This canonical record consolidates 7 source-backed observations without discarding aliases, limitations or unresolved dimensions.

approved_or_permittedproject status
CORROBORATEDbest evidence tier
7linked evidence rows
Project facts

Location and operating record

Operator / developerNot established in current evidence
JurisdictionColumbia County, GA
AddressNot published
Location precisionparcel or bounded site
Coordinatesnull, null
CapacityNot established
AliasesWhite Oak Technology Park rezoning RZ260304
Evidence coverage

What has been researched

Project profile4 rows
Intent / permits0 rows
Civic / infrastructure3 rows
EXACT LOCATION

White Oak Technology Park rezoning RZ260304: exact location

CORROBORATED

The planning commission record identifies the subject property by tax map reference and access road rather than address

Key data: Tax map 019 Partial 002 C; access from Morris Callaway Road; adjacent to White Oak Technology Park with existing data center zoning nearby

Limitation: No street address or lat-long; secondary transcript-based source rather than the county's own case file

Open source →

PLANNING ZONING CONTACT and ECON DEV CONTACT

White Oak Technology Park rezoning RZ260304: planning zoning contact and econ dev contact

DISCOVERY_LEAD

The hearing record identifies the reviewing body, a partially named staff planner, and the development authority representative

Key data: Columbia County Planning Commission; "Planner Will" with no surname stated; Development Authority represented by Chaney Eldridge

Limitation: No full name, phone or email for either contact; the Development Authority of Columbia County site was identified but not fetched

Open source →

WATER SUPPLIER

White Oak Technology Park rezoning RZ260304: water supplier

CORROBORATED

The county and developers stated cooling water would not come from wells, and closed-loop cooling was cited, but no supplier was named in either record

Key data: Water consumption would not draw from wells; closed-loop cooling can reduce freshwater use by as much as 70 percent by one estimate; residents' questions about private wells were left unresolved in the planning record

Limitation: Columbia County Water Utility is the presumptive provider but was not named on a fetched page; sewer extension is expected to be handled through standard engineering review

Open source →

OWNERSHIP CHAIN, OPERATOR, POWER SUPPLIER

White Oak Technology Park rezoning RZ260304: ownership chain, operator, power supplier

DISCOVERY_LEAD

NOT_FOUND — neither the planning record nor the newspaper coverage names the applicant entity, the end-user operator or the electric utility for RZ260304

Limitation: The county's own RZ260304 case file was not located through search this session

Open source →

COMMUNITY OPPOSITION OR LITIGATION

White Oak Technology Park rezoning RZ260304: community opposition or litigation

Recommended / partially denied

Residents pressed planners on Mar 5, 2026 over noise, construction traffic, water/wells, geothermal drilling, buildout timeline, and incentives; the Planning Commission recommended approval with conditions by **voice vote**, sending RZ260304 to the Board of Commissioners for Mar 17, 2026. In the broader Columbia County round, commissioners **disapproved one of three** proposed data centers on Feb 4, 2026 — a partial win for opponents.

Key data: RZ260304 recommended by voice vote 2026-03-05; BOC action 2026-03-17; 1 of 3 county projects disapproved

Status date: 2026-03-17

Limitation: No numeric vote tally; Augusta Chronicle read as a search result.

Open source →

AGRICULTURAL OR LAND USE CONVERSION

White Oak Technology Park rezoning RZ260304: agricultural or land use conversion

Recommended/approved

The parcel (tax map 019 Partial 002 C) is rezoned from **RA and M-1 to DC** (data center district); the county's earlier White Oak application covered **1,945.05 acres** between Harlem and Appling and the Feb 2026 approvals were characterized as "rural rezonings." No agricultural-impact mitigation requirement is mentioned.

Key data: RA + M-1 → DC; broader park application 1,945.05 acres

Status date: 2026-03-17

Limitation: The page does not explicitly state that RA means "Residential-Agricultural"; Augusta Chronicle read as a search result.

Open source →

NOISE OR TRAFFIC IMPACT

White Oak Technology Park rezoning RZ260304: noise or traffic impact

Recommended with conditions

The clearest Georgia noise/traffic finding, including an internal inconsistency: the rezoning narrative and the conditions carry **different thresholds — 70 decibels in the narrative versus 65 decibels in the conditions** — and **construction-phase traffic has not been studied**, despite resident estimates of thousands of construction workers and a disputed buildout timeline (public materials say 15–20 years; a county official said five).

Key data: 70 dB (narrative) vs 65 dB (conditions); no construction traffic study

Status date: 2026-03-05

Limitation: Meeting-coverage aggregator; the county's rezoning conditions document was not fetched to confirm which threshold governs.

Open source →

Sources

Evidence and provenance

  • Citizen Portal · CORROBORATED
    Limitation: No street address or lat-long; secondary transcript-based source rather than the county's own case file
  • The Augusta Chronicle · CORROBORATED
    Limitation: Columbia County Water Utility is the presumptive provider but was not named on a fetched page; sewer extension is expected to be handled through standard engineering review
  • Citizen Portal; Augusta Chronicle · CORROBORATED
    Limitation: No numeric vote tally; Augusta Chronicle read as a search result.
  • Citizen Portal; Augusta Chronicle · CORROBORATED
    Limitation: The page does not explicitly state that RA means "Residential-Agricultural"; Augusta Chronicle read as a search result.
  • Citizen Portal (Columbia County hearing coverage) · CORROBORATED
    Limitation: Meeting-coverage aggregator; the county's rezoning conditions document was not fetched to confirm which threshold governs.

Open GA state research →

White Oak Technology Park rezoning RZ260304 Data Center Project | Columbia County | Compute Equity Atlas