Eneus Energy RGV Data Center (Harlingen)

This record consolidates 26 research observations while retaining source distinctions, location precision and unresolved fields.

proposed_or_reviewproject status
CORROBORATEDbest evidence tier
26linked evidence rows
Project facts

Location and operating record

Operator / developerNOT_FOUND
JurisdictionHarlingen, TX
AddressNOT_FOUND
Location precisionparcel or bounded site
CoordinatesNot published; no coordinate inferred
Capacity2000 MW
AliasesEneus Energy RGV Data Center (Harlingen) · RGV Data Center campus east/northeast of Valley International Airport · RGV Data Center · Eneus Harlingen project
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure2 rows
SOURCE RECORD

Eneus Energy RGV Data Center (Harlingen): source record

planned

Up to 16 data halls / 2 GW. Two additional unnamed firms were reported in pre-permitting talks with Cameron County as of May 2026 (see separate discovery-lead record).

Key data: NOT_FOUND | ERCOT (South / Lower Rio Grande Valley) | Harlingen WaterWorks System | NOT_FOUND

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

OWNERSHIP AND PROFILE

Eneus Energy RGV Data Center (Harlingen): ownership and profile

planned

Developer: Eneus Energy | Owner: Land under contract from Stone Brothers (Raymondville); project entity RGV Property Group, LLC / RGV Property LLC (Overland Park, KS) | Property entity: RGV Property Group, LLC | Permit applicant: RGV Property LLC (SVP Dominic Serpe letter to PUCT) | County: Cameron | Research region: East Texas / South Texas-RGV / Statewide Rural Gap Pass

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

POWER AND GRID

Eneus Energy RGV Data Center (Harlingen): power and grid

planned

Key data: Grid area: ERCOT (South / Lower Rio Grande Valley) | Gross MW: 2000 | Requested load MW: 2000 | Transmission: Planned 765 kV transmission line

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

WATER AND COOLING

Eneus Energy RGV Data Center (Harlingen): water and cooling

planned

Key data: Water utility: Harlingen WaterWorks System | Water source: Reclaimed municipal wastewater effluent | Water demand: Up to 4.6 million gallons per day of effluent at $0.75 per 1,000 gallons (~$1.2 million/year) | Cooling: closed-cycle cooling using reclaimed wastewater | Wastewater: Uses Harlingen WaterWorks treated effluent as cooling supply

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

PERMITS AND JURISDICTION

Eneus Energy RGV Data Center (Harlingen): permits and jurisdiction

planned

Key data: Jurisdictions: City of Harlingen (120-day moratorium and environmental impact study) | Cameron County (pre-permitting talks; no abatements offered) | PUCT | Harlingen WaterWorks System

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

CIVIC AND COMMUNITY

Eneus Energy RGV Data Center (Harlingen): civic and community

planned

Harlingen 120-day moratorium plus environmental impact study

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

Cameron County declines to offer tax abatements

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

ENVIRONMENT AND SITE

Eneus Energy RGV Data Center (Harlingen): environment and site

planned

Effluent reuse avoids potable draw but diverts up to 4.6 MGD of reclaimed water

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

Environmental impact study required by city

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

Key data: Surrounding infrastructure: Nine metro fiber providers within 10 miles

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

Key data: Surrounding infrastructure: Valley International Airport adjacency

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

planned

Key data: Surrounding infrastructure: Planned 765 kV line

Claim classification: Not yet assigned

Status date: 2026-09-05

Open source 1 →

TIMELINE

Eneus Energy RGV Data Center (Harlingen): timeline

planned

Mangum Economics impact study prepared for the project

Claim classification: Not yet assigned

Status date: 2025-08-04

Open source 1 →

planned

Records reveal UK-based Eneus Energy plans massive Harlingen data center

Claim classification: Not yet assigned

Status date: 2025-11-25

Open source 1 →

planned

Cameron County considering data center near Harlingen airport; 1,780 acres in county records

Claim classification: Not yet assigned

Status date: 2026-01-13

Open source 1 →

planned

Land purchase deadline under contract with Stone Brothers

Claim classification: Not yet assigned

Status date: 2026-04

Open source 1 →

planned

Harlingen sets 120-day moratorium as two data centers show interest in the county

Claim classification: Not yet assigned

Status date: 2026-05-20

Open source 1 →

CAPACITY GROSS POWER

Eneus Energy RGV Data Center (Harlingen): capacity gross power

planned

The project is planned for up to 2 GW across 16 data halls with more than $14 billion of capital expenditure.

Key data: Up to 2,000 MW; 16 data halls; $14B+

Claim classification: reported_fact · Verification: corroborated_two_sources · Retrieved: 2026-09-05

Status date: 2025-11-25

Limitation: No interconnection agreement documented.

Open source 1 →

OWNERSHIP CHAIN

Eneus Energy RGV Data Center (Harlingen): ownership chain

planned

Records identify RGV Property Group, LLC / RGV Property LLC of Overland Park, Kansas as the project entity, with CEO Roberto Serrano and SVP Dominic Serpe writing to the PUCT; land is under contract from Stone Brothers of Raymondville.

Key data: RGV Property Group, LLC; Stone Brothers land contract

Claim classification: records_based_reporting · Verification: single_source · Retrieved: 2026-09-05

Status date: 2025-11-25

Limitation: PUCT docket number not retrieved this session.

Open source 1 →

CAMPUS ACRES

Eneus Energy RGV Data Center (Harlingen): campus acres

planned

The site covers roughly 1,785 acres east and northeast of Valley International Airport, listed as 1,780 acres in county records.

Key data: 1,785 acres (1,780 in county records)

Claim classification: reported_fact · Verification: corroborated_two_sources · Retrieved: 2026-09-05

Status date: 2026-01-13

Limitation: No parcel IDs published.

Open source 1 →

WATER SUPPLIER

Eneus Energy RGV Data Center (Harlingen): water supplier

planned

An agreement with Harlingen WaterWorks provides up to 4.6 million gallons per day of treated effluent at $0.75 per 1,000 gallons, roughly $1.2 million per year.

Key data: Up to 4.6 MGD effluent at $0.75/1,000 gal (~$1.2M/yr)

Claim classification: records_based_reporting · Verification: single_source · Retrieved: 2026-09-05

Status date: 2025-11-25

Limitation: Executed contract not fetched directly.

Open source 1 →

COOLING TECHNOLOGY

Eneus Energy RGV Data Center (Harlingen): cooling technology

planned

The design uses closed-cycle cooling supplied with reclaimed wastewater rather than potable water.

Key data: Closed-cycle cooling on reclaimed effluent

Claim classification: developer_claim · Verification: corroborated_two_sources · Retrieved: 2026-09-05

Status date: 2025-11-25

Open source 1 →

TRANSMISSION

Eneus Energy RGV Data Center (Harlingen): transmission

planned

A 765 kV transmission line is planned to serve the campus.

Key data: Planned 765 kV line

Claim classification: developer_claim · Verification: single_source · Retrieved: 2026-09-05

Status date: 2025-11-25

Limitation: No PUCT CCN docket retrieved.

Open source 1 →

ZONING LAND USE

Eneus Energy RGV Data Center (Harlingen): zoning land use

planned

Harlingen set a 120-day moratorium on May 20, 2026 and required an environmental impact study, while two data center firms showed interest in the county.

Key data: 120-day moratorium set 2026-05-20

Claim classification: reported_fact · Verification: single_source · Retrieved: 2026-09-05

Status date: 2026-05-20

Limitation: Moratorium expiry and outcome not documented.

Open source 1 →

ECONOMIC DEVELOPMENT

Eneus Energy RGV Data Center (Harlingen): economic development

planned

A Mangum Economics impact study dated August 4, 2025 supported the project, which is presented as about 1,000 jobs including roughly 360 data center positions; Cameron County said it would not offer abatements.

Key data: ~1,000 jobs (360 DC); Mangum Economics study 2025-08-04

Claim classification: reported_fact · Verification: corroborated_two_sources · Retrieved: 2026-09-05

Status date: 2026-01-13

Limitation: Study not fetched directly.

Open source 1 →

FIBER NETWORK

Eneus Energy RGV Data Center (Harlingen): fiber network

planned

Nine metro fiber providers are within 10 miles of the site.

Key data: 9 metro fiber providers within 10 miles

Claim classification: developer_claim · Verification: single_source · Retrieved: 2026-09-05

Open source 1 →

Sources

Evidence and provenance

Open TX state research →

Eneus Energy RGV Data Center (Harlingen) Data Center Project | Harlingen | Compute Equity Atlas