Source-backed project record · GA

White Oak Technology Park rezoning RZ260304

This record consolidates 7 research observations while retaining source distinctions, location precision and unresolved fields.

unknownproject status
CORROBORATEDbest evidence tier
7linked evidence rows
Project facts

Location and operating record

Operator / developerNot established in current evidence
JurisdictionColumbia County, GA
AddressNot published
Location precisionparcel or bounded site
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesWhite Oak Technology Park rezoning RZ260304
Evidence coverage

What has been researched

Project profile4 rows
Intent / permits0 rows
Civic / infrastructure0 rows
EXACT LOCATION

White Oak Technology Park rezoning RZ260304: exact location

CORROBORATED

The planning commission record identifies the subject property by tax map reference and access road rather than address

Key data: Tax map 019 Partial 002 C; access from Morris Callaway Road; adjacent to White Oak Technology Park with existing data center zoning nearby

Claim classification: Not yet assigned · Retrieved: 2026-08-29

Limitation: No street address or lat-long; secondary transcript-based source rather than the county's own case file

Open source 1 →

PLANNING ZONING CONTACT and ECON DEV CONTACT

White Oak Technology Park rezoning RZ260304: planning zoning contact and econ dev contact

DISCOVERY_LEAD

The hearing record identifies the reviewing body, a partially named staff planner, and the development authority representative

Key data: Columbia County Planning Commission; "Planner Will" with no surname stated; Development Authority represented by Chaney Eldridge

Claim classification: Not yet assigned · Retrieved: 2026-08-29

Limitation: No full name, phone or email for either contact; the Development Authority of Columbia County site was identified but not fetched

Open source 1 →

WATER SUPPLIER

White Oak Technology Park rezoning RZ260304: water supplier

CORROBORATED

The county and developers stated cooling water would not come from wells, and closed-loop cooling was cited, but no supplier was named in either record

Key data: Water consumption would not draw from wells; closed-loop cooling can reduce freshwater use by as much as 70 percent by one estimate; residents' questions about private wells were left unresolved in the planning record

Claim classification: Not yet assigned · Retrieved: 2026-08-29

Limitation: Columbia County Water Utility is the presumptive provider but was not named on a fetched page; sewer extension is expected to be handled through standard engineering review

Open source 1 →

OWNERSHIP CHAIN, OPERATOR, POWER SUPPLIER

White Oak Technology Park rezoning RZ260304: ownership chain, operator, power supplier

DISCOVERY_LEAD

NOT_FOUND — neither the planning record nor the newspaper coverage names the applicant entity, the end-user operator or the electric utility for RZ260304

Claim classification: Not yet assigned · Retrieved: 2026-08-29

Limitation: The county's own RZ260304 case file was not located through search this session

Open source 1 →

COMMUNITY OPPOSITION OR LITIGATION

White Oak Technology Park rezoning RZ260304: community opposition or litigation

Recommended / partially denied

Residents pressed planners on Mar 5, 2026 over noise, construction traffic, water/wells, geothermal drilling, buildout timeline, and incentives; the Planning Commission recommended approval with conditions by **voice vote**, sending RZ260304 to the Board of Commissioners for Mar 17, 2026. In the broader Columbia County round, commissioners **disapproved one of three** proposed data centers on Feb 4, 2026 — a partial win for opponents.

Key data: RZ260304 recommended by voice vote 2026-03-05; BOC action 2026-03-17; 1 of 3 county projects disapproved

Claim classification: Not yet assigned · Retrieved: 2026-08-29

Status date: 2026-03-17

Limitation: No numeric vote tally; Augusta Chronicle read as a search result.

AGRICULTURAL OR LAND USE CONVERSION

White Oak Technology Park rezoning RZ260304: agricultural or land use conversion

Recommended/approved

The parcel (tax map 019 Partial 002 C) is rezoned from **RA and M-1 to DC** (data center district); the county's earlier White Oak application covered **1,945.05 acres** between Harlem and Appling and the Feb 2026 approvals were characterized as "rural rezonings." No agricultural-impact mitigation requirement is mentioned.

Key data: RA + M-1 → DC; broader park application 1,945.05 acres

Claim classification: Not yet assigned · Retrieved: 2026-08-29

Status date: 2026-03-17

Limitation: The page does not explicitly state that RA means "Residential-Agricultural"; Augusta Chronicle read as a search result.

NOISE OR TRAFFIC IMPACT

White Oak Technology Park rezoning RZ260304: noise or traffic impact

Recommended with conditions

The clearest Georgia noise/traffic finding, including an internal inconsistency: the rezoning narrative and the conditions carry **different thresholds — 70 decibels in the narrative versus 65 decibels in the conditions** — and **construction-phase traffic has not been studied**, despite resident estimates of thousands of construction workers and a disputed buildout timeline (public materials say 15–20 years; a county official said five).

Key data: 70 dB (narrative) vs 65 dB (conditions); no construction traffic study

Claim classification: Not yet assigned · Retrieved: 2026-08-29

Status date: 2026-03-05

Limitation: Meeting-coverage aggregator; the county's rezoning conditions document was not fetched to confirm which threshold governs.

Sources

Evidence and provenance

  • Citizen Portal ↗ · Retrieved 2026-08-29 · CORROBORATED
    Limitation: No street address or lat-long; secondary transcript-based source rather than the county's own case file
  • The Augusta Chronicle ↗ · Retrieved 2026-08-29 · CORROBORATED
    Limitation: Columbia County Water Utility is the presumptive provider but was not named on a fetched page; sewer extension is expected to be handled through standard engineering review

Open GA state research →