permit notice address 2075 Jason Industrial Parkway, Winston, Douglas County; county development-review record lists 0 Polk Rd with parcels 01660250005 and 01660250006, land lots 0166, 0186, 0187, District 02, Section 5

VERIFIED PRIMARY

Limitation: Two different site addresses appear across sources; the parcel numbers come from a permit-aggregation mirror of the county development review record at https://www.datacenter.fyi/public-record/stream-data-center-6326ee10

Open source →

OWNERSHIP CHAIN

SDC ATLA

Douglas County / Winston

The applicant is a project LLC whose mailing address matches Stream Data Centers' Dallas headquarters, and the 401 certification names an individual officer

Key data: SDC ATLA, LLC, Attn: Mr. Paul Moser, 2001 Ross Avenue Suite 400, Dallas TX 75201

VERIFIED PRIMARY

Limitation: The Stream Data Centers corporate link is inferred from the shared Dallas address; no SoS filing was retrieved

Open source →

POWER SUPPLIER

SDC ATLA

Douglas County / Winston

The county development record lists the investor-owned utility as both grid operator and electric utility for this site

Key data: Georgia Power as electric utility and grid operator

CORROBORATED

Limitation: Note that GreyStone Power Corporation is the electric cooperative active in Douglas County data center service, so territory assignment should be confirmed with the utility

Open source →

POWER SUPPLIER (cross-cutting)

GreyStone Power large-load framework

Douglas County

The Douglas County cooperative publishes its large-load contracting framework, which applies to co-op-served data centers in the county

Key data: GreyStone Power Corporation uses a "Customer Choice Agreement," Contribution in Aid of Construction payments for dedicated substations, fixed minimum charges regardless of in-service date, and termination payments; Georgia Transmission Corporation handles transmission planning

VERIFIED PRIMARY

Limitation: The page does not assign specific facilities to GreyStone versus Georgia Power

Open source →

JURISDICTION STACK and PLANNING ZONING CONTACT

SDC ATLA

Douglas County / Winston

Air and water permitting is state-level with a named 401 certification contact; the local land-use body is the county's joint board

Key data: Georgia EPD Air Protection Branch, 4244 International Pkwy Suite 120, Atlanta 30354, 404-363-7000; 401 water quality certification contact David Hedeen, david.hedeen@dnr.ga.gov, 470-427-2730; Douglas County Joint Planning and Zoning Board with planning and zoning manager Lisonbee Duncan

VERIFIED PRIMARY

Limitation: The named county planning manager comes from coverage of a different Douglas County case (see next row); no phone or email published for that role

Open source →

PLANNING ZONING CONTACT

Douglas County data center land-use context

Douglas County

Coverage of a separate 703-acre Douglas County denial names the county planning and zoning manager and the case-numbering convention used locally

Key data: Lisonbee Duncan, county planning and zoning manager; applicant East Village Oath LLC; map amendment M2026-01, rezoning Z2026-56, special use permits S2026-57; denial cited failure to demonstrate a power agreement

CORROBORATED

Limitation: This is a distinct project from SDC ATLA; recorded for jurisdiction/contact reuse only. Water-related concerns cited include the Dog River watershed and Clinton Nature Preserve

Open source →

WATER SUPPLIER

SDC ATLA

Douglas County / Winston

The 401 water quality certification places the site in a named watershed; the county's water and sewer authority is the local utility of record

Key data: Middle Chattahoochee–Lake Harding Watershed; Douglasville-Douglas County Water and Sewer Authority as the county utility

DISCOVERY LEAD

Limitation: No service agreement between SDC ATLA and DDCWSA was located; the authority attribution is by jurisdiction, not a project document

Open source →

ECON DEV CONTACT, GENERAL CONTACT, SURROUNDING INFRASTRUCTURE

SDC ATLA

Douglas County / Winston

NOT_FOUND — the EPD permit documents and county development record fetched name no economic development contact, public inquiry line, substations, transmission lines, water mains, rail or fiber

Key data: n.a.

DISCOVERY LEAD

Limitation: Development Authority of Douglas County pages were not fetched this session

Open source →

EXACT LOCATION

TADG ATL02

Clayton County / Ellenwood

Reporting on the county approval gives the street address, acreage and bounding roads

Key data: 4350 E Tanners Church Road, Ellenwood; approximately 35 acres between Dunn and Williamson roads

CORROBORATED

Limitation: Parcel ID and lat-long not published

Open source →

OWNERSHIP CHAIN and OPERATOR

TADG ATL02

Clayton County / Ellenwood

The applicant is TA Realty's digital platform, and the sponsor's institutional parent is identified

Key data: Applicant TA Realty, described as Mitsubishi Estate-backed; portfolio listed under TA Digital Group as ATL02 in Clayton County

CORROBORATED

Limitation: The site-holding LLC name is not published; the Mitsubishi Estate backing is from secondary reporting

Open source →

POWER SUPPLIER and SURROUNDING INFRASTRUCTURE

TADG ATL02

Clayton County / Ellenwood

The developer's portfolio page states the campus includes on-site substation capacity

Key data: On-site substation at the Clayton County / Ellenwood ATL02 site

VERIFIED PRIMARY

Limitation: The utility name, contract, transmission voltage, water and fiber infrastructure are not stated

Open source →

JURISDICTION STACK and PLANNING ZONING CONTACT

TADG ATL02

Clayton County / Ellenwood

Approval authority was the county commission

Key data: Approved by the Clayton County Board of Commissioners

CORROBORATED

Limitation: No case number, planning department contact or named case manager published

Open source →

Show all remaining 43 evidence rows
WATER SUPPLIER, ECON DEV CONTACT, GENERAL CONTACT

TADG ATL02

Clayton County / Ellenwood

NOT_FOUND — searched the developer portfolio and approval coverage; no water utility (Clayton County Water Authority not confirmed), economic development contact or public inquiry channel published

Key data: n.a.

DISCOVERY LEAD

Limitation: Clayton County Water Authority is the presumptive provider by territory but was not confirmed on a fetched page

Open source →

EXACT LOCATION

Amazon ATL089 (application 29883)

Newton County / Covington

The EPD draft permit gives the exact street address and permit number; a permit index adds coordinates

Key data: 11145 Alcovy Road, Covington, GA 30054, Newton County; permit 7374-217-0078-E-01-0; latitude 33.63917, longitude -83.82139

VERIFIED PRIMARY

Limitation: Parcel ID not published; coordinates are from the aggregator record at https://www.canonical.cc/labs/groundwork/site/amazon-data-services-inc-atl089-campus-newton-ga/

Open source →

OWNERSHIP CHAIN and OPERATOR

Amazon ATL089

Newton County / Covington

The permit applicant of record is Amazon's data center subsidiary

Key data: Amazon Data Services Inc. as ATL089 campus operator of record

CORROBORATED

Limitation: Land-holding entity and any local development LLC not identified

Open source →

WATER SUPPLIER

Amazon ATL089

Newton County / Covington

The City of Covington executed a large infrastructure agreement with Amazon whose payments are tied to projected water usage

Key data: Nine-figure infrastructure deal with the City of Covington, with payments related to projected water usage; site described as off Alcovy Road

CORROBORATED

Limitation: Agreement number, gallons-per-day allocation and the specific water source are not published

Open source →

JURISDICTION STACK and PLANNING ZONING CONTACT

Amazon ATL089 and ATL2

Newton County / Covington

Local land-use review runs through the county's development services department and its review committee, with a published phone line; state air permitting is via EPD

Key data: Newton County Department of Development Services and Development Review Committee, 678-625-1650; Georgia EPD Air Protection Branch for permits 29883 and 29898

VERIFIED PRIMARY

Limitation: The department email address was masked on the fetched page; no named planner or case manager published

Open source →

EXACT LOCATION and OWNERSHIP CHAIN

ATL2 LLC / Serverfarm (permit 29898)

Newton County / Covington

The EPD draft permit gives address, AIRS number, permit number, application date and the applicant's mailing address

Key data: 10835 Hazelbrand Rd NE, Covington, GA 30014, Newton County; AIRS 04-13-217-00079; permit 7374-217-0079-S-01-0; Application No. 29898 dated 2025-10-03; mailing address 155 NE 100th St Ste 302, Seattle WA

VERIFIED PRIMARY

Limitation: The Seattle mailing address does not match Serverfarm's corporate base; the ATL2 LLC-to-Serverfarm relationship is asserted by secondary sources, not by the permit

Open source →

POWER SUPPLIER

ATL2 LLC / Serverfarm

Newton County / Covington

The site is designed around an adjacent on-site gas generation plant rather than grid supply from the incumbent utility

Key data: Adjacent VoltaGrid on-site gas plant of approximately 90 MW, not Georgia Power grid supply; 37 diesel backup generators

CORROBORATED

Limitation: No interconnection or power purchase agreement reference; an EPD Notice of Violation dated 2026-07-02 is noted by the same source

Open source →

PLANNING ZONING CONTACT (state)

ATL2 LLC / Serverfarm

Newton County / Covington

The EPD draft permit names the assigned state engineer for the application

Key data: Mr. Sean Taylor, Georgia EPD

VERIFIED PRIMARY

Limitation: Direct phone and email for the named engineer were not captured

Open source →

EXACT LOCATION and OPERATOR

Flexential Douglasville 1 and 2

Douglas County / Douglasville

Flexential publishes both facility addresses on adjoining parcels on North River Road

Key data: Douglasville 1 at 1700 N. River Road, Douglasville, GA 30122; Douglasville 2 at 1750 N. River Road

VERIFIED PRIMARY

Limitation: Parcel IDs and lat-long not published; the second address is at https://www.flexential.com/data-centers/ga/atlanta/douglasville-2-data-center

Open source →

OWNERSHIP CHAIN, POWER SUPPLIER, WATER SUPPLIER, PLANNING ZONING CONTACT, ECON DEV CONTACT, SURROUNDING INFRASTRUCTURE

Flexential Douglasville 1 and 2

Douglas County / Douglasville

NOT_FOUND — Flexential's facility pages are marketing collateral and do not disclose the property-owning entity, utility, water provider, local case contacts or adjacent infrastructure

Key data: n.a.

DISCOVERY LEAD

Limitation: Douglas County jurisdiction contacts in the Douglas County rows above apply by territory; GreyStone Power and DDCWSA are the presumptive utilities

Open source →

EXACT LOCATION

QTS Fayetteville I

Fayette County / Fayetteville

Industry directory and news coverage together give the address and site scale

Key data: 1435 Hwy 54 W, Fayetteville, GA 30214; described in reporting as a 600-acre site 22 miles south of downtown Atlanta

CORROBORATED

Limitation: Parcel ID and lat-long not published; the 600-acre figure comes from https://www.wrdw.com/2026/07/13/records-raise-questions-about-georgias-largest-data-center-its-water-use/

Open source →

OWNERSHIP CHAIN and OPERATOR

QTS Fayetteville I

Fayette County / Fayetteville

QTS is identified as owner and operator, with the entity name given on its community page

Key data: QTS Realty Trust, LLC; QTS Data Centers as operator

VERIFIED PRIMARY

Limitation: Blackstone's ownership of QTS was not stated on any page fetched, so it is not asserted here

Open source →

WATER SUPPLIER

QTS Fayetteville I

Fayette County / Fayetteville

The county water system is the sole supplier, with closed-loop cooling and no private wells, and county billing records document the volumes

Key data: Fayette County Water System with no groundwater or private wells and closed-loop cooling; county billed QTS for 109 million gallons across 13 water lines, with one line billed for 20.6 million gallons; county says QTS uses less than one percent of monthly supply

CORROBORATED

Limitation: Reporting also describes two unauthorized water lines into the facility; no water service agreement number is published

Open source →

JURISDICTION STACK

QTS Fayetteville I

Fayette County / Fayetteville

Stack includes the City of Fayetteville with a local operating ordinance, Fayette County for water, and state DNR/EPD for air

Key data: City quiet-hours ordinance from 10 PM to 7 AM; Fayette County Water System

VERIFIED PRIMARY

Limitation: No special district, development authority or school district identified

Open source →

SURROUNDING INFRASTRUCTURE

QTS Fayetteville I

Fayette County / Fayetteville

Water infrastructure serving the site is documented in county records as a growing set of service lines; the site fronts Highway 54

Key data: 13 water lines serving the site as it expands; frontage on Hwy 54 W

CORROBORATED

Limitation: Substations, transmission lines, sewer trunk mains, rail and fiber not identified

Open source →

POWER SUPPLIER and WATER SUPPLIER

QTS ATL 3 (Augusta)

Richmond County / Augusta

QTS's Augusta community page names both utilities and states the cost-allocation and water-commitment status

Key data: Georgia Power Company, with QTS paying for all project energy infrastructure and no cost impact to existing Georgia Power customers; water discussions with Augusta Utilities and a received will-serve letter

VERIFIED PRIMARY

Limitation: No large-load contract or docket number; the will-serve letter is not published

Open source →

EXACT LOCATION

QTS ATL 3 (Augusta)

Richmond County / Augusta

The site address is not published by QTS; reporting locates the campus by highway and neighborhood, and a state 401 certification exists under a Gordon Highway project name

Key data: Described as off Gordon Highway near the Haynes Station neighborhood in west Augusta; state 401 certification file SAS-2024-00760 titled Gordon Hwy ATL3 Data Center

CORROBORATED

Limitation: No street address, parcel or lat-long confirmed; the 401 summary page at https://epd.georgia.gov/document/document/401-sas-2024-00760-gordon-hwy-atl3-data-center-summary-page/download was identified but not read in full

Open source →

JURISDICTION STACK and PLANNING ZONING CONTACT

QTS ATL 3 (Augusta)

Richmond County / Augusta

The stack spans city-county consolidated government bodies, the state DNR as delegated Clean Air Act authority, and federal reviewers

Key data: City of Augusta and Richmond County; Planning Commission and Board of Commissioners; Georgia Department of Natural Resources as the delegated permitting and enforcement arm under the Clean Air Act; US EPA, U.S. Army Corps of Engineers and U.S. Fish and Wildlife Service also involved

VERIFIED PRIMARY

Limitation: No named case manager, planner, phone or email published

Open source →

EXACT LOCATION

EdgeConneX ATL11

Fulton County / Union City

Two independent sources give the same Stonewall Tell Road address, with land area from the transaction record

Key data: 4810 Stonewall Tell Road, Union City, Fulton County; described as nearly 63 acres along Stonewall Tell Road just north of South Fulton Parkway

CORROBORATED

Limitation: Parcel ID and lat-long not published; a separate industry listing at https://datacenterhawk.com/marketplace/providers/edgeconnex/4810-stonewall-tell-road/atl11 confirms the same address

Open source →

OWNERSHIP CHAIN

EdgeConneX ATL11

Fulton County / Union City

The land traded between named institutional parties, with a separate Microsoft acquisition in the same county, and the article does not name the holding LLCs

Key data: An affiliate of EdgeConneX purchased from an affiliate of TA Realty for $318.5 million, about $5 million per acre; Microsoft separately bought 136 acres in Fulton County in April 2024 for $53.5 million

CORROBORATED

Limitation: Legal entity names for buyer and seller affiliates are not stated in either article

Open source →

OPERATOR

EdgeConneX ATL11

Fulton County / Union City

EdgeConneX designs, builds and operates the campus with Microsoft as the end user

Key data: EdgeConneX will design, build and operate; Microsoft Corp. as end user for its East US 3 region; 324 MW and up to 2.1 million square feet in a $1.8 billion campus, three buildings of about 612,000 square feet each

CORROBORATED

Limitation: Lease terms and building-by-building tenancy not disclosed

Open source →

POWER SUPPLIER

EdgeConneX ATL11

Fulton County / Union City

Power procurement is handled by the development partner through the investor-owned utility and its parent

Key data: TA Realty cited its relationships with Georgia Power and Southern Co. and says it will manage power procurement and secure the necessary utilities

CORROBORATED

Limitation: No electric service agreement, large-load contract or PSC docket reference

Open source →

JURISDICTION STACK and ECON DEV CONTACT

EdgeConneX ATL11

Fulton County / Union City

Incentives run through the county-level development authority, with land use at the city

Key data: Development Authority of Fulton County approved incentives; Union City and Fulton County as governing jurisdictions; Union City Zoning Commission as the local land-use body

CORROBORATED

Limitation: No named DAFC staff contact, phone or email; the Union City Zoning Commission reference comes from https://www.fox5atlanta.com/news/union-city-data-center-buffington-road-jonesboro-road-zoning which covers a different Union City site at Buffington Road and Jonesboro Road

Open source →

WATER SUPPLIER, PLANNING ZONING CONTACT, GENERAL CONTACT, SURROUNDING INFRASTRUCTURE

EdgeConneX ATL11

Fulton County / Union City

NOT_FOUND — no water utility or agreement, named Union City or Fulton County case manager, project public contact, or substation/transmission/water-main/rail/fiber detail was published on the pages fetched; the only contact channel found is the corporate website

Key data: www.edgeconnex.com as the sole published contact channel; nearest catalogued facility is EdgeConneX ATL12 at 0.13 miles

DISCOVERY LEAD

Limitation: Union City and Fulton County utility departments were not fetched this session

Open source →

EXACT LOCATION

The Keep 2 Campus (Switch KEEP 2.0 Atlanta North)

Bartow County / Cartersville

Both the public record and the local development authority describe the site by intersection, acreage and adjacency rather than a street address

Key data: 126 acres south of the intersection of Old Alabama Road and Bates Road, stretching to the Paulding County line, due west of LakePoint and adjoining the Carters Grove area; public record describes the site as within the City of Cartersville

CORROBORATED

Limitation: No street address, parcel ID or lat-long published by either source

Open source →

OWNERSHIP CHAIN and OPERATOR

The Keep 2 Campus (Switch)

Bartow County / Cartersville

The developer of record is Switch, and the company's base is stated, but no local land-holding entity is named

Key data: Developer Switch, LTD; Switch is based in Las Vegas and was founded in 2000

CORROBORATED

Limitation: Legal owner and applicant entity are not stated in the record

Open source →

POWER SUPPLIER and SURROUNDING INFRASTRUCTURE

The Keep 2 Campus (Switch)

Bartow County / Cartersville

The public record names the municipal utility as the electric provider, and the project includes its own substation

Key data: Cartersville Municipal Utilities as electric utility and grid operator; the initial data center phase is planned with an electrical substation

CORROBORATED

Limitation: No contract, transmission voltage, water main, rail or fiber detail; the substation reference is from the Cartersville-Bartow economic development article

Open source →

WATER SUPPLIER

The Keep 2 Campus (Switch)

Bartow County / Cartersville

The city water department is the utility for the Cartersville site, drawing from a named reservoir with a named treatment plant

Key data: City of Cartersville Water Department; source Lake Allatoona; Clarence B. Walker Water Treatment Plant; 237 miles of distribution lines and more than 170 miles of sewer lines; wastewater discharged to the Etowah River

VERIFIED PRIMARY

Limitation: Utility attribution is by jurisdiction; no Switch-specific water service agreement was located

Open source →

JURISDICTION STACK and ECON DEV CONTACT

The Keep 2 Campus (Switch)

Bartow County / Cartersville

The project filed a development of regional impact statement with the state, and the local economic development office publishes its address, main line and named staff

Key data: Development of regional impact statement filed with the state; Cartersville-Bartow County Economic Development, P.O. Box 2224, Cartersville, GA 30120, 770.607.1199; named contacts Melinda Lemmon 404-218-2180, Matthew Thomas 678-899-2484, Connor Nicholson 678-956-3220

VERIFIED PRIMARY

Limitation: Staff titles are not stated on the page, and email addresses were rendered only through JavaScript; the reviewing state agency for the DRI is not named

Open source →

PLANNING ZONING CONTACT

The Keep 2 Campus (Switch)

Bartow County / Cartersville

NOT_FOUND — neither the public record nor the economic development article names a planning or zoning department, commission, case number or planner for this site

Key data: n.a.

DISCOVERY LEAD

Limitation: City of Cartersville planning department pages were not fetched this session

Open source →

EXACT LOCATION and OWNERSHIP CHAIN

Core Scientific Dalton (DNN1/DNN2)

Whitfield County / Dalton

A facility index gives the street address, exact coordinates and the owner, while Core Scientific's own page does not publish an address

Key data: 2205 Industrial South Rd, Dalton, GA 30721; latitude 34.71316, longitude -84.95143; owner Core Scientific

CORROBORATED

Limitation: Parcel ID not published; the company's own page at https://corescientific.com/high-density-data-centers/dalton-ga-dnn1-2/ discloses no address, utility, water or contact detail

Open source →

POWER SUPPLIER

Core Scientific Dalton

Whitfield County / Dalton

The municipal utility is the named supplier, with its generation mix documented

Key data: Dalton Utilities as the local utility from which the facility sources power; Dalton Utilities sources 90.57 percent of its MWh from two nuclear plants, Plant Vogtle and Plant Hatch, and also uses coal, gas, hydro and solar

CORROBORATED

Limitation: No contract or rate schedule reference; a separate news report on a Dalton Utilities transfer fee and an Old Tilton Road rezoning was identified but not fetched

Open source →

SURROUNDING INFRASTRUCTURE

Core Scientific Dalton

Whitfield County / Dalton

The operator positions the site on regional fiber between three data center markets, without naming specific assets

Key data: Between the Chattanooga, Nashville and Atlanta data center markets with access to high-speed fiber networks

VERIFIED PRIMARY

Limitation: No named substations, transmission lines, water or sewer mains, highways or rail

Open source →

WATER SUPPLIER, JURISDICTION STACK (local), PLANNING ZONING CONTACT, ECON DEV CONTACT, GENERAL CONTACT

Core Scientific Dalton

Whitfield County / Dalton

NOT_FOUND — neither the operator page nor the facility index names a water provider, a Whitfield County or City of Dalton planning contact, an economic development contact or a public inquiry channel

Key data: n.a.

DISCOVERY LEAD

Limitation: Dalton Utilities also provides water and sewer in this service area, but that role was not confirmed on a fetched page

Open source →

EXACT LOCATION

White Oak Technology Park rezoning RZ260304

Columbia County

The planning commission record identifies the subject property by tax map reference and access road rather than address

Key data: Tax map 019 Partial 002 C; access from Morris Callaway Road; adjacent to White Oak Technology Park with existing data center zoning nearby

CORROBORATED

Limitation: No street address or lat-long; secondary transcript-based source rather than the county's own case file

Open source →

PLANNING ZONING CONTACT and ECON DEV CONTACT

White Oak Technology Park rezoning RZ260304

Columbia County

The hearing record identifies the reviewing body, a partially named staff planner, and the development authority representative

Key data: Columbia County Planning Commission; "Planner Will" with no surname stated; Development Authority represented by Chaney Eldridge

DISCOVERY LEAD

Limitation: No full name, phone or email for either contact; the Development Authority of Columbia County site was identified but not fetched

Open source →

JURISDICTION STACK and SURROUNDING INFRASTRUCTURE

Columbia County data center rezonings (context for RZ260304)

Columbia County

Countywide coverage documents the scale of the rezoning package, the approving body, the conditions imposed and the road corridors involved

Key data: 39 parcels totaling about 4,500 acres across three projects; Columbia County Board of Commissioners approved White Oak and Pumpkin Center rezonings 4-1 and disapproved the Byrd Farm Technology Campus 4-1; noise capped at 60 decibels at property lines; 500-foot buffers with 12-foot berms at Pumpkin Center; corridors are Appling-Harlem Highway, Wrightsboro Road and Lonergan Hulme Road

CORROBORATED

Limitation: Individual dissenting commissioners are named (Alison Couch, District 4; Connie Melear, District 1) but applicant entities are not; no substation, transmission, water main, rail or fiber detail

Open source →

WATER SUPPLIER

White Oak Technology Park rezoning RZ260304

Columbia County

The county and developers stated cooling water would not come from wells, and closed-loop cooling was cited, but no supplier was named in either record

Key data: Water consumption would not draw from wells; closed-loop cooling can reduce freshwater use by as much as 70 percent by one estimate; residents' questions about private wells were left unresolved in the planning record

CORROBORATED

Limitation: Columbia County Water Utility is the presumptive provider but was not named on a fetched page; sewer extension is expected to be handled through standard engineering review

Open source →

OWNERSHIP CHAIN, OPERATOR, POWER SUPPLIER

White Oak Technology Park rezoning RZ260304

Columbia County

NOT_FOUND — neither the planning record nor the newspaper coverage names the applicant entity, the end-user operator or the electric utility for RZ260304

Key data: n.a.

DISCOVERY LEAD

Limitation: The county's own RZ260304 case file was not located through search this session

Open source →

POWER SUPPLIER (regulatory)

Georgia Power Large Load Contract Filing (Docket 44280)

Statewide / Effingham County

An intervenor letter to the commission identifies the docket, the specific filing and the terms at issue in the OpenAI large-load contract

Key data: Georgia PSC Docket No. 44280 (Georgia Power 2022 Rate Case); Document Filing #227259, "Large Load Contract Filing - 7.15.26"; 3.2 gigawatt projected OpenAI load requiring roughly 3,000 MW of generation; intervenors urged a 500 MW / $1 billion approval threshold, minimum billing demand of at least 80 percent (90 percent under consideration) and contract terms of at least twenty years; objection deadline August 14, 2026

VERIFIED PRIMARY

Limitation: This is an intervenor filing, not a commission order; the recommended terms are advocacy positions, not approved conditions

Open source →

OWNERSHIP CHAIN, OPERATOR, POWER SUPPLIER

Georgia Power / OpenAI contract

Effingham County

The utility announced commission approval of the contract, confirming the load, the cost-allocation principle and the demand-response commitment; the utility's parent is identified in the intervenor letter

Key data: Contract includes 3,200 MW of new demand with OpenAI paying the full cost of infrastructure needed to serve it and committing up to 1,000 MW of flexible demand response; filed with the Georgia PSC in July; Georgia Power's parent is Southern Company

VERIFIED PRIMARY

Limitation: The press release does not state the docket number; project owner, operator and site address are not disclosed

Open source →

EXACT LOCATION and JURISDICTION STACK

Georgia Power / OpenAI project site

Effingham County

Reporting locates the 3.2 GW project inside a named industrial hub and identifies the county development authority

Key data: Savannah Gateway Industrial Hub, Effingham County; Georgia Public Service Commission as regulator; Effingham County Development Authority

CORROBORATED

Limitation: No street address, parcel, lat-long, water supplier or named contacts published; this project sits outside the metro-Atlanta project set but is the load behind Docket 44280

Open source →

POWER SUPPLIER (cross-cutting)

Georgia Power large-load cost recovery rule

Statewide

The Georgia PSC has approved a mechanism letting the utility charge new data centers for the infrastructure they trigger, which frames every Georgia Power-served project above

Key data: The PSC approved a rule allowing Georgia Power to charge new data centers for site-specific infrastructure, generation, transmission and distribution

CORROBORATED

Limitation: Described secondhand by a cooperative rather than in the PSC rule text; the rule citation was not captured

Open source →

Georgia project / topic roster

Research currently compiled for Georgia

56 project/topic labels are retained here, including unresolved aliases that still require canonical reconciliation.

Project or topicEvidence state
ATL2 Data Center — proposed development of a data center campus with diesel-fired generatorsSource-backed / reconciliation-aware
ATL2 LLC / ServerfarmSource-backed / reconciliation-aware
ATL2 LLC / Serverfarm (permit 29898)Source-backed / reconciliation-aware
ATL2, LLC (Serverfarm) — permit 29898, AIRS 217-00079Source-backed / reconciliation-aware
Agricultural Impact Mitigation Agreement (AIMA) programSource-backed / reconciliation-aware
Amazon ATL089Source-backed / reconciliation-aware
Amazon ATL089 (application 29883)Source-backed / reconciliation-aware
Amazon ATL089 and ATL2Source-backed / reconciliation-aware
Amazon Data Services ATL089 (application 29883, permit 7374-217-0078-e-01-0)Source-backed / reconciliation-aware
Amazon Data Services, Inc. ATL089 Campus — construction of a data centerSource-backed / reconciliation-aware
CUMULATIVE — ATL089, ATL2, Meta and neighborsSource-backed / reconciliation-aware
CUMULATIVE — regional air/water agency assessmentSource-backed / reconciliation-aware
Columbia County data center rezonings (context for RZ260304)Source-backed / reconciliation-aware
Core Scientific DaltonSource-backed / reconciliation-aware
Core Scientific Dalton (DNN1/DNN2)Source-backed / reconciliation-aware
Core Scientific-DaltonSource-backed / reconciliation-aware
Core Scientific-Dalton 4 Enterprise Drive — new data center with 80 diesel-fired emergency generatorsSource-backed / reconciliation-aware
Data-center development within White Oak Technology Park; rezoning from RA and M-1 to DC (data center district)Source-backed / reconciliation-aware
Douglas County data center land-use contextSource-backed / reconciliation-aware
EdgeConneX ATL11Source-backed / reconciliation-aware
EdgeConneX ATL11 (Union City) — host-community contextSource-backed / reconciliation-aware
EdgeConneX ATL11 area (Union City)Source-backed / reconciliation-aware
EdgeConneX ATL11 — eight additional 1,750 kW back-of-house emergency generators (10 total) plus tier reclassification of 42 existing generatorsSource-backed / reconciliation-aware
Flexential Corporation — construction and operation of 33 diesel-fired emergency generatorsSource-backed / reconciliation-aware
Flexential DouglasvilleSource-backed / reconciliation-aware
Flexential Douglasville 1 and 2Source-backed / reconciliation-aware
Georgia Power "Large Load Contract Filing – 7.15.26" (contracts for large loads, the category that covers data-center customers)Source-backed / reconciliation-aware
Georgia Power / OpenAI contractSource-backed / reconciliation-aware
Georgia Power / OpenAI project siteSource-backed / reconciliation-aware
Georgia Power / PSC (Docket 44280 and related)Source-backed / reconciliation-aware
Georgia Power Large Load Contract Filing (Docket 44280)Source-backed / reconciliation-aware
Georgia Power large-load cost recovery ruleSource-backed / reconciliation-aware
GreyStone Power large-load frameworkSource-backed / reconciliation-aware
QTS (Atlanta campus, Beltline) — incentive precedentSource-backed / reconciliation-aware
QTS ATL 3 (Augusta)Source-backed / reconciliation-aware
QTS ATL 3 (Gordon Highway)Source-backed / reconciliation-aware
QTS ATL 3 Campus — installation of emergency engines at a data centerSource-backed / reconciliation-aware
QTS Fayetteville ISource-backed / reconciliation-aware
QTS Fayetteville I, LLC — installation of additional emergency generatorsSource-backed / reconciliation-aware
SDC ATLASource-backed / reconciliation-aware
SDC ATLA (Stream Data Centers)Source-backed / reconciliation-aware
SDC ATLA (permit 29802)Source-backed / reconciliation-aware
SDC ATLA area / TC Atlanta Development (Winston)Source-backed / reconciliation-aware
SDC ATLA — construction and operation of a data center with 315 diesel-fired emergency generatorsSource-backed / reconciliation-aware
SDC ATLA, LLC (permit application 29802, AIRS 097-00103)Source-backed / reconciliation-aware
SDC ATLA; TADG ATL02; ATL089; ATL2; QTS ATL3; RZ260304; The Keep 2Source-backed / reconciliation-aware
TADG ATL02Source-backed / reconciliation-aware
TADG ATL02 (Ellenwood) — host-community contextSource-backed / reconciliation-aware
TADG – ATL02 / Ellenwood — construct and operate an "advanced technology ecosystem" data centerSource-backed / reconciliation-aware
TC Atlanta Development (Winston)Source-backed / reconciliation-aware
The Keep 2 Campus (Switch KEEP 2.0 Atlanta North)Source-backed / reconciliation-aware
The Keep 2 Campus (Switch)Source-backed / reconciliation-aware
The Keep 2 Campus (Switch) — county policySource-backed / reconciliation-aware
The Keep 2 Campus — installation of new additional emergency generatorsSource-backed / reconciliation-aware
White Oak Technology Park (RZ260304)Source-backed / reconciliation-aware
White Oak Technology Park rezoning RZ260304Source-backed / reconciliation-aware
Research and local discovery

Find data center projects and the public records around them in Georgia.

This state page combines mapped locations with permits, planning and zoning activity, infrastructure context, operators and civic records. The deeper corpus is supplemented by 7 accepted rows from the validated national refresh. Counts describe evidence records, not unique facilities.

Where a source does not establish a location, utility, water supplier or other fact, that gap remains explicit rather than being converted into an unsupported map point or claim.

See the evidence and publication methodology →

Georgia Data Centers, Projects & Compute Infrastructure Research | Compute Equity Atlas