operational
Crypto-to-HPC evolution: originally described as bitcoin-related in the 2023 county agreement, announced in 2025 as a high-performance computing data center. Data center MW capacity was not disclosed; the 122 MW figure is the host wind farm nameplate, not the compute load.
Key data: Co-located behind the Elbow Creek wind farm (122 MW nameplate, commissioned 2008, repowered 2019) | ERCOT
Claim classification: Not yet assigned
Status date: 2026-09-05